Drawing for PRETACT ECOSAFET

USPTO serial 79295781

PRETACT ECOSAFET

Reviewed by CopyMark Law Group

Reg. 6655645Status 700Registered
Filing date
Status date
Registration date
Mar 1, 2022
Examiner
SALES, HEATHER ALISON
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with PRETACT ECOSAFET?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
009Apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling electricity; electricity transformers; parts for transformers, namely electric coils and cables; electronic load indicating devices namely, electronic monitors and monitor modules for monitoring electric current; electrotechnical, electronic and ceramic component parts and assemblies consisting thereof, namely, electrical fuses, electrical power connectors, electrical contacts, electrical sensors, capacitors, monolithic ceramic capacitors; electric, gas-insulated and air-insulated switching installations, namely, electrical switches and cut-out switches; current and electric voltage transformers; high voltage arresters, namely, electrical surge arresters; apparatus for measuring, monitoring and analysing operating data from electric goods, namely, electricity meters, electricity sensors, computer hardware for analyzing data from electric goods; Downloadable data processing computer programs, namely, computer operated data processing programs; downloadable data processing computer programs and downloadable mobile applications for use in monitoring electrical currents and recording and managing data relating to power generation, transmission and distributionACTIVE
037Assembly in the nature of installation, maintenance and repair of installations, devices and apparatus in the field of energy distribution and energy storage in the nature of electrical systems, electric conductors, electric cables, electric wires, electric current switches, electric voltage transformers, voltage regulators for electric power, power controllers, electrical controlling devices, electric meters, circuit testers, circuit breakers, circuit closers, electricity transformers, parts for transformers, electronic monitors for monitoring electric current, ceramic fuses, electrical power connectors, electrical contacts, electrical sensors, electric, electrical switches, current and electric voltage transformers, high voltage arresters, electricity meters, electricity sensors, computer hardware for analyzing data from electric goodsACTIVE
042Technical planning, research and technical development of installations, devices and apparatus, namely, designing of building automation and building technology systems for others in the field of energy generation, energy storage and energy distribution; scientific and technological services and research and design related thereto, namely, scientific research, analysis, and testing in the field of energy generation, energy storage and energy distribution; computer hardware and software design and development, in particular relating to computer programs and software in the field of energy distribution and energy storage; platform as a service (PaaS) featuring a software platform for processing data for use in monitoring of energy distribution in the field of energy distribution and energy storage; computer software development for managing data bases; development of computer database software; development and maintenance of computer database software; providing web hosting platforms on the Internet for monitoring and controlling power transmission systems; electronic storage services for archiving databases; design of computer database software; installation and maintenance of database softwareACTIVE

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Nov 10, 2023TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED
Nov 10, 2023ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Nov 10, 2023REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED
Aug 22, 2022FINOFINAL DECISION TRANSACTION PROCESSED BY IB
Aug 3, 2022FICSFINAL DISPOSITION NOTICE SENT TO IB
Aug 3, 2022FIMPFINAL DISPOSITION PROCESSED
Jun 1, 2022FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
Mar 1, 2022R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jan 31, 2022TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED
Jan 31, 2022ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jan 31, 2022REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED
Dec 19, 2021GPNXNOTIFICATION PROCESSED BY IB
Dec 14, 2021NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
Dec 14, 2021PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Nov 24, 2021OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
Nov 24, 2021OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB
Nov 24, 2021NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
Nov 9, 2021CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER
Nov 8, 2021XAECEXAMINER'S AMENDMENT ENTERED
Nov 8, 2021GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED
Nov 8, 2021GNEAEXAMINERS AMENDMENT E-MAILED
Nov 8, 2021CNEAEXAMINERS AMENDMENT -WRITTEN
Oct 16, 2021TEMETEAS/EMAIL CORRESPONDENCE ENTERED
Oct 15, 2021CRFACORRESPONDENCE RECEIVED IN LAW OFFICE
Oct 15, 2021ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED
Oct 7, 2021GNFNNOTIFICATION OF FINAL REFUSAL EMAILED
Oct 7, 2021GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Oct 7, 2021CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Jul 1, 2021TEMETEAS/EMAIL CORRESPONDENCE ENTERED
Jun 30, 2021CRFACORRESPONDENCE RECEIVED IN LAW OFFICE
Jun 30, 2021TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jun 5, 2021NREPNEW REPRESENTATIVE AT IB RECEIVED
May 8, 2021ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB
Jan 30, 2021RFNTREFUSAL PROCESSED BY IB
Jan 12, 2021RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB
Jan 12, 2021RFRRREFUSAL PROCESSED BY MPU
Dec 24, 2020RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
Dec 23, 2020CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 23, 2020DOCKASSIGNED TO EXAMINER
Oct 23, 2020MAFRAPPLICATION FILING RECEIPT MAILED
Oct 19, 2020NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED
Oct 15, 2020REPRSN ASSIGNED FOR SECT 66A APPL FROM IB

Frequently asked questions

Related guidance