USPTO serial 79290675
Reviewed by CopyMark Law Group
This registration is in, or will soon enter, a USPTO maintenance window. Missing a Section 8 or Section 9 filing can cancel the registration.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Plus Government fees of $1,300
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Patrick J. Jennings
Patrick J. Jennings Pillsbury Winthrop Shaw Pittman, LLP1200 Seventeenth Street, NWWashington, DC 20036UNITED STATES| Class | Description | Status | First use |
|---|---|---|---|
| 006 | Pipes and tubes of metal; metal pipes for liquid and gas transfer; metal hoses for plumbing use; floor drains of metal; sewer pipes of metal; ducts of metal for ventilating installations; junctions of metal for pipes; pipe muffs of metal; collars of metal for fastening pipes; skelps; pipe spacers of metal; pipe extensions of metal; couplings of metal for tubing; pipes, tubes and industrial hoses, and fittings therefor, and valves not being parts of machines, all of metal | ACTIVE | — |
| 011 | Sanitary and bathroom installations, namely, toilets, sinks, bathtubs; sanitary installations, water supply and sanitation equipment, namely, steam rooms, mixer faucets for water pipes, ozone sanitizers for water; waste pipes being parts of sanitary installations; flexible pipes being parts of sink plumbing installations; flexible pipes being parts of shower plumbing installations; flexible pipes being parts of bath plumbing installations; flexible pipes being parts of radiant heating and cooling installations; flexible pipes being parts of underfloor heating and cooling installations; flexible pipes being parts of radiant linear heating and cooling installations; flexible pipes being parts of pavement heating and cooling installations; heating, ventilating, and air conditioning and purification equipment, namely, heating installations, ventilating exhaust fans, air conditioners, air purifiers; flues being parts of ventilation hoods | ACTIVE | — |
| 017 | Flexible pipes, tubes, hoses and fittings therefor, all non-metallic and valves of rubber or vulcanized fiber, and fittings for rigid pipes, all non-metallic; non-metallic couplings for pipes; non-metal hose fittings, namely, hose bandages; non-metallic pipe extensions; non-metal pipe couplings and joints; insulation jackets for industrial pipes; casings of rubber for tubes; pipe muffs, not of metal; plastics in the form of sheets, films, blocks, rods and tubes for use in manufacturing; fittings, not of metal, for rigid pipes; non-metallic couplings for flexible pipes; hose pipes made of rubber for use in buildings; rubber tubes and pipes; flexible hoses, not of metal; flexible plumbing pipes of plastic; air conditioner hoses made from rubber and plastic; flexible tubes for use not of metal; connecting hoses for vehicle radiators; low-density synthetic plastic flexible pipe with mechanical and flame resistance, thermal and acoustic insulation; insulated flexible pipes, not of metal | ACTIVE | — |
| 019 | Plastic pipes for plumbing purposes, namely, non-metal water pipes of plastic; plastic pipes, namely, rigid plastic pipes for water; rigid pipes, not of metal; non-metallic rigid pipes and valves for rigid water-pipes, not of metal or plastic | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| May 25, 2026 | REM3 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED | — |
| Nov 28, 2025 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Oct 11, 2021 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Sep 17, 2021 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Sep 17, 2021 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Aug 25, 2021 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| May 25, 2021 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Mar 15, 2021 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Mar 9, 2021 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Mar 9, 2021 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Feb 24, 2021 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Feb 24, 2021 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Feb 17, 2021 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Feb 1, 2021 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jan 29, 2021 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jan 29, 2021 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jan 29, 2021 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Oct 19, 2020 | RFNT | REFUSAL PROCESSED BY IB | — |
| Sep 29, 2020 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Sep 28, 2020 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Aug 29, 2020 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Aug 28, 2020 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Aug 25, 2020 | DOCK | ASSIGNED TO EXAMINER | — |
| Aug 4, 2020 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Jul 31, 2020 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Jul 30, 2020 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |