USPTO serial 79292255
Reviewed by CopyMark Law Group
This registration is in, or will soon enter, a USPTO maintenance window. Missing a Section 8 or Section 9 filing can cancel the registration.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Plus Government fees of $650
NOE-Schaltechnik Georg Meyer-Keller GmbH+ Co. KG
DE
Other trademarks owned by NOE-Schaltechnik Georg Meyer-Keller GmbH+ Co. KG
NOE-Schaltechnik Georg Meyer-Keller GmbH+ Co. KG
DE
Other trademarks owned by NOE-Schaltechnik Georg Meyer-Keller GmbH+ Co. KG
NOE-Schaltechnik Georg Meyer-Keller GmbH+ Co. KG
DE
Other trademarks owned by NOE-Schaltechnik Georg Meyer-Keller GmbH+ Co. KG
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Thomas J. Moore
Thomas J. Moore Bacon & Thomas, PLLC201 N. Union St., Suite 430Alexandria, VA 22314-2649UNITED STATES| Class | Description | Status | First use |
|---|---|---|---|
| 006 | Shuttering of metal being molds of metal for holding wet concrete for use as formwork in building construction and civil engineering; reinforcing materials of metal for building; prefabricated beams of metal and of steel for reinforcing walls and ceilings for use in building construction and civil engineering; metal manual formwork for walls and ceilings, being metal scaffolding for the stabilization and forming of concrete used in building construction and civil engineering; formwork accessories of metal, namely, clamps and clamping bridges; formliners primarily of metal and also containing concrete for the forming and structuring of concrete surfaces; formwork panels being building materials in the nature of composite panels composed primarily of metal; formwork beams of metal; building supports being construction elements made of metal; transportable metal scaffolding; formwork scaffolding of metal; forming and training scaffolding of metal; clamping strips of metal and clamping screws of metal for fixing and reinforcing concrete formwork and scaffolding used in building construction and civil engineering; clamping cones of metal being metal clamps and metal spacer brackets; small items of metal hardware, namely, non-electric wires of common metal; sheets of common metal, all aforementioned for fixing and reinforcing concrete formwork and scaffolding used in building construction and civil engineering | ACTIVE | — |
| 019 | Building materials not of metal, namely, concrete formwork being scaffolding and shuttering being molds not of metal for holding wet concrete, for use in building construction and civil engineering; prefabricated beams and parts, not of metal, for reinforcing walls and ceilings for use in building construction and civil engineering; concrete formliners, not of metal, for forming and structuring of concrete surfaces; non-metal manual formwork being non-metal scaffolding for walls and ceilings for the stabilization and forming of concrete used in building construction and civil engineering; formwork accessories, namely, non-metal clamps and non-metal clamping bridges; formwork panels being building materials in the nature of composite ceiling panels composed primarily of non-metal materials; formwork beams, not of metal; building supports, in the nature of construction elements made of non-metal materials, namely, supports; transportable non-metal scaffolding, formwork scaffolding, not of metal, forming and training scaffolding, not of metal | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Jul 13, 2026 | REM3 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED | — |
| May 13, 2022 | RNWL | INTERNATIONAL REGISTRATION RENEWED | — |
| Dec 5, 2021 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Nov 12, 2021 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Nov 12, 2021 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Oct 13, 2021 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Jul 30, 2021 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Jul 30, 2021 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jul 30, 2021 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Jul 13, 2021 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Apr 27, 2021 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Apr 27, 2021 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Apr 24, 2021 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Apr 7, 2021 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Apr 7, 2021 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Apr 7, 2021 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Apr 7, 2021 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Apr 7, 2021 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Apr 7, 2021 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Mar 19, 2021 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Mar 16, 2021 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Mar 16, 2021 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Mar 16, 2021 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Mar 16, 2021 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Feb 25, 2021 | GNFN | NOTIFICATION OF FINAL REFUSAL EMAILED | — |
| Feb 25, 2021 | GNFR | FINAL REFUSAL E-MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Feb 25, 2021 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Jan 28, 2021 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jan 28, 2021 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jan 28, 2021 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Dec 5, 2020 | RFNT | REFUSAL PROCESSED BY IB | — |
| Nov 13, 2020 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Nov 12, 2020 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Oct 25, 2020 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Oct 24, 2020 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Oct 20, 2020 | DOCK | ASSIGNED TO EXAMINER | — |
| Sep 1, 2020 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Aug 28, 2020 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Aug 27, 2020 | LIMI | LIMITATION FROM ORIGINAL APPLICATION ENTERED | — |
| Aug 20, 2020 | SDRC | SN ASSIGNED FOR SECT 66A SUBSEQ DESIG FROM IB | — |