Drawing for BLADT INDUSTRIES

USPTO serial 79290639

BLADT INDUSTRIES

Reviewed by CopyMark Law Group

Reg. 6324904Status 700Renewal
Filing date
Status date
Registration date
Apr 20, 2021
Examiner
FOSS, KATHERINE M
Law office
PUBLICATION AND ISSUE SECTION

What this means

This registration is in, or will soon enter, a USPTO maintenance window. Missing a Section 8 or Section 9 filing can cancel the registration.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with BLADT INDUSTRIES?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Get help with this Renewal, set up monitoring, or talk with CopyMark.
Get Attorney Assistance for just $1,046*

Plus Government fees of $1,300

Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Mark R Malek

Mark R Malek Widerman Malek, PL1990 West New Haven AvenueSuite 201Melbourne, FL 32904

Goods and services

ClassDescriptionStatusFirst use
006Structural steels; steel; steel tubes; steel fabrications being steel sheets, steel forgings, and steel cases; steel strip; steel masts; prefabricated steel buildings; steel building materials, namely, framework of metal for building, building boards of metal, metal sheets for tanks; ramps for vehicles being structures of metal; prefabricated bridges of metal; fabricated metal components for building foundations, namely, framework of metal for building; modular metallic structures in the nature of buildings; metal modular building units being modular metallic buildings; anchors; anchors of metal; ramps of metal for vehicles; masts of metal; buildings, transportable, of metal; metal building materials being framework of metal for building; metal tubes for industrial useACTIVE—
007Construction, oil and gas extraction equipment, namely, cranes, drilling rigs, drilling machines, and well drilling machines; material production and processing machines, namely, automatic slip sheet dispensing machines; modular tools for machines being tool bits for machines; milling and crushing machines for industrial purposes; oil drilling tools being drilling machines; suction pumps; suction machines for pumps for industrial purposes; suction valves for gas compressors; suction pumps for the extraction of gases; windmills; wind turbines; cylinders for mills; windmill pumpsACTIVE—
037Construction of bridges; custom construction of bridges; construction of foundations for bridges; installation of power plant equipment, namely, electrical and automation equipment; installation of industrial plant equipment, namely, electrical and automation equipment; beneath ground construction work relating to pipework being pipe laying services; construction of structures for the production of crude oil; erection of structural steel buildings; construction of foundations for civil engineering structures; industrial construction, namely, construction of offshore oil and gas facilities, steel structures, and utility buildings; offshore construction of offshore structures used for oil and gas exploration; infrastructure construction being trenching in the nature of subsurface excavation and trench construction for new utilities, and pipe layingACTIVE—
042Design services relating to civil engineering; technical consultancy services relating to civil engineering; engineering services for the design of structures; civil engineering; civil engineering consultancyACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Apr 20, 2026REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
Aug 15, 2021FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Jul 29, 2021FICSFINAL DISPOSITION NOTICE SENT TO IB—
Jul 28, 2021FIMPFINAL DISPOSITION PROCESSED—
Jul 20, 2021FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Apr 20, 2021R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Feb 2, 2021NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Feb 2, 2021PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jan 30, 2021GPNXNOTIFICATION PROCESSED BY IB—
Jan 13, 2021OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Jan 13, 2021OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Jan 13, 2021NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Jan 12, 2021DOCKASSIGNED TO EXAMINER—
Dec 28, 2020CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Dec 22, 2020XAECEXAMINER'S AMENDMENT ENTERED—
Dec 22, 2020GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Dec 22, 2020GNEAEXAMINERS AMENDMENT E-MAILED—
Dec 22, 2020CNEAEXAMINERS AMENDMENT -WRITTEN—
Dec 11, 2020TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Dec 11, 2020CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Dec 11, 2020TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Sep 22, 2020CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED—
Sep 22, 2020TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Sep 22, 2020ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Sep 22, 2020REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Sep 22, 2020COARTEAS CHANGE OF OWNER ADDRESS RECEIVED—
Aug 30, 2020RFNTREFUSAL PROCESSED BY IB—
Aug 12, 2020RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Aug 12, 2020RFRRREFUSAL PROCESSED BY MPU—
Aug 4, 2020MAFRAPPLICATION FILING RECEIPT MAILED—
Aug 1, 2020RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Jul 31, 2020CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 31, 2020DOCKASSIGNED TO EXAMINER—
Jul 31, 2020NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jul 30, 2020REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance