USPTO serial 79296072
Reviewed by CopyMark Law Group
This registration is in, or will soon enter, a USPTO maintenance window. Missing a Section 8 or Section 9 filing can cancel the registration.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
| Class | Description | Status | First use |
|---|---|---|---|
| 007 | Electricity generators; solar-power electricity generators; solar photovoltaic power electricity generators comprising a system using solar trackers comprised of motors, gears, and drives for orienting solar panel; portable electric power generators; emergency power generators; electric power generators for ships; mobile electric power generators | ACTIVE | — |
| 009 | Photovoltaic solar modules; solar cells; electric batteries; photovoltaic inverters; solar energy storage device, namely, solar batteries; inverters; solar power modules for production of electricity; photovoltaic solar modules for production of electricity; data processing apparatus; electrical power distribution units; electric transformers; energy storage apparatus comprised of batteries; battery packs; downloadable computer software for controlling energy storage apparatus; electric reactors; electrical controlling devices; apparatus and instruments for storing electric current; electricity transporting system apparatus, namely, electric wires and cables; current rectifiers; wafers for solar cells; downloadable computer software for controlling solar power generation system; solar collectors; apparatus for measuring solar cell efficiency and electric current, namely, electrical eddy current test equipment, electronic monitors and monitor modules for monitoring electric current and electrical signals, clamp meters for measuring electricity; current converters concerning solar energy; electric connector used in solar power generation; supports for solar power generation modules, namely, structural parts for photovoltaic solar modules for production of electricity; apparatus for inspecting solar power generating facilities, namely, optical inspection apparatus for solar power generating facilities and electro-optical instruments for use in inspection of solar power generating facilities; automatic solar tracking sensors; solar cell panels for the production of electricity; fuel cells; electrical storage batteries; inverter supports for solar power generation | ACTIVE | — |
| 037 | Installation, maintenance and repair of photovoltaic equipment for electricity generation; maintenance, servicing and repair of apparatus and installations for generating power; maintenance of electric power distribution apparatus, electrical controllers and electricity transformers; installation, maintenance and repair of power device; new regeneration energy factory construction; installation services for solar powered devices for others; installation, maintenance and repair of photovoltaic cells and modules; construction, erection, installation, repair, renovation, servicing, maintenance and dismantling of power plants; construction and repair of power generating plants; construction of power plants | ACTIVE | — |
| 040 | Electricity generation; generation of electricity from solar energy; electricity generating of solar power generation; technical consultancy in the field of production of solar energy; production of energy; rental of energy generating equipment; processing and transforming of energy, namely, generation of energy from solar power, solid waste and renewable resources; consultancy services relating to the generation of electrical energy; electricity generating; rental of photovoltaic power generation installations; production and processing of fuels and of other sources of energy; rental of power-generating equipment; consultancy in the field of energy generation | ACTIVE | — |
| 042 | Research and development in the field of renewable energy production; design and development of photovoltaic systems; research in the field of energy; technological consulting services in the field of alternative energy generation; research and development of power converters, inverters and chargers for use in renewable energy systems; research and development in the field of electricity control apparatus and instruments; research and development relating to electric power storage system; development of computer software for solar power generators; development of computer software for solar power generation; engineering and design planning of power plants; research and development of products in the field of electricity control apparatus and instruments; research and development of products relating to electric power storage system | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Aug 3, 2026 | REM3 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED | — |
| Oct 20, 2023 | ADCH | CHANGE OF NAME/ADDRESS REC'D FROM IB | — |
| Jan 29, 2022 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Dec 20, 2021 | XXSS | GENERIC MADRID TRANSACTION SENT TO IB | — |
| Dec 20, 2021 | XXCR | GENERIC MADRID TRANSACTION CREATED | — |
| Nov 3, 2021 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Aug 3, 2021 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| May 18, 2021 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| May 18, 2021 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| May 17, 2021 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Apr 28, 2021 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Apr 28, 2021 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Apr 28, 2021 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Apr 15, 2021 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Apr 14, 2021 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Apr 13, 2021 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Apr 13, 2021 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Feb 27, 2021 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Dec 7, 2020 | RFNT | REFUSAL PROCESSED BY IB | — |
| Nov 18, 2020 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Nov 17, 2020 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Oct 31, 2020 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Oct 28, 2020 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Oct 27, 2020 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Oct 27, 2020 | DOCK | ASSIGNED TO EXAMINER | — |
| Oct 27, 2020 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Oct 23, 2020 | LIMI | LIMITATION FROM ORIGINAL APPLICATION ENTERED | — |
| Oct 15, 2020 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |