USPTO serial 79296807
Reviewed by CopyMark Law Group
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
| Class | Description | Status | First use |
|---|---|---|---|
| 019 | Transportable buildings, not of metal; pontoons not of metal used to support decking and wharfs being floating docks not of metal; nonmetallic walkways, namely prefabricated non-metal footbridges; monuments not of metal; floating docks for mooring boats not of metal; prefabricated platforms, not of metal; asphalt; bitumen; tar; tarred felts for construction use; non-metal frames for doors and windows and beams not made of metal; reinforcing materials not of metal for building; roof coverings, not of metal; roofing not of metal; signaling panels in the nature of signs, nonluminous and non-mechanical, not of metal; non-luminous and non-mechanical road signs not of metal; posts, not of metal | ACTIVE | — |
| 037 | Construction, inspection in the course of construction, maintenance and repair of port equipment, namely, wharfs, river stopping points, namely residential private docks, landing platforms namely walkways and bridges and marinas; waste cleaning services being removal of waste; construction, inspection in the course of instruction, maintenance and repair of buildings in the field of purification installation; maintenance, repair and reconditioning of photovoltaic facilities and apparatus; installation of ground anchors; building construction supervision; providing information on construction; construction, upkeep and maintenance services for real estate properties, buildings, marinas, factories, ports, bridges and tunnels; demolition of buildings; scaffolding repair and erection; real estate construction and development of commercial, residential and hotel property; maintenance and repair of buildings and structures; services for assignments as main contractors, agents for main contractors and project owners, namely, supervision and management of construction work; supervision and management of construction works with a sustainable development and energy-saving approach; road paving; road maintenance and cleaning; installation, repair and maintenance services for viaducts, oil pipelines, dikes, locks, irrigation devices; earthworks services in the nature of building of embankments; dredging; drilling of wells and tunnels; earth works services in the nature of excavating for building construction; construction, cleaning, and maintenance services for car parks, railways and roads; construction and maintenance services for thermal, electric and wind power plants; construction, cleaning and maintenance services for utilities in the nature of heating, air-conditioning, electric and monitoring installations; construction of civil engineering structures; construction consultancy; asbestos removal | ACTIVE | — |
| 039 | Transport of persons and goods; transport information; freight forwarding services; travel organization; travel ticket reservation services; parking services, namely, parking of boats; Garage rental; rental of space for mooring boats; rental of car parks; rental of warehouses; logistics services relating to transport, namely, supply chain logistics relating to the storage, transportation and delivery of goods for others by air, rail, ship or truck; distribution of energy; distribution of water, steam, electricity; storage of waste; removal of waste in the nature of waste transportation services | ACTIVE | — |
| 040 | Waste treatment; sorting of waste and recyclable raw material; recycling of trash and waste; recycling of waste; water treatment; biological or mechanical decontamination of subsurface soil sites; purification of industrial waste water; treatment of waste in the form of waste disposal; on-site water purification services; air purification and regeneration; providing information on treatment of materials; recycling of metals; services for waste water treatment | ACTIVE | — |
| 042 | Engineering services in the field of port and marina construction; Engineering services in the field of water treatment, waste treatment and water and waste collection; Engineering services in the field of eco-responsible furniture and homes; architecture services and town planning services in the nature of urban planning services; urban planning featuring technical project studies in the nature of environmental engineering feasibility studies; research in the field of construction and urban planning; scientific research; technical research services in the field of port and marina construction; technical research services in the field of water treatment, waste treatment and water and waste collection; technical research services in the field of eco-responsible furniture and homes; interior decoration; construction drafting; industrial design; technical project studies, namely conducting scientific feasibility studies; engineering surveying work; engineering; industrial research in the field of construction of and installing equipment for port areas and marinas; industrial research in the field of water treatment, waste treatment and water and waste collection; industrial research in the field of eco-responsible furniture and homes; development of products for third parties; mechanical and physics research; testing of materials; quality control for others; geological surveys; geological prospecting; geological research services; technical consultancy on environmental protection; technical design of water treatment plants; weather forecasting services; design and development of photovoltaic systems; engineering design services in the nature of technical evaluations concerning design; technical diagnosis of real estate, namely evaluation and testing of real estate for the presence of hazardous material; quality auditing, namely, quality control of goods and services; drafting for construction and renovation of buildings; inspection of buildings for quality control purposes, namely, energy auditing, carbon dioxide emission measuring and analysis, water meter reading; development of technical engineering analysis methods for evaluating construction and renovation projects and operation and maintenance of constructed buildings to assure compliance with construction industry standards; technical consulting services in the fields of energy measurement to improve energy efficiency of construction and renovation projects, constructed or renovated buildings and existing buildings and real estate parks; technical consultation in the field of environmental science in connection with real estate constructions; technical consultation in the field of design of environmentally-conscious buildings; technical architectural consultancy concerning the quality of design of the home; conducting audits of buildings and real estate renovations for the presence of hazardous material; design and development of computer programs and databases regarding the evaluation of real estate parks; design, maintenance and updating of software in the field of auditing and evaluation of buildings; providing online non-downloadable software for evaluating the technical characteristics of buildings; software as a service (SaaS) featuring software for conducting audits and evaluations of buildings, port areas, marinas and coastlines; software as a service (SaaS) featuring software for conducting audits and evaluations of water treatment infrastructures, waste treatment infrastructures and water and waste collection | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Oct 10, 2022 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Sep 19, 2022 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Sep 19, 2022 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Sep 7, 2022 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Jun 7, 2022 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Jun 7, 2022 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Mar 26, 2022 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Mar 22, 2022 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Mar 22, 2022 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Mar 2, 2022 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Mar 2, 2022 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Mar 2, 2022 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Feb 18, 2022 | ADCH | CHANGE OF NAME/ADDRESS REC'D FROM IB | — |
| Feb 14, 2022 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jan 22, 2022 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jan 22, 2022 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jan 22, 2022 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jul 23, 2021 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jul 23, 2021 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jul 23, 2021 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jun 17, 2021 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jun 16, 2021 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jun 16, 2021 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Feb 25, 2021 | ATRV | ATTORNEY REVIEW COMPLETED | — |
| Feb 24, 2021 | CREV | CORRECTION FROM IB ENTERED - ATTORNEY REVIEW REQUIRED | — |
| Feb 13, 2021 | CRCV | CORRECTION TRANSACTION RECEIVED FROM IB | — |
| Jan 4, 2021 | RFNT | REFUSAL PROCESSED BY IB | — |
| Dec 17, 2020 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Dec 17, 2020 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Dec 9, 2020 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Dec 8, 2020 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Dec 1, 2020 | DOCK | ASSIGNED TO EXAMINER | — |
| Nov 3, 2020 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Oct 30, 2020 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Oct 29, 2020 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |