USPTO serial 79295716
Reviewed by CopyMark Law Group
This registration is in, or will soon enter, a USPTO maintenance window. Missing a Section 8 or Section 9 filing can cancel the registration.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
| Class | Description | Status | First use |
|---|---|---|---|
| 009 | Electricity meters; gas meters; water meters; electronic data LCD display units and display screens; remote electronic readers connected to energy, gas, and water meters for tracking energy, gas, and water consumption; computer hardware and display monitors for displaying energy, gas and water consumption; apparatus and instruments for conveying, transforming, storing, regulating and controlling electricity; electrical switches; electric energy meters, and replacement parts therefor, namely, electric switches, relays, transformers, and switchboards; heat temperature meters not for medical use and replacement parts therefor, namely, temperature switches, electric relays, and transformers; pricing meters in the nature of parking meters, and replacement parts therefor, namely, electric switches, relays, and transformers; calibration devices for calibrating ultrasonic testers, optical emission spectrometers, and replacement parts therefor, namely, electric switches, relays, and transformers; computer hardware and computers for billing of energy and related services provided by energy supply companies; computer hardware wherein software applications for energy, gas, water and heat measurement and analytics can be installed; downloadable software applications for measuring, analyzing, and controlling energy consumption; downloadable software for data capture, transmission and analysis in energy supply networks, as well as for managing energy transmission to energy customers, and for analysis of data on energy and customers, the energy market and trade | ACTIVE | — |
| 042 | Technical consultancy in the field of energy measurement to improve energy efficiency; technical consultancy related to computer-aided engineering for others in the field of energy management; quality control for others in the field of energy measurement and management; scientific analysis and evaluation in the field of energy management in connection with energy consumption in buildings; technological development of computer systems comprising computer hardware and software to support a service program for the management of energy in an electrical distribution network; development, updating and maintenance of software in the field of management of energy and energy customers, determination of data on energy and on customers, the energy market and trade, energy reporting; development, updating and maintenance of software applications for installation on electricity meters | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Jul 27, 2026 | REM3 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED | — |
| May 2, 2025 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Nov 4, 2022 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Jun 10, 2022 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Dec 26, 2021 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Dec 6, 2021 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Dec 6, 2021 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Oct 27, 2021 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Aug 13, 2021 | ADCH | CHANGE OF NAME/ADDRESS REC'D FROM IB | — |
| Jul 27, 2021 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| May 11, 2021 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| May 11, 2021 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| May 11, 2021 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Apr 21, 2021 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Apr 21, 2021 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Apr 21, 2021 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Apr 8, 2021 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Apr 7, 2021 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Apr 7, 2021 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Apr 7, 2021 | ERFR | TEAS REQUEST FOR RECONSIDERATION RECEIVED | — |
| Dec 19, 2020 | GNFN | NOTIFICATION OF FINAL REFUSAL EMAILED | — |
| Dec 19, 2020 | GNFR | FINAL REFUSAL E-MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Dec 19, 2020 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Dec 3, 2020 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Dec 2, 2020 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Dec 2, 2020 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Nov 29, 2020 | RFNT | REFUSAL PROCESSED BY IB | — |
| Nov 12, 2020 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Nov 12, 2020 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Oct 22, 2020 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Oct 21, 2020 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Oct 20, 2020 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Oct 16, 2020 | DOCK | ASSIGNED TO EXAMINER | — |
| Oct 16, 2020 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Oct 15, 2020 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |