USPTO serial 79290269
Reviewed by CopyMark Law Group
This registration is in, or will soon enter, a USPTO maintenance window. Missing a Section 8 or Section 9 filing can cancel the registration.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Plus Government fees of $2,275
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Anna King
Anna King Banner & Witcoff, Ltd.71 South Wacker Drive, Suite 3600Chicago, IL 60606UNITED STATES| Class | Description | Status | First use |
|---|---|---|---|
| 001 | Chemical additives, namely, inhibitors for refrigeration machines | ACTIVE | — |
| 004 | Industrial oils and lubricants | ACTIVE | — |
| 007 | Generators, namely, electric power generators, automatic standby electric generator sets, gas-operated power generators, diesel-operated power generators, emergency power generators, mobile electric power generators, current generators; electric generating units powered by internal combustion engines; electricity generators; dynamos; electric generators; refrigerant compressors and controls and structural parts therefor; condensing units being used in HVAC systems | ACTIVE | — |
| 009 | Thermostats, condenser; downloadable mobile applications for climate control, water filtration and purification, and air purification systems; computer-based building automation system for monitoring, controlling and reporting the use and status of lighting, energy consumption, security systems and heating, cooling and ventilation equipment comprising a computer cathode ray tube (CRT), downloadable computer operating programs, keyboard, printer, building zone area sensors and monitors, subcomputers in the nature of laptops, board level computers, and power controllers associated therewith; building automation computer hardware and downloadable software for integrating multiple building systems into one centralized platform; building integration and management downloadable software designed for large building applications or multiple buildings within portfolio; downloadable software for use in the management and analysis of power system requirements for energy management; power transfer switches for automatically switching between a primary power source and a back-up power source; electrical and electronic controls for controlling the charge in refrigeration systems; electrical storage batteries | ACTIVE | — |
| 011 | Apparatus and installations for heating and air conditioning and ventilation apparatus and instruments; water heaters; electrostatic air filters for air conditioning and for domestic use; refrigerating machines and installations; electric heaters for commercial use; immersion heaters; portable electric heaters; blast chillers for commercial food preparation and storage; refrigeration equipment, namely, food and beverage chilling units; installations for conditioning air; air handlers; humidifiers; dehumidifiers; energy and heat recovery ventilators; ventilating exhaust fans, all for cooling, heating and ventilating domestic commercial and industrial buildings and for use in industrial processes; diffusers for heating and air conditioning installations; air cleaning units; barometric condensers for condensing vapors by contact with liquids; cooling evaporators; external ballast and bilge water filtering and absorbing device for use in a local containment area for removing oil and other contaminants from the effluent; gas condensers, other than parts of machines; refrigerator condensers; coils as parts of distilling, heating or cooling installations; fans for air conditioning apparatus; electric fans; hot air blowers; furnaces; air conditioners; heat pumps; heat exchangers, not parts of machines, coils as parts of distilling installations; air purifying apparatus and machines; water filtration and purification units and replacement cartridges and filters thereof; water purification installations and structural parts for all of the aforesaid; boilers for heating installations, not for machines; burners, namely, combustion burners, other than perfume burners; fluid, air and water heaters and chillers being ail-cooled chillers and water-cooled chillers for all domestic, commercial and industrial use; air inductor apparatus being air conditioning units for air conditioning units consisting of filters, diffusers, blenders and convectors; ventilation being air-conditioning installations for terminals; HVAC unit variable air volume apparatus, namely, controllers, safety dampers, fans, motorized fluid mixing valves, mixing valves actuators; refrigerant condensers; evaporators being cooling evaporators for HVAC; fan coil apparatus being coils as parts of distilling, heating or cooling installations; fans and blowers, namely, fans for HVAC units; air conditioners, and heat exchangers for use in heat transfer for industrial and commercial uses; evaporating apparatus, namely, cooling evaporators and evaporators for HVAC; gas, oil and synthetic fuel burners for industrial and commercial use; interior environment climate control system consisting of air conditioning, heating, ventilation and drying control devices being humidifiers, with digital thermostats all sold as a unit; mechanical, pneumatics, electrical and electronic controllers for heating, cooling and ventilating equipment; electrostatic air filters | ACTIVE | — |
| 037 | Technical consulting related to the installation of power generating, heating, water heating, ventilating, air conditioning and refrigeration equipment, air purification, and water filtration and purification systems; rental of tools for the repair of heating and air conditioning equipment | ACTIVE | — |
| 042 | Engineering consultation services in the field of power generating, heating, water heating, ventilating, air conditioning, air purification, water filtration and purification, and refrigeration system requirements; design, development, and consulting services related thereto in the field of power generating, heating, water heating, ventilating, air conditioning and refrigeration equipment, air purification, and water filtration and purification systems, and refrigeration system requirements; technical consulting related to the design of power generating, heating, water heating, ventilating, air conditioning and refrigeration equipment, air purification, and water filtration and purification systems | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Jul 27, 2026 | REM3 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED | — |
| Jul 2, 2026 | ADCH | CHANGE OF NAME/ADDRESS REC'D FROM IB | — |
| Dec 26, 2021 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Dec 7, 2021 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Dec 7, 2021 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Oct 27, 2021 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Jul 27, 2021 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| May 11, 2021 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| May 11, 2021 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| May 11, 2021 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Apr 21, 2021 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Apr 21, 2021 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Apr 21, 2021 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Apr 2, 2021 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Mar 17, 2021 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Mar 17, 2021 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Mar 17, 2021 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Oct 18, 2020 | RFNT | REFUSAL PROCESSED BY IB | — |
| Oct 12, 2020 | CHAN | APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED | — |
| Oct 12, 2020 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Oct 12, 2020 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Oct 12, 2020 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Oct 12, 2020 | COAR | TEAS CHANGE OF OWNER ADDRESS RECEIVED | — |
| Sep 26, 2020 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Sep 26, 2020 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Sep 4, 2020 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Sep 3, 2020 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Sep 1, 2020 | DOCK | ASSIGNED TO EXAMINER | — |
| Aug 7, 2020 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Aug 3, 2020 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Aug 1, 2020 | LIMI | LIMITATION FROM ORIGINAL APPLICATION ENTERED | — |
| Jul 30, 2020 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Jul 23, 2020 | SDRC | SN ASSIGNED FOR SECT 66A SUBSEQ DESIG FROM IB | — |