USPTO serial 79289269
Reviewed by CopyMark Law Group
These status codes mean the trademark application is abandoned and no longer pending. Common reasons include missing an Office Action response (600), filing without a valid basis (602), express abandonment by the applicant (604), or failure to respond to an examiner's inquiry (618). Revival may be possible in limited circumstances. If abandonment was unintentional, consult counsel about a petition to revive. Otherwise file a new application if protection is still needed.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
| Class | Description | Status | First use |
|---|---|---|---|
| 007 | Machines and motors for operating power stations, parts and accessories for power stations in the form of generators, compressors, pumps, regulators, turbines, power generators and overheating devices and superchargers; direct current generators; direct current motors; heat exchangers [parts of machines]; dynamos; current generators; electrical pumps; regulators [parts of machines]; alternators; servomotors; alternating current servo motors; superheaters; transmissions for machines; electricity generators | ACTIVE | — |
| 009 | Apparatus and instruments for conducting, distributing, converting, storing, regulating and controlling electric current; smart thermostats; thermostats; solar panels; data processing equipment and accessories (electrical and mechanical); software; direct current converters; converters, electric; current convertors; dc/ac converters; power connectors; electrical rectifiers; connectors [electricity]; cable connectors; energy regulators; electric control devices for energy management; apparatus for monitoring electrical energy consumption; network controlling apparatus; grids for batteries; transistor sockets; electric sockets; electric power supply sockets; batteries; electric cables and wires; alternator rectifiers; electronic control systems for machines; galvanic batteries; direct current power supplies; power units [batteries]; electric power supply units; ac/dc power supplies; dc input power supplies; power banks; power cables; electricity conduits; cables, electric; electric current control devices; inverters [electricity]; electric apparatus for commutation; electronic surveillance apparatus; measuring devices, electric; battery chargers; switchboxes [electricity]; branch boxes [electricity]; power distributing boxes; junction boxes [electricity]; circuit closers; galvanometers; voltage stabilizers; transformers [electricity]; tap changers for electric transformers; safety relays [electric]; safety contact plugs; photovoltaic installations for generating electricity [photovoltaic power plants]; photovoltaic modules; photovoltaic inverters; diodes; usb cables; circuit breakers; conductors, electric; solar power generators | ACTIVE | — |
| 042 | Consultancy in the field of energy-saving; professional consultancy relating to energy efficiency in buildings; energy auditing; advisory services relating to the use of energy; advisory services relating to energy efficiency; professional consultancy relating to the conservation of energy; development of energy and power management systems; design and development of energy distribution networks; design of heating installations; programming of energy management software; design and development of energy management software | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Mar 26, 2022 | FINT | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Mar 9, 2022 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Mar 9, 2022 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Jan 1, 2022 | OPNX | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB | — |
| Dec 15, 2021 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Dec 15, 2021 | OPNR | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | — |
| Mar 9, 2021 | MAB2 | ABANDONMENT NOTICE MAILED - FAILURE TO RESPOND | The trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time. |
| Mar 9, 2021 | ABN2 | ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE | The trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time. |
| Sep 27, 2020 | RFNT | REFUSAL PROCESSED BY IB | — |
| Sep 5, 2020 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Aug 26, 2020 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Jul 22, 2020 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Jul 21, 2020 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jul 14, 2020 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Jul 10, 2020 | DOCK | ASSIGNED TO EXAMINER | — |
| Jul 10, 2020 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Jul 9, 2020 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |