USPTO serial 79292822
Reviewed by CopyMark Law Group
This registration is in, or will soon enter, a USPTO maintenance window. Missing a Section 8 or Section 9 filing can cancel the registration.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Plus Government fees of $325
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Claudia W. Stangle
Claudia W. Stangle Leydig, Voit & Mayer, Ltd.180 N. Stetson AveTwo Prudential Plaza Suite 4900Chicago, IL 60601| Class | Description | Status | First use |
|---|---|---|---|
| 009 | Electricity supply systems, namely, electrical power supplies other than electricity generators; electricity grids, namely, electrical distribution units; photovoltaic installations, including solar modules, namely, photovoltaic cells and modules and photovoltaic solar modules for production of electricity; electricity transformers, distribution transformers; current transformers, rectifiers, inverters, inverter units, namely power inverters, direct current-to-direct current electric converters, current converter stations; rotary current switch gears, namely, electric switches, direct current switch gears, namely, electric switches; condensers being capacitors, storage batteries, electrical energy diverters; stepping electric switches, on-load tap changers, namely, current rectifiers; switching equipment being switching apparatus for electricity, electric switchboxes, electricity control panels, and electrical terminal boxes; distribution boxes for electricity, electrical tap boxes, namely, electrical terminal boxes; sensors, in particular electric, electronic, electro-optic, fibre optic, acoustic, optical, photoelectric and piezoelectric sensors for installation control and engine control; Buchholz relays, namely, electric relays; computers, computer hardware, downloadable computer software for conducting, distributing, switching, transforming, accumulating, monitoring influencing or controlling electricity; interfaces for computers, communication interface units in the nature of electronic display interfaces, apparatus for transmission of communication; installations and equipment for conducting, distributing, switching, transforming, accumulating, influencing or controlling electricity namely, electrical conductors, electrical switchers, electrical on load tap-changers, electric tap-changers, electrical power distribution units, electric accumulators, electric control panels, and resistors for distributing or controlling electric current; downloadable computer software for conducting, distributing, switching, transforming, accumulating, influencing or controlling electricity; downloadable computer software for influencing, operating, controlling, monitoring and testing drives, motors and engines, wind power installations, wind farms, generators, technical, chemical and electric installations, equipment and apparatus, electricity supply systems, mains, solar modules, photovoltaic installations, transformers and converters; computer hardware, namely installations and equipment and downloadable computer software for influencing, activating, controlling, monitoring and testing electric installations, equipment and apparatus for high-voltage direct current transmission, converter stations, three-phase current switching stations, dc current switching stations, coils, capacitors, accumulators, apparatus for commutation, step switches, sensors, measuring equipment, control equipment, monitoring equipment; computer hardware, namely installations and equipment and downloadable computer software for influencing, operating, controlling, monitoring and testing installations, equipment and apparatus for earthing and discharging, and faraday arrays, voltage generators, electric and electronic filters; computer hardware, namely installations, equipment and downloadable computer software for guaranteeing and improving energy quality of public, private and industrial electricity supply systems and electricity networks; computer hardware, namely installations and equipment and downloadable computer software for reactive power compensation using coils and condensers, namely capacitors, and for uninterruptible electrical power supply; sensors and measuring devices for temperature, level, flow, speed, acceleration, mechanical voltage, shaping, bending, expansion, shearing, torsion, pressure, humidity, surface vibrations, sound, vibrations, electromagnetic radiation, light and microwaves; sensors and measuring devices for electric current, electric voltage , electric energy, electric power, electric impedance, power factor, phase shift, loss factor, partial discharge, the analysis of dissolved gases and the transformation ratio of electricity transformers; computer hardware and computer downloadable software for controlling industrial processes; oscilloscopes, electronic data loggers, arc suppression coils, namely, electric coils, electrodes; voltage generators, namely, pulse generators for testing electric current; electric/electronic filters, namely, low pass inductor filter used in high power electrical applications | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Aug 20, 2026 | ADCH | CHANGE OF NAME/ADDRESS REC'D FROM IB | — |
| Jul 23, 2026 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Jun 8, 2026 | REM3 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED | — |
| Jan 27, 2024 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Dec 10, 2021 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Oct 25, 2021 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Sep 28, 2021 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Sep 28, 2021 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Sep 8, 2021 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Jun 8, 2021 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Mar 23, 2021 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Mar 23, 2021 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Mar 22, 2021 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Mar 3, 2021 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Mar 3, 2021 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Mar 3, 2021 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Feb 12, 2021 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jan 23, 2021 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jan 22, 2021 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jan 22, 2021 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Oct 19, 2020 | RFNT | REFUSAL PROCESSED BY IB | — |
| Oct 1, 2020 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Oct 1, 2020 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Sep 11, 2020 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Sep 10, 2020 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Sep 8, 2020 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Sep 4, 2020 | DOCK | ASSIGNED TO EXAMINER | — |
| Sep 4, 2020 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Sep 3, 2020 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |