USPTO serial 79288225
Reviewed by CopyMark Law Group
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Julianne Abelman
Julianne Abelman Womble Bond Dickinson (US) LLP950 3rd Avenue, Suite 2400New York, NY 10022UNITED STATES| Class | Description | Status | First use |
|---|---|---|---|
| 001 | Hydrogen; liquid and gaseous surface coating compositions in the nature of chemicals for use in industry | ACTIVE | — |
| 007 | Hydrogen filling fuel pumps for service stations; gas operated welding and cutting machines; plasma cutting machines; plasma welding machines; electric welding machines; electric cutting apparatus; electric arc welding machines and electric arc cutting machines; laser welding machines; gas spot welding guns; welding apparatus, gas operated; industrial robots for welding; electric soldering apparatus; plasma welding and cutting torches; plasma surface treatment machines in the nature of machines utilizing rotational motion for high energy surface finishing and material treatment; plasma spraying machines | ACTIVE | — |
| 009 | Accumulators for solar energy; electric batteries and charging stations for electric vehicles; electrical transformers; fuel cells; solar energy converters, mainly consisting of transformers, inverters, solar inverters and measuring and control units therefor; electric power distribution units; electric and electronic apparatus for measuring, controlling, analysing, regulating, switching and storage of electricity, namely, electrical controllers, electric storage batteries, instruments for conveying, distributing, transforming, storing, regulating or controlling electric current; current converters and voltage converters, in particular for welding and cutting machines; energy supply installations and systems, namely, photovoltaic systems that convert sunlight into electric and thermal energy; Downloadable and recorded computer software for configuration, control and evaluation of solar inverter products; downloadable software in form of a mobile application for configuring, controlling and evaluating solar power inverter products; mobile apps being downloadable mobile applications for configuring, controlling and evaluating solar power inverter products; Downloadable and recorded communication software for electronic exchange of data, sound, videos, images and graphics via computer nets, mobile nets, wireless nets and telecommunication nets; chargers for drive batteries; downloadable and recorded computer software for configuring, controlling and evaluating welding and cutting apparatus; welding automation components, namely, electrical transformers for welding automation; downloadable and recorded simulation software and simulation apparatus and instruments for simulation and training of welding processes, sold as a unit; welding masks; welding helmets; downloadable and recorded computer software for configuration, control and evaluation of plasma surface treatment products | ACTIVE | — |
| 035 | Business advisory services relating to engergy issues, energy supply and energy efficiency; performance accounting; Invoicing services in the field of energy performance, namely, drawing up of pricing models for the invoicing of energy performance; price comparing services in relation to drawing up of price offers for the invoicing of energy performance; computerised file management; procurement of contracts with electricity providers for third parties; rental of vending machines; wholesale and retail electricity provider services that allow customers to purchase energy | ACTIVE | — |
| 037 | Installation, maintenance and repair of power generating apparatus and power generating installations; installation, maintenance and repair of photo voltaic apparatus, photo voltaic modules and photo voltaic installations; mains laying, namely, pipe laying services; fueling of hydrogen gas for vehicles; recharging of batteries and accumulators; charging of electric vehicles | ACTIVE | — |
| 039 | Energy supply by electricity distribution; energy delivery, namely, electricity distribution | ACTIVE | — |
| 040 | Rental of plasma surface treatment machines and plasma spraying machines; electricity generating, generation of electricity from solar energy, generation of electricity from wind energy, generation of hydroelectric power, generation of energy by power plants; energy generation services; rental of power generating apparatus | ACTIVE | — |
| 041 | Education, instructional and training services, namely, providing instruction and training in the field of welding; provision of training courses by way of simulation technology in the field of welding; online publication of manuals | ACTIVE | — |
| 042 | Design and development of computer software for inverters; design and development of computer software for use in connection with photovoltaics and solar energy; rental of energy consumption meters; technical consultancy in the field of solar energy distribution, welding automation and product development services for welding and cutting machines; design and development of computer software for configuring, controlling and evaluating solar inverter products and welding and cutting apparatus, and product development services; technical project planning in the nature of product development of welding apparatus and instruments; technical construction planning in the nature of planning of informational technology systems for others; advisory services for technology services in the field of power and energy supply; advisory services in the nature of technology planning and consulting related to energy efficiency in connection with solar energy and electricity; computer software development, computer software programming for others, computer software updating, software maintenance, in particular for the simulation and the training of welding processes; design and development of computer software for the control of plasma surface treatment machines and plasma spraying machines | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Nov 4, 2023 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Sep 20, 2022 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Aug 30, 2022 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Aug 30, 2022 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Jul 26, 2022 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Jul 20, 2022 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Jul 20, 2022 | ECDR | TEAS CHANGE OF DOMESTIC REPRESENTATIVES ADDRESS | — |
| Jul 20, 2022 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jul 20, 2022 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Apr 26, 2022 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Feb 14, 2022 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Feb 8, 2022 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Feb 8, 2022 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jan 19, 2022 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Jan 19, 2022 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Jan 19, 2022 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Jan 6, 2022 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jan 6, 2022 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Jan 6, 2022 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Jan 6, 2022 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Jan 6, 2022 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Dec 19, 2021 | OPNX | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB | — |
| Dec 3, 2021 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Dec 3, 2021 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Dec 3, 2021 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Dec 1, 2021 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Dec 1, 2021 | OPNR | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | — |
| Nov 1, 2021 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Jun 8, 2021 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jun 8, 2021 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jun 8, 2021 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| May 7, 2021 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| May 6, 2021 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| May 6, 2021 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Dec 6, 2020 | RFNT | REFUSAL PROCESSED BY IB | — |
| Nov 16, 2020 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Nov 16, 2020 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Oct 31, 2020 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Oct 30, 2020 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Sep 17, 2020 | RFWR | NON-FINAL ACTION (IB REFUSAL) WITHDRAWN FOR REVIEW | — |
| Aug 15, 2020 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Aug 14, 2020 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Aug 5, 2020 | RFWR | NON-FINAL ACTION (IB REFUSAL) WITHDRAWN FOR REVIEW | — |
| Jun 30, 2020 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Jun 27, 2020 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Jun 26, 2020 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jun 26, 2020 | DOCK | ASSIGNED TO EXAMINER | — |
| Jun 26, 2020 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Jun 25, 2020 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |