USPTO serial 79294740
Reviewed by CopyMark Law Group
This registration is in, or will soon enter, a USPTO maintenance window. Missing a Section 8 or Section 9 filing can cancel the registration.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
SSTINVEST, LIMITED LIABILITY COMPANY
RU
Other trademarks owned by SSTINVEST, LIMITED LIABILITY COMPANY
SSTINVEST, LIMITED LIABILITY COMPANY
RU
Other trademarks owned by SSTINVEST, LIMITED LIABILITY COMPANY
SSTINVEST, LIMITED LIABILITY COMPANY
RU
Other trademarks owned by SSTINVEST, LIMITED LIABILITY COMPANY
| Class | Description | Status | First use |
|---|---|---|---|
| 006 | Storage reels of metal, not-mechanical, for flexible hoses; Chimney pots of metal; Prefabricated houses of metal; Memorial plates of metal; Chimney shafts of metal; Roof gutters of metal; Street gutters of metal; Fences of metal; Telephone booths of metal; Greenhouse frames of metal; Framework of metal for building; Cornices of metal; Manifolds of metal for pipelines; Casings of metal for oilwells; Pillars of metal for building; Chimney cowls of metal; Fittings of metal for windows; Brackets of metal for building; Buildings of metal; Buildings, transportable, of metal; Steel buildings; Roofing of metal; Roofing of metal, incorporating photovoltaic cells; Staircases of metal; Steel sheets; Reinforcing materials of metal for pipes; Reinforcing materials of metal for building; Masts of metal; Steel masts; Pipe muffs of metal; Monuments of bronze for tombs; Tombs of metal; Flashing of metal for building; roof flashing of metal; Metal fish plates in the nature of hardware for fastening rails; Anvils; Portable anvils; Beak-irons; House numbers of metal, non-luminous; Wall claddings of metal for building; Palings of metal; Windows of metal; Metal window shutters; Poles of metal for power lines; Props of metal for construction; Branching pipes of metal; Wainscotting of metal; Building panels of metal; Partitions of metal for building; Rocket launching platforms of metal; Transport pallets of metal; Platforms, prefabricated, of metal; Wall tiles of metal; Floor tiles of metal; Tiles of metal for building; Metal fastening anchor plates; Paving slabs of metal; Grave slabs of metal; Tile floorings of metal; Slabs of metal for building; Loading pallets of metal; Paving blocks of metal; Roof coverings of metal; Cladding of metal for building; Linings of metal for building; Door panels of metal; Floors of metal; Window sills of metal; Collars of metal for fastening pipes; Window frames of metal; Frames of metal for building; Junctions of metal for pipes; Spray nozzles of metal; Bindings of metal, namely, binding screws, binding bands, and binding strips; Tombstone of steel; Prefabricated and modular stables of metal; Stair treads of metal; Greenhouses of metal, transportable; Mobile boarding stairs of metal for passengers; Pipework of metal; Penstock pipes of metal; Water-pipes of metal; Gutter pipes of metal; Ducts of metal for ventilating and air-conditioning installations; Drain pipes of metal; Chimneys of metal; Pipes of metal; Ducts of metal, for central heating installations; Steel pipes; Pantiles of metal; Roofing tiles of metal | ACTIVE | — |
| 009 | [ Monitoring apparatus, namely, computer hardware and recorded software, sold as a unit, to monitor and control the functioning of other non-medical and non-gaming electronic devices; Identification threads for electric wires; Coaxial cables; Cables, electric; Wire connectors; Condensers; Contacts, electric; Distribution boxes for electrical power; Junction boxes; Materials for electricity mains, namely, electric wires and cables; Electrical terminal blocks; Junction sleeves for electric cables; Sheaths for electric cables; Identification sheaths for electric wires; Electrified fences; Electricity limiters; Switches, electric; Precision measuring apparatus, namely, laser level; Telephone wires; Wires, electric; Conductors, electric; Copper wire, insulated; Fuse wire; Electric sockets; Connections for electric lines; Couplings, electric; Resistances, Electric sensors for indicating loss of electricity; Electrical ducts ] | SECTION 7(e) - CANCELLED | — |
| 011 | Water heaters; Hot water bottles; Electric footwarmers in the nature of footmuffs; bed warmers; Pocket warmers, namely, electric pocket warmers and chemically-activated heating packets for warming hands; Warming pans for beds; Electrically heated carpets; Footmuffs, electrically heated; Heaters for baths, namely, immersion heaters; Heaters for heating irons, namely, heating elements specifically adapted for electric waffle irons; Immersion heaters; Socks, electrically heated; Heating apparatus for defrosting vehicle windows; Hot air bath fittings, namely, hot tub jets; Bath fittings, namely, faucets, water control valves, aerators, and shower faucet extensions; Sauna bath installations; Blankets, electric, not for medical purposes; Heating plates, namely, electric hot plates; Hot plates; Heaters, electric, for feeding bottles; Aquarium heaters; Heating cushions, electric, not for medical purposes; Cooking rings; Heating apparatus, electric, namely, electric space heaters, patio heaters, and radiant heaters for household use; Radiators, electric; laundry dryers, electric; hair dryers; malt roasters; tobacco roasters; steam generating installations; heating installations; heaters for vehicles; heating elements | ACTIVE | — |
| 037 | Drilling of deep oil or gas wells; drilling of wells; installation of utilities in construction sites; laying of cable; masonry; roofing services; painting, interior and exterior; underwater repair; plastering; repair of power lines; pump repair; upholstery repair; demolition of buildings; warehouse construction and repair; Vehicle service stations for refueling and maintenance; Sterilization of medical instruments; Car washing; washing of linen; pipeline construction and maintenance; Underwater construction; Factory construction; Hydraulic fracturing services; Services of electricians, namely, electrical contractor and review of and remedial recommendations for electrical systems; Heating equipment installation and repair; Installation and repair of air-conditioning apparatus; Fire alarm installation and repair; Freezing equipment installation and repair; [ Electric appliance installation and repair; ] Installation, maintenance and repair of computer hardware; Machinery installation, maintenance and repair; Office machines and equipment installation, maintenance and repair; Interference suppression services for electrical apparatus; Swimming-pool maintenance; Furniture maintenance; Chimney sweeping; Boiler cleaning and repair; Plumbing; Pier breakwater building | ACTIVE | — |
| 042 | Computer system analysis; chemical analysis; Energy auditing; Recovery of computer data; [ Business card design; Graphic design of promotional materials; Industrial design; Graphic arts design; ] Computer virus protection services; Engineering; installation of computer software; Meteorological information; [ Material testing; ] Textile testing; Geological research; Research in the field of environmental protection; [ Mechanical research; ] Research in the field of welding; Research in the field of building construction; Research in the field of telecommunications technology; Research in the field of physics; Chemical research; [ Research and development of new products for others; ] Scientific and technological research relating to patent mapping; Scientific and technological research in the field of natural disasters; Scientific research; Analysis for oilfield exploitation; Underwater exploration; Oil-well testing; [ Quality control for others; ] Vehicle roadworthiness testing; Updating of computer software; Monitoring of computer systems to detect breakdowns; Monitoring of computer systems for detecting unauthorized access or data breach; Monitoring of computer systems by remote access; Maintenance of computer software; [ Authenticating works of art; Design of interior decor; ] Providing search engines for the internet; Conversion of computer programs and data, other than physical conversion; Conducting technical project studies, namely, technical project planning and design engineering of lines for the processing of web products; Computer system design; Rental of web servers; Computer rental; Rental of computer software; Geological prospecting; Oil prospecting; Hosting computer sites, namely, hosting web sites for others; Development of computer platforms; Construction drafting; Computer software design; Software development in the framework of software publishing; Cloud seeding; Consultancy in the field of energy-saving, namely, energy auditing; Creating and designing website-based indexes of information for others using information technology; Information technology services, namely, creating and maintaining web sites for others; computer programming; Technical writing; Copying of computer programs; Packaging design; Off-site data backup; Computer technology consultancy; Telecommunications technology consultancy; Scientific laboratory services; Styling, namely, interior and special event styling services; Cartography services; Exploration services in the field of the oil, gas and mining industries; Electronic data storage; Surveying; [ Interior design; ] Oil-field surveys; Geological surveys; Server hosting | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Sep 3, 2023 | INNA | INVALIDATION REVIEWED - NO ACTION REQUIRED BY OFFICE | — |
| Aug 5, 2023 | INPR | PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Jan 10, 2023 | NURC | NOTICE OF UPDATED REGISTRATION CONFIRMATION EMAILED | — |
| Dec 5, 2022 | LIME | LIMITATION FROM THE IB EXAMINED AND ENTERED | — |
| Dec 5, 2022 | COC. | CORRECTION UNDER SECTION 7 - PROCESSED | — |
| Dec 5, 2022 | PLGL | ASSIGNED TO PARALEGAL | — |
| Jul 16, 2022 | LIMG | LIMITATION OF GOODS RECEIVED FROM IB | — |
| Jan 26, 2022 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Oct 26, 2021 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Aug 10, 2021 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Aug 10, 2021 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Aug 8, 2021 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Jul 21, 2021 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Jul 21, 2021 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Jul 21, 2021 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Jul 6, 2021 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Jul 2, 2021 | ALIE | ASSIGNED TO LIE | — |
| Jul 1, 2021 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jun 23, 2021 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jun 22, 2021 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jun 22, 2021 | ERFR | TEAS REQUEST FOR RECONSIDERATION RECEIVED | — |
| Apr 12, 2021 | RDX3 | NOTIFICATION FOR REQ FOR RECON DENIED NO APPEAL FILED | — |
| Apr 12, 2021 | RDX1 | ACTION FOR REQ FOR RECON DENIED NO APPEAL FILED E-MAILED | — |
| Apr 12, 2021 | RRDX | ACTION REQ FOR RECON DENIED NO APPEAL FILED COUNTED NOT MAILED | — |
| Apr 5, 2021 | ZZZX | PREVIOUS ALLOWANCE COUNT WITHDRAWN | — |
| Mar 23, 2021 | PBCR | WITHDRAWN FROM PUB - OG REVIEW QUERY | — |
| Mar 8, 2021 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Mar 5, 2021 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Mar 5, 2021 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Mar 5, 2021 | ERFR | TEAS REQUEST FOR RECONSIDERATION RECEIVED | — |
| Dec 22, 2020 | GNFN | NOTIFICATION OF FINAL REFUSAL EMAILED | — |
| Dec 22, 2020 | GNFR | FINAL REFUSAL E-MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Dec 22, 2020 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Nov 29, 2020 | RFNT | REFUSAL PROCESSED BY IB | — |
| Nov 25, 2020 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Nov 24, 2020 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Nov 24, 2020 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Nov 12, 2020 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Nov 12, 2020 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Oct 23, 2020 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Oct 22, 2020 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Oct 14, 2020 | DOCK | ASSIGNED TO EXAMINER | — |
| Oct 9, 2020 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Oct 5, 2020 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Oct 1, 2020 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |