USPTO serial 79300781
Reviewed by CopyMark Law Group
These status codes mean the trademark application is abandoned and no longer pending. Common reasons include missing an Office Action response (600), filing without a valid basis (602), express abandonment by the applicant (604), or failure to respond to an examiner's inquiry (618). Revival may be possible in limited circumstances. If abandonment was unintentional, consult counsel about a petition to revive. Otherwise file a new application if protection is still needed.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
| Class | Description | Status | First use |
|---|---|---|---|
| 006 | Building and construction materials and elements of metal; bearings primarily made of metal for construction, namely, for application in bridges or other types of edifices; expansion joint structures primarily made of metal for construction, namely, for application in bridges or other types of edifices; structural parts and members of such bearings and expansion joint structures, primarily made of metal; materials of metal for building and construction; roadways of metal; expansion joints made of metal, in particular expansion joints for bridging road joints; steel structures for expansion joints on bridges, the aforesaid expansion joints being also components of rubberised mats and carpets | ACTIVE | — |
| 017 | Elastomer polymers; elastomer material for expansion joints; expansion joint fillers for bridges; mastic compositions for sealing and jointing; semi-finished products of plastic, in particular for use as sliding material, filling material, attenuation or sealing and for use in expansion joints; insulating, damping and barrier materials, in particular in the form of mats and carpets for use in expansion joints, the aforesaid goods made of latex, rubber and/or other elastomers | ACTIVE | — |
| 019 | Building and construction materials and elements, not of metal; bridges and bridge structural parts, not of metal; bearings for construction, namely, for application in bridges or other types of edifices, primarily made of non-metals; bridge bearings [construction materials] not of metal; bridge units, not of metal; expansion joint structures for construction, namely, for application in bridges or other types of edifices, primarily made of non-metals; structural parts and components of such bearings and expansion joint equipment, primarily not of metal; roadways, not of metal; expansion joints, not of metal; flexible mats and carpets made of rubber and/or other elastomers for connecting solid structural parts, in particular for connecting expansion joints of bridges; deck profiles, not of metal; road humps, not of metal for slowing traffic | ACTIVE | — |
| 037 | Construction; construction services; construction of carriageways; installation of expansion joints and bridge bearings; application of bridge expansion joints; building and architectural work restoration; renovation of buildings; carriageway restoration; expansion joint and bridge bearing restoration | ACTIVE | — |
| 042 | Services of construction engineers; technological services relating to construction of bridges, other edifices and other building structures; technical consultancy in the field of bridge technology; design of structural parts of bridges and other edifices | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Nov 20, 2022 | FINT | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Nov 3, 2022 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Nov 3, 2022 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Jun 12, 2022 | OPNX | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB | — |
| May 25, 2022 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| May 25, 2022 | OPNR | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | — |
| Nov 3, 2021 | MAB2 | ABANDONMENT NOTICE MAILED - FAILURE TO RESPOND | The trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time. |
| Nov 3, 2021 | ABN2 | ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE | The trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time. |
| Nov 2, 2021 | DOCK | ASSIGNED TO EXAMINER | — |
| May 3, 2021 | RFNT | REFUSAL PROCESSED BY IB | — |
| Apr 9, 2021 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Apr 9, 2021 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Apr 3, 2021 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Apr 2, 2021 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Mar 31, 2021 | DOCK | ASSIGNED TO EXAMINER | — |
| Jan 1, 2021 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Dec 28, 2020 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Dec 24, 2020 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |