USPTO serial 79296673
DECCO EXTRUSION
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- Jan 11, 2022
- Examiner
- AGREDA, SAMANTHA LEIGH
- Law office
- PUBLICATION AND ISSUE SECTION
What this means
This registration is in, or will soon enter, a USPTO maintenance window. Missing a Section 8 or Section 9 filing can cancel the registration.
Need help with DECCO EXTRUSION?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Get help with this Renewal, set up monitoring, or talk with CopyMark.
Get Attorney Assistance for just $1,097*
Plus Government fees of $975
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Jan Tamulewicz
Jan Tamulewicz Myers Wolin, LLC100 SOUTH JEFFERSON ROAD, SUITE 202WHIPPANY, NJ 07981-1009UNITED STATESGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 006 | Metal building materials, namely, metal profiles for arranging devices on and in walls, ceiling and other surfaces; metal construction materials, namely, metal profiles made of steel, iron, nickel, titanium and other metals and their alloys; metal fittings for metal pipes, metal sheets being sheet metal, metal gates, metal roof tiles, metal doors, non-electric metal cables, safes, metal furnace grates, non-electric metal cables, aluminum windows, metal panels and shapes in the nature of refractory shapes of metal, floor and wall panels of metal, metal ferrules for walking sticks, metal pipes for water systems, metal scaffolding, metal gutters and poles, metal rails, metal screws, metal railings | ACTIVE | — |
| 019 | Non-metal building materials, namely, PVC railings, PVC windows and doors casings, PVC windows and doors frames, PVC windows and doors sashes; asbestos priming ground, namely, asbestos cement; bricks, cement, cement slabs and non-metal utility poles, non-metal roof tiles and non-metal and bituminous covering being bituminous roof coatings, semi-worked wood for building purposes, usable wood being semi-worked wood, furniture boards being raw and coated chip boards for furniture, wooden and non-metal corner endings being drywall corner bead not of metal, wooden veneer, parquet flooring, gypsum for use as building materials, building stone, non-metal lining being non-metal refractory furnace linings; non-metal windows being plastic and wooden windows, non-metal panels and shapes in the nature of railings for construction purposes, window and door frames not of metal, and window and door sashes not of metal, non-metal doors, binding material for walls being drywall, non-metal ceiling panels, ceramic tiles and insulating materials, non-metal railings for construction purposes | ACTIVE | — |
| 020 | Equipment for non-metal windows and doors, namely, non-metal window fittings, door fittings not of metal; non-metal packaging, namely, industrial packaging containers of wood; non-metal containers, namely, packaging containers of plastic; non-metal pallets, exhibition stands being free-standing panel units for exhibitions | ACTIVE | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by DECCO S.A.
- Other trademarks owned by DECCO S.A.
- Other trademarks owned by DECCO S.A.
- Other trademarks in Class 006
- Other trademarks in Class 019
- Other trademarks in Class 020
- Similar marks named DECCO EXTRUSION
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Jul 18, 2022 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Jun 24, 2022 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Jun 24, 2022 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Apr 11, 2022 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Jan 11, 2022 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jan 7, 2022 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Dec 10, 2021 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Nov 8, 2021 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Oct 26, 2021 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Oct 26, 2021 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Oct 20, 2021 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Oct 20, 2021 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Oct 6, 2021 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Sep 23, 2021 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Sep 23, 2021 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Sep 23, 2021 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Sep 23, 2021 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Sep 23, 2021 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Sep 23, 2021 | GNFN | NOTIFICATION OF FINAL REFUSAL EMAILED | — |
| Sep 23, 2021 | GNFR | FINAL REFUSAL E-MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Sep 23, 2021 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Aug 7, 2021 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Aug 6, 2021 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Aug 6, 2021 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jul 29, 2021 | CHAN | APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED | — |
| Jul 29, 2021 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Jul 29, 2021 | ECDR | TEAS CHANGE OF DOMESTIC REPRESENTATIVES ADDRESS | — |
| Jul 29, 2021 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jul 29, 2021 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Jul 29, 2021 | COAR | TEAS CHANGE OF OWNER ADDRESS RECEIVED | — |
| Feb 28, 2021 | RFNT | REFUSAL PROCESSED BY IB | — |
| Feb 7, 2021 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Feb 7, 2021 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Jan 24, 2021 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Jan 23, 2021 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jan 15, 2021 | DOCK | ASSIGNED TO EXAMINER | — |
| Dec 8, 2020 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Dec 2, 2020 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Dec 1, 2020 | LIMI | LIMITATION FROM ORIGINAL APPLICATION ENTERED | — |
| Oct 22, 2020 | SDRC | SN ASSIGNED FOR SECT 66A SUBSEQ DESIG FROM IB | — |