USPTO serial 79298854
Reviewed by CopyMark Law Group
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
| Class | Description | Status | First use |
|---|---|---|---|
| 017 | synthetic plastic as semi-finished products in the form of foils, single-layer or multi-layer, inflatable and/or translucent, as wall elements or roof elements for building of stadiums, theme parks, swimming halls, halls, zoological gardens and buildings; Foils of metal for building insulation, namely, foils and textile membranes for buildings and transportable buildings for realization of light effects with natural and artificial light and for opacity, namely, with pneumatic change of light transmittance | ACTIVE | — |
| 019 | Building materials and building elements, not of metal, namely in the form of technical and architectural membranes made of textile materials or plastic materials for buildings, transportable buildings, exhibition stands, frame constructions, surface structures and walls; roofs, not of metal, namely in the form of technical and architectural membranes made of textile materials or plastic materials; roofs, not of metal, namely roofing membranes as dome lights in the form of technical and architectural membranes made of textile materials or plastic materials; wall claddings, not of metal, for building; clutch linings, interior linings, not of metal, for building; wall linings, not of metal, for building; material for building constructions, not of metal, made of foils and textile membranes for realization of light effects with natural and artificial light | ACTIVE | — |
| 042 | Architectural consultation; services of a property developer, namely technical consultation regarding the drafting of building construction projects; research and development for others in the field of facade construction and roof construction in conjunction with foils and membranes; Research on building construction in the nature of development of utilization concepts for membrane constructions, namely for heat and energy recovery with membrane constructions; construction drafting, in particular construction design of frameworks made of steel and aluminium in conjunction with foils and membranes; technical consultation regarding research on frameworks for buildings, roof constructions specifically made of steel and aluminium in conjunction with foils and membranes; technical project studies, namely conducting scientific feasibility studies for buildings and roof construction | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Sep 4, 2022 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Aug 12, 2022 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Aug 12, 2022 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Jun 22, 2022 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Mar 22, 2022 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jan 22, 2022 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Jan 4, 2022 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Jan 4, 2022 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Dec 15, 2021 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Dec 15, 2021 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Dec 15, 2021 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Nov 24, 2021 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Oct 21, 2021 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Oct 20, 2021 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Oct 20, 2021 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| May 16, 2021 | RFNT | REFUSAL PROCESSED BY IB | — |
| Apr 20, 2021 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Apr 20, 2021 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Apr 10, 2021 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Apr 9, 2021 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Apr 8, 2021 | DOCK | ASSIGNED TO EXAMINER | — |
| Dec 4, 2020 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Nov 30, 2020 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Nov 26, 2020 | SDRC | SN ASSIGNED FOR SECT 66A SUBSEQ DESIG FROM IB | — |