USPTO serial 79288601
Reviewed by CopyMark Law Group
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
| Class | Description | Status | First use |
|---|---|---|---|
| 009 | Apparatus and instruments for monitoring, measuring and checking (supervision); apparatus and instruments for condition monitoring; apparatus and instruments for monitoring fluid; apparatus and instruments for magnetic filtration; magnetic filters; smart magnetic filters; power flushing filters (magnetic); smart power flushing filters (magnetic); testing apparatus and instruments; water testing apparatus and instruments; water monitoring apparatus and instruments; apparatus and instruments for testing and monitoring water in central heating systems, cooling systems, boilers, heaters, radiators, pumps and pipes; apparatus and instruments for monitoring and testing central heating systems, cooling systems, boilers, heaters, radiators, pumps and pipes; apparatus and instruments for monitoring and testing the efficiency, performance and consumption of central heating systems, cooling systems, boilers, heaters, radiators, pumps and pipes; apparatus and instruments for monitoring and testing heating, ventilating, air conditioning or water supply apparatus, systems, devices and installations; apparatus and instruments for monitoring and testing the efficiency, performance and consumption of heating, ventilating, air conditioning or water supply apparatus, systems, devices and installations; checking, monitoring and controlling apparatus for heating, ventilating, air conditioning or water supply apparatus, systems, devices and installations; checking, monitoring and controlling apparatus for central heating systems, cooling systems, boilers, heaters, radiators, pumps and pipes; apparatus, equipment and instruments for measuring the efficiency, performance and consumption of heating apparatus, systems, devices and installations; parts and fittings for all of the aforesaid goods | SECTION 70 - CANCELLED | — |
| 011 | Apparatus and installations for heating and water supply; central heating apparatus and installations; smart filters being parts of household or industrial installations for heating, central heating, water storage, water supply and cooling; filters being parts of household or industrial installations for heating, central heating, water storage, water supply and cooling; smart magnetic filters being parts of household or industrial installations for heating, central heating, water storage, water supply and cooling; magnetic filters being parts of household or industrial installations for heating, central heating, water storage, water supply and cooling; smart non-magnetic filters being parts of household or industrial installations for heating, central heating, water storage, water supply and cooling; non-magnetic filters being parts of household or industrial installations for heating, central heating, water storage, water supply and cooling; smart power flushing filters being parts of household or industrial installations for heating, central heating, water storage, water supply and cooling; power flushing filters being parts of household or industrial installations for heating, central heating, water storage, water supply and cooling; smart filters being parts of central heating apparatus and installations; filters being parts of central heating apparatus and installations; smart magnetic filters being parts of central heating apparatus and installations; magnetic filters being parts of central heating apparatus and installations; smart non-magnetic filters being parts of central heating apparatus and installations; non-magnetic filters being parts of central heating apparatus and installations; smart power flushing filters being parts of central heating apparatus and installations; power flushing filters being parts of central heating apparatus and installations; smart filters being for use in central heating systems; filters being for use in central heating systems; smart magnetic filters being for use in central heating systems; magnetic filters being for use in central heating systems; smart non-magnetic filters being for use in central heating systems; non-magnetic filters being for use in central heating systems; smart power flushing filters being for use in central heating systems; power flushing filters being for use in central heating systems; water filtration apparatus and installations for heating, central heating, water storage, water supply and cooling; water filtration apparatus and installations for central heating apparatus and installations; water treatment apparatus for water purification and water softening; water treatment apparatus for water purification and water softening for domestic use; water treatment apparatus for water purification and water softening for central heating apparatus and installations; water treatment filters; portable filtration units (other than machines); temperature sensors (thermostatic valves) for heating apparatus; parts and fittings for all of the aforesaid goods | SECTION 70 - CANCELLED | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Dec 5, 2020 | DENA | NOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG MAILED | — |
| Dec 4, 2020 | DETH | DEATH OF INTERNATIONAL REGISTRATION | — |
| Aug 30, 2020 | RFNT | REFUSAL PROCESSED BY IB | — |
| Aug 12, 2020 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Aug 11, 2020 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Jul 29, 2020 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Jul 28, 2020 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jul 21, 2020 | DOCK | ASSIGNED TO EXAMINER | — |
| Jul 21, 2020 | DOCK | ASSIGNED TO EXAMINER | — |
| Jul 10, 2020 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Jul 6, 2020 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Jul 2, 2020 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |