USPTO serial 79293269
Reviewed by CopyMark Law Group
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Mark Sommers
Mark Sommers Finnegan, Henderson, Farabow, Garrett & Dunner LLP901 New York Avenue NWWashington, DC 20001UNITED STATES| Class | Description | Status | First use |
|---|---|---|---|
| 037 | Shipbuilding; machinery installation in the field of aircraft and aerospace; repair and maintenance services of ships, propellers for ships or contrarotating propellers for ships; repair and maintenance of bridges; repair and maintenance of tunnel ventilation apparatus; repair and maintenance of storage tanks; repair and maintenance of hydraulic gates and steel stacks; repair and maintenance of mechanical parking systems; repair and maintenance of transport containers; repair and maintenance services of aero engines or engines for aircraft; repair and maintenance of computer hard ware for use in aerospace industry; repair and maintenance services of missiles; installation, repair and maintenance services of boilers; construction, installation, repair and maintenance of chemical plants or industrial plants; construction, installation, repair and maintenance services of thermal power generating plants, geothermal power generating plants, wind-power generating plants, hydroelectric power generating plants, diesel power generating plants, combined cycle power generating plants, power generating plants or nuclear power plants; construction, installation, repair and maintenance services of movable seat equipment for sports, cultural, amusement or commercial facilities; repair and maintenance of air blowers and power shift transmissions; repair and maintenance of printing machinery and food packaging machinery; installation, repair and maintenance services of air pollution prevention plants; [ installation, repair and maintenance of environmental control systems; ] installation, repair and maintenance of refrigeration apparatus; installation, repair and maintenance of air conditioning apparatus; repair and maintenance services of * metalworking * machine tools; repair and maintenance of industrial robots; repair and maintenance of turbochargers, tractors, tanks being weapons, armored cars, ambulances, fire trucks, refrigerated vehicles, bulldozers, road rollers, diggers, dump trucks or graders for earth moving machines; building construction supervision services and planning services for construction project; construction, reconstruction, and restoration of residential, retail store, hotel, commercial, industrial and institutional buildings; construction and maintenance services relating to civil engineering structures; construction management of civil and infrastructure construction projects; installation, repair and maintenance of consumer electric appliances; installation, repair and maintenance of moving sidewalks; installation, repair and maintenance of freezing machines and apparatus or heating apparatus; installation, repair and maintenance of lighting apparatus; installation, repair and maintenance of telephones; installation, repair and maintenance services of computer hardware; installation, repair and maintenance of office machines and apparatus; installation, repair and maintenance of film projectors or photographic apparatus; installation, repair and maintenance of electric wires or cables, radio receivers, television receivers, and electronic apparatus; installation, repair and maintenance of tire alarms or burglar alarms; installation, repair and maintenance of measuring or testing machines and instruments; installation, repair and maintenance of medical apparatus; installation, repair and maintenance of flight simulators, computer hardware for simulating a design of machines and installations or computer hardware for simulating virtual reality used with electronic games apparatus; [ installation, repair and maintenance of signalling apparatus; ] * installation of signalling apparatus; repair and maintenance of signal transmitters and receivers for train track detection; repair and maintenance of signal transmitting devices and receiving devices for train track detection; * installation, repair and maintenance of electric or electronic equipment in automobiles; repair and maintenance of building; repair and maintenance of telecommunication apparatus; vehicle maintenance and repair; vehicle polishing; vehicle lubrication; vehicle greasing; vehicle washing; vehicle cleaning; anti-rust treatment for vehicles; vehicle service stations for refueling and maintenance; reconstruction and equipment installation of ships, aircrafts, buses, trucks, automobiles, cars for agriculture, sounding rockets, transportation rockets, space vehicles, tanks as weapons, armored cars, ambulances, fire trucks, refrigerated vehicles, mobile cranes, bulldozers, road rollers, diggers, dump trucks, tractors or graders as earth moving machines; repair and maintenance of 3D printers; repair and maintenance of electronic telecommunication machines and apparatus; repair and maintenance of power distribution and control machines; maintenance of moving sidewalks by remote control apparatus; maintenance of operating condition of air conditioning, heating, plumbing and sanitation for buildings by remote control apparatus; maintenance of operating condition of building equipment by remote control apparatus; providing information on maintenance of operating condition of building equipment by remote control apparatus; maintenance of driving condition of vehicles by remote control apparatus; maintenance of condition of vehicle cargo and freight by remote control apparatus; maintenance of physical condition of vehicle occupant cockpits by remote control apparatus; maintenance of operating condition of factories and plants by remote control apparatus | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Oct 13, 2026 | LIME | LIMITATION FROM THE IB EXAMINED AND ENTERED | — |
| Oct 12, 2026 | COC. | CORRECTION UNDER SECTION 7 - PROCESSED | — |
| Oct 12, 2026 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Sep 17, 2026 | OPNX | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB | — |
| Sep 2, 2026 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Sep 2, 2026 | OPNR | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | — |
| Oct 6, 2025 | CORN | CORRECTION FROM THE IB EXAMINED, NO ACTION IS NEEDED | — |
| May 23, 2025 | LIMG | LIMITATION OF GOODS RECEIVED FROM IB | — |
| Apr 4, 2025 | CRCV | CORRECTION TRANSACTION RECEIVED FROM IB | — |
| Feb 20, 2023 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Jan 28, 2023 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Jan 28, 2023 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Jan 11, 2023 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Oct 11, 2022 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Oct 11, 2022 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jul 26, 2022 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Jul 26, 2022 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jul 25, 2022 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Jul 6, 2022 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Jul 6, 2022 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Jul 6, 2022 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Jun 17, 2022 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| May 11, 2022 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| May 11, 2022 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| May 11, 2022 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Nov 13, 2021 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Nov 13, 2021 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Nov 13, 2021 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Oct 8, 2021 | CORN | CORRECTION FROM THE IB EXAMINED, NO ACTION IS NEEDED | — |
| Sep 25, 2021 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Sep 24, 2021 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Sep 24, 2021 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Sep 19, 2021 | CRCV | CORRECTION TRANSACTION RECEIVED FROM IB | — |
| Jul 20, 2021 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jul 20, 2021 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jul 20, 2021 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| May 1, 2021 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Apr 30, 2021 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Apr 30, 2021 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Apr 15, 2021 | CHAN | APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED | — |
| Apr 15, 2021 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Apr 15, 2021 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Apr 15, 2021 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Apr 15, 2021 | COAR | TEAS CHANGE OF OWNER ADDRESS RECEIVED | — |
| Dec 6, 2020 | RFNT | REFUSAL PROCESSED BY IB | — |
| Nov 19, 2020 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Nov 19, 2020 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Nov 4, 2020 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Nov 3, 2020 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Sep 19, 2020 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Sep 15, 2020 | DOCK | ASSIGNED TO EXAMINER | — |
| Sep 15, 2020 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Sep 14, 2020 | LIMI | LIMITATION FROM ORIGINAL APPLICATION ENTERED | — |
| Sep 10, 2020 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |