Drawing for HELIOREC

USPTO serial 79301257

HELIOREC

Reviewed by CopyMark Law Group

Reg. 6630825Status 700Registered
Filing date
Status date
Registration date
Feb 1, 2022
Examiner
BETTS, MARCYA
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with HELIOREC?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
007Machines, namely, solar-powered electricity generators; machine tools for forming, riveting, swaging, and flaring of metal and plastics; power-operated tools, namely, pullers and components therefor, nut splitters, extractors, separators, spanners and coil spring compressors; motors, other than for land vehicles; machine coupling and transmission components, except for land vehicles; machine tools and machinery in the field of energy, including equipment for power stations, namely, solar-powered electricity generators; block type thermal power stations for power generation; floating solar power stations being solar-powered electricity generators; block type thermal mobile power stations for power generationACTIVE
037Construction of solar energy based power plants; repair of solar energy based power plants; installation services of solar energy based power plants; construction of power plants; installation, maintenance and repair of power plants and power grids; providing information related to the repair or maintenance of power stations; installation, maintenance and repair of energy conversion apparatus and power plants; repair and maintenance of engines, voltage stabilizers, current generators, uninterruptible power supplies; repair and maintenance of power equipment; installation and maintenance of solar thermal installations; installation, maintenance and repair of solar collectors; installation, maintenance and repair of solar energy systems; installation, maintenance and repair of solar installations for generating power, solar collectors and photovoltaic modules; installation, maintenance and repair of solar installations for generating power; installation, maintenance and repair of boiler systems and solar energy systems; installation, maintenance and repair of inverters, batteries and electrical connection apparatus for solar energy systemsACTIVE
042Scientific and technological services, namely, research and design in the field of solar energy; industrial analysis and industrial research services in the field of solar energy; design and development of computer hardware and software; technical design and planning of power stations; technical design services relating to electricity plants; engineering and technical consulting in the field of power stations and industrial production engineering; development of maintenance strategy in the nature of maintenance assessment for the performance and reliability power stations and energy facilities; technical writing; technical consultancy related to power stations and energy facilities, namely, testing and evaluation of power station and energy facilities equipment to improve performance and efficiency of such equipment; design and development of software for control, regulation and monitoring of solar energy systems; scientific research and development services relating to solar cells and electricity generation; scientific and industrial research in the field of photovoltaics and solar collectors; technical development of structural elements, devices and systems for solar collectors and photovoltaic plantsACTIVE

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Sep 30, 2022CHLDCHANGE OF OWNER RECEIVED FROM IB
Aug 1, 2022FINOFINAL DECISION TRANSACTION PROCESSED BY IB
Jul 12, 2022FICSFINAL DISPOSITION NOTICE SENT TO IB
Jul 12, 2022FIMPFINAL DISPOSITION PROCESSED
May 1, 2022FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
Feb 1, 2022R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Nov 16, 2021NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
Nov 16, 2021PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Oct 27, 2021NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
Oct 12, 2021CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER
Oct 8, 2021XAECEXAMINER'S AMENDMENT ENTERED
Oct 8, 2021GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED
Oct 8, 2021GNEAEXAMINERS AMENDMENT E-MAILED
Oct 8, 2021CNEAEXAMINERS AMENDMENT -WRITTEN
Sep 8, 2021TEMETEAS/EMAIL CORRESPONDENCE ENTERED
Sep 8, 2021CRFACORRESPONDENCE RECEIVED IN LAW OFFICE
Sep 8, 2021TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Mar 29, 2021RFNTREFUSAL PROCESSED BY IB
Mar 9, 2021RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB
Mar 8, 2021RFRRREFUSAL PROCESSED BY MPU
Mar 5, 2021RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
Mar 4, 2021CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 25, 2021DOCKASSIGNED TO EXAMINER
Jan 8, 2021MAFRAPPLICATION FILING RECEIPT MAILED
Jan 4, 2021NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED
Dec 31, 2020REPRSN ASSIGNED FOR SECT 66A APPL FROM IB

Frequently asked questions

Related guidance