Drawing for ORTEC

USPTO serial 79301092

ORTEC

Reviewed by CopyMark Law Group

Reg. 6541693Status 700Renewal
Filing date
Status date
Registration date
Nov 2, 2021
Examiner
HACK, ANDREA R
Law office
PUBLICATION AND ISSUE SECTION

What this means

This registration is in, or will soon enter, a USPTO maintenance window. Missing a Section 8 or Section 9 filing can cancel the registration.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with ORTEC?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Get help with this Renewal, set up monitoring, or talk with CopyMark.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
040Treatment of metals, namely, cutting, forming, polishing, milling, and coating of metals; boiler making; pipe work, namely, custom manufacture of steel pipes for industrial plants and industrial installations; custom manufacture of plastic and rubber products; treatment, transformation, management of all waste, namely, water treatment, waste treatment, waste transformation, waste purification, waste regeneration in the nature of waste treatment, recovery recycling being the treatment of waste materials by recycling, energy and biological recovery being the reclamation of usable materials from the waste created by industrial plants and heavy industry; rehabilitation in the nature of decontamination of waste created by industrial plants and heavy industry; elimination of waste produced by communities and public or private businesses via waste treatment; waste treatment services involving ordinary, special, solid, liquid, hazardous, non-hazardous and inert waste, garbage, industrial and household waste and degraded soils and decontamination of sites, including nuclear, chemical or organic decontamination; industrial effluent treatment; sewage treatment plants; waste treatment services, namely, garbage treatment and grease destruction, all the foregoing services for the fields of reclamation of reusable resources, industrial plants, heavy industry, and for industrial applicationsACTIVE
042Technical research in the industrial fields of nuclear energy, railway, aerospace, aeronautics, oil/gas, defense, chemical, pharmaceutical, automotive, heavy industry, and industrial construction; Industrial engineering services for others; Industrial engineering in the field of waste treatment and municipal landfills; Industrial engineering services for nuclear power plants including in the field of dismantling nuclear plants; engineering services relating to industrial piping activities, boiler making, mechanical maintenance and industrial waste management for industrial establishments; providing technological and scientific information about environmentally-conscious and green innovations for industrial applications; design of industrial automatic handling systems using non-metallic construction materials; scientific research of waste treatment and waste management and sustainable development for industrial applications; information services relating to scientific research; providing information of technical know-how, namely, providing technical engineering information related to technical industrial plant operations for industrial fields, namely, nuclear energy, railway, aerospace, aeronautics, oil/gas, defense, chemical, pharmaceutical, automotive, and heavy industry; surveying, and engineering for industrial applications; construction drafting for industrial applications; monitoring and inspection of industrial plants and installations for quality control purposes; engineering services relating to construction, maintenance and repair of all constructions, buildings, plants and premises for industrial, public or private use; engineering services for the construction of industrial plants and installation for industrial fields, namely, nuclear energy, railway, aerospace, aeronautics, oil/gas, defense, chemical, pharmaceutical, automotive, heavy industry, construction, government; development and design services, namely, architectural design and technical design services for industrial plant installations including for central heating, sanitation, welding, zinc plating, copper work, metal frameworks and industrial electricity plantsACTIVE

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Dec 3, 2025TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED
Dec 3, 2025ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Dec 3, 2025REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED
May 16, 2022FINOFINAL DECISION TRANSACTION PROCESSED BY IB
Apr 25, 2022FICSFINAL DISPOSITION NOTICE SENT TO IB
Apr 25, 2022FIMPFINAL DISPOSITION PROCESSED
Feb 2, 2022FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
Nov 2, 2021R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Aug 17, 2021NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
Aug 17, 2021PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Aug 15, 2021GPNXNOTIFICATION PROCESSED BY IB
Jul 28, 2021OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
Jul 28, 2021OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB
Jul 28, 2021NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
Jul 9, 2021CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER
Jul 9, 2021XAECEXAMINER'S AMENDMENT ENTERED
Jul 9, 2021GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED
Jul 9, 2021GNEAEXAMINERS AMENDMENT E-MAILED
Jul 9, 2021CNEAEXAMINERS AMENDMENT -WRITTEN
Jul 8, 2021GNFNNOTIFICATION OF FINAL REFUSAL EMAILED
Jul 8, 2021GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Jul 8, 2021CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Jul 6, 2021TEMETEAS/EMAIL CORRESPONDENCE ENTERED
Jul 6, 2021CRFACORRESPONDENCE RECEIVED IN LAW OFFICE
Jul 6, 2021TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Feb 14, 2021RFNTREFUSAL PROCESSED BY IB
Jan 26, 2021RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB
Jan 25, 2021RFRRREFUSAL PROCESSED BY MPU
Jan 6, 2021MAFRAPPLICATION FILING RECEIPT MAILED
Jan 5, 2021RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
Jan 4, 2021CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 3, 2021DOCKASSIGNED TO EXAMINER
Jan 2, 2021NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED
Dec 31, 2020REPRSN ASSIGNED FOR SECT 66A APPL FROM IB

Frequently asked questions

Related guidance