USPTO serial 79299073
Reviewed by CopyMark Law Group
This registration is in, or will soon enter, a USPTO maintenance window. Missing a Section 8 or Section 9 filing can cancel the registration.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
| Class | Description | Status | First use |
|---|---|---|---|
| 009 | Electric charging stations for electric vehicles and electric railway vehicles; electric apparatus and instruments for process control, namely, data processing apparatus and digital signal processors for charging electric vehicles and railway vehicles; electric and electronic devices and components thereof for inductive power transmission, namely, electrical coils, charging plates being battery chargers, electrical inductors for electric and railway vehicles; frequency converters; alternating current converters, commutators, transformers, power rails in the nature of electric conductor rails, circuit breakers and power lines for the power supply of electric and railway vehicles, namely, electric cables and wires; accumulators; batteries; electrical condensers in the nature of capacitors; flywheel accumulators and current sensors for electric vehicles and railway rolling stock; apparatus and instruments for conducting, switching, converting and controlling electric current; downloadable computer software for use in the charging process of electric vehicles and electric railway vehicles | ACTIVE | — |
| 037 | Battery charging services for electric vehicles and railway vehicles; installation, maintenance and repair of charging stations for electric and railway vehicles; construction, maintenance and repair of vehicles or vehicle parts, in particular for electric vehicles and railway vehicles; construction, assembly, maintenance, permanent servicing, supervision of construction and assembly in the nature of construction supervision and repair of apparatus and electrical and electronic devices for roads, driveways, stopping points, buildings | ACTIVE | — |
| 042 | Scientific study and related research and development in the field of battery charging for electric vehicles; providing information and data in relation to scientific study and technological research and development in the field of engineering charging services for electrical vehicles and railway vehicles; technological consultancy in the field of battery charging services for electric vehicles and railway vehicles; technological research in the field of charging services for electric vehicles and railway vehicles; design, development and programming of computer software in the field of battery charging services for electric vehicles and railway vehicles | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Jun 8, 2026 | REM3 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED | — |
| Nov 1, 2024 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Dec 9, 2023 | CHLD | CHANGE OF OWNER RECEIVED FROM IB | — |
| Jul 30, 2022 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Mar 5, 2022 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Feb 26, 2022 | ADCH | CHANGE OF NAME/ADDRESS REC'D FROM IB | — |
| Oct 25, 2021 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Sep 28, 2021 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Sep 28, 2021 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Sep 8, 2021 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Sep 3, 2021 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Jun 8, 2021 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Apr 3, 2021 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Mar 23, 2021 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Mar 23, 2021 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Mar 22, 2021 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Mar 3, 2021 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Mar 3, 2021 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Mar 3, 2021 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Feb 16, 2021 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Feb 16, 2021 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Feb 16, 2021 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Feb 16, 2021 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Feb 16, 2021 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Feb 7, 2021 | RFNT | REFUSAL PROCESSED BY IB | — |
| Jan 26, 2021 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jan 25, 2021 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jan 25, 2021 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jan 16, 2021 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Jan 16, 2021 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Dec 29, 2020 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Dec 28, 2020 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Dec 27, 2020 | DOCK | ASSIGNED TO EXAMINER | — |
| Dec 8, 2020 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Dec 4, 2020 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Dec 3, 2020 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |