USPTO serial 79289996
Reviewed by CopyMark Law Group
This registration is in, or will soon enter, a USPTO maintenance window. Missing a Section 8 or Section 9 filing can cancel the registration.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Plus Government fees of $1,625
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Lisa M. DuRoss
Lisa M. DuRoss HARNESS, DICKEY & PIERCE, PLC5445 Corporate Drive, Suite 200Troy, MI 48098UNITED STATES| Class | Description | Status | First use |
|---|---|---|---|
| 007 | Wind-powered electricity generators; machine parts, namely, towers for wind power in wind turbines; machine parts, namely, blades for wind turbines | ACTIVE | — |
| 019 | Non-metallic building materials, namely, modular non-metal components for wind power towers in the nature of framework for building, door panels, wall panels, water-resistant boards and panels for construction; non-metal laminates, namely, glue-laminated wood; laminates of non-metallic materials for use in building, namely, non-metal pilings, non-metal building panels, non-metal building frameworks, and nonmetal pillars for building; semi-worked wood for building; wood rafters; wooden floor tiles; wood siding; non-metal modular building units, namely, non-metal materials for constructing wind power towers in the nature of framework for building, door panels, wall panels, water-resistant boards and panels for construction; modular superstructures, not of metal, namely, modular non-metal structures for wind energy generation; wood panelling; pillars, not of metal, for building; agglomerated cork for building; multi-layered wood; shaped timber; non-metallic transportable buildings; monuments, not of metal; non-metallic rigid pipes; water-pipes, not of metal | ACTIVE | — |
| 037 | Construction services, namely construction of wind power towers, wind power plants, and modular buildings; building construction; construction of wind power plants; installation of wind power systems; maintenance and repair of wind power plants; building construction consultancy; providing construction information; services for the construction of buildings, namely, construction, mounting in the nature of installation and repair of wind turbines and component parts for wind power towers, wind power plants, and modular buildings; consultancy and information services relating to construction, namely, consulting services and providing information in the fields of construction; installation of high tensile structures; installation of fabricated construction units | ACTIVE | — |
| 040 | Custom manufacture of prefabricated construction elements; custom manufacturing and finishing of materials, namely, custom manufacture of and applying finishes to modular components for modular buildings, transportable buildings, modular components for wind power towers, glue-laminated wood, semi-worked wood for building, modular structures for wind power towers, and materials for constructing wind power towers | ACTIVE | — |
| 042 | Construction engineering services, namely, structural engineering design services; design services for high tensile structures; technical consultancy services relating to structural engineering; construction drafting; design and development of industrial products, namely, design and development of new technology for others and product design in the field of modular components for modular buildings, wind power towers, transportable buildings, modular components for wind power towers, glue-laminated wood, semi-worked wood for building, modular structures for wind power towers, and materials for constructing wind power towers; design and development of industrial products, namely, product design and development in the fields of wind power towers and wind power tower components; research and development of new goods, for others, in the field of wooden materials | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Mar 7, 2025 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Jul 11, 2022 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Jul 11, 2022 | ECDR | TEAS CHANGE OF DOMESTIC REPRESENTATIVES ADDRESS | — |
| Jul 11, 2022 | EWAF | TEAS WITHDRAWAL OF ATTORNEY RECEIVED-FIRM RETAINS | — |
| Jul 11, 2022 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jul 11, 2022 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| May 30, 2022 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| May 11, 2022 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| May 11, 2022 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Feb 23, 2022 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Nov 23, 2021 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Sep 7, 2021 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Sep 7, 2021 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Sep 5, 2021 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Aug 18, 2021 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Aug 18, 2021 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Aug 18, 2021 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Jul 30, 2021 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jul 2, 2021 | EXPI | EX PARTE APPEAL-INSTITUTED | — |
| Jul 2, 2021 | JURT | JURISDICTION RESTORED TO EXAMINING ATTORNEY | — |
| Jul 2, 2021 | EXAF | EXPARTE APPEAL RECEIVED AT TTAB | — |
| Jun 22, 2021 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jun 22, 2021 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jun 22, 2021 | ERFR | TEAS REQUEST FOR RECONSIDERATION RECEIVED | — |
| Jan 2, 2021 | GNFN | NOTIFICATION OF FINAL REFUSAL EMAILED | — |
| Jan 2, 2021 | GNFR | FINAL REFUSAL E-MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Jan 2, 2021 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Dec 3, 2020 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Dec 3, 2020 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Dec 3, 2020 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Oct 4, 2020 | RFNT | REFUSAL PROCESSED BY IB | — |
| Sep 13, 2020 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Sep 12, 2020 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Aug 1, 2020 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Jul 31, 2020 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jul 28, 2020 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Jul 24, 2020 | DOCK | ASSIGNED TO EXAMINER | — |
| Jul 24, 2020 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Jul 23, 2020 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |