Drawing for KUMMLER+MATTER

USPTO serial 79302156

KUMMLER+MATTER

Reviewed by CopyMark Law Group

Reg. 6810771Status 700Registered
Filing date
Status date
Registration date
Aug 9, 2022
Examiner
SMITH, CYNTHIA RINALDI
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with KUMMLER+MATTER?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Jeffrey H. Handelsman

Jeffrey H. Handelsman Greenblum & Bernstein, P.L.C.1950 Roland Clarke PlaceReston, VA 20191-1411UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
006Building elements of metal for vehicle thoroughfares, namely, steel masts, poles of metal for power lines, metal pipes, metal castings, castings, foils, powder, and rolled, drawn or extruded semi-finished articles of copper or its alloys, copper wire, not insulated, castings, foils, powder, and rolled, drawn or extruded semi-finished articles of aluminum or its alloys, stainless steel pipes, metal railway crossovers, cable stretchers and cincture stretchers of metal, cable thimbles of metal, hose clamps of metal, cantilevered brackets of metal, reinforcing materials of metal for building, steel wire rope; building elements of metal for railway tracks, namely, steel masts, poles of metal for power lines, metal pipes, metal castings, castings, foils, powder, and rolled, drawn or extruded semi-finished articles of copper or its alloys, copper wire, not insulated, castings, foils, powder, and rolled, drawn or extruded semi-finished articles of aluminum or its alloys, stainless steel pipes, metal railway crossovers, cable stretchers and cincture stretchers of metal, cable thimbles of metal, hose clamps of metal, cantilevered brackets of metal, reinforcing materials of metal for building, steel wire rope; building elements of metal for trolleybus thoroughfares, namely, steel masts, poles of metal for power lines, metal pipes, metal castings, castings, foils, powder, and rolled, drawn or extruded semi-finished articles of copper or its alloys, copper wire, not insulated, castings, foils, powder, and rolled, drawn or extruded semi-finished articles of aluminum or its alloys, stainless steel pipes, metal railway crossovers, cable stretchers and cincture stretchers of metal, cable thimbles of metal, hose clamps of metal, cantilevered brackets of metal, reinforcing materials of metal for building, steel wire rope; building elements of metal for overhead, ground or underground electricity supply equipment for thoroughfares, namely, steel masts, poles of metal for power lines, metal pipes, metal castings, castings, foils, powder, and rolled, drawn or extruded semi-finished articles of copper or its alloys, copper wire, not insulated, castings, foils, powder, and rolled, drawn or extruded semi-finished articles of aluminum or its alloys, stainless steel pipes, metal railway crossovers, cable stretchers and cincture stretchers of metal, cable thimbles of metal, hose clamps of metal, cantilevered brackets of metal, reinforcing materials of metal for building, steel wire rope; non-luminous and non-mechanical signs of metal; non-luminous metal beacons, namely, pylons of metal for conductor lines and outdoor lightingACTIVE—
007Electric tools for constructing vehicle thoroughfares, namely, driving motors, other than for land vehicles, electric motors for machines, electric pumps; electric tools for constructing railway tracks, namely, driving motors, other than for land vehicles, electric motors for machines, electric pumps; electric tools for constructing trolley thoroughfares, namely, driving motors, other than for land vehicles, electric motors for machines, electric pumpsACTIVE—
008Hand-operated tools for constructing vehicle thoroughfares, namely, hand-operated tools for bending pipes, hand-operated crimp wrenches, tire irons, knee kickers being hand tools, metal wire stretchers being hand tools, crow bars, stretchers for wire and metal bands being hand tools, levers, clamps for use in holding workpieces, fullers being hand tools; hand-operated tools for constructing railway tracks, namely, hand-operated tools for bending pipes, hand-operated crimp wrenches, tire irons, knee kickers being hand tools, metal wire stretchers being hand tools, crow bars, stretchers for wire and metal bands being hand tools, levers, clamps for use in holding workpieces, fullers being hand tools; hand-operated tools for constructing trolleybus thoroughfares, namely, hand-operated tools for bending pipes, hand-operated crimp wrenches, tire irons, knee kickers being hand tools, metal wire stretchers being hand tools, crow bars, stretchers for wire and metal bands being hand tools, levers, clamps for use in holding workpieces, fullers being hand toolsACTIVE—
009Traffic lights for traffic regulation; traffic-light apparatus being signaling devices; electronic road guidance apparatus being GPS navigation devices; road traffic control apparatus, namely, luminous traffic signals; railway traffic safety apparatus, namely, luminous traffic signals; downloadable lighting control software for controlling traffic municipal traffic lights and signals; electrical conductors being conductor lines, fittings for overhead power lines being power line transmission machines and apparatus; electric cables and conductorsACTIVE—
011Outdoor lighting apparatus, namely, lighting installations; lighting for vehicle thoroughfares, railway tracks and trolleybus thoroughfares being LED luminaires; electric decorative lighting in the nature of electrically-illuminated lanternsACTIVE—
019Building elements not of metal for vehicle thoroughfares, namely, plastic boundary marking posts, crash barriers of plastic for roads, plastic road studs for marking out roads, plastic conduit for drainage; building elements not of metal for railway tracks, namely, non-metal railroad ties, non-metal posts; building elements not of metal for trolleybus thoroughfares, namely, plastic boundary marking posts, crash barriers of plastic for roads, plastic road studs for marking out roads, plastic conduit for drainage; building elements not of metal for overhead, ground or underground electricity supply equipment for thoroughfares, namely, non-metal poles for electric power lines; building elements not of metal for vehicle guidance or geolocation along thoroughfares, namely, non-metal guard rails; non-luminous and non-mechanical signs, not of metal; non-luminous non-metal beacons, namely, pylons not of metal for conductor lines and outdoor lightingACTIVE—
037Construction of railroads and overhead and underground utilities being power transmission lines; Installation of utilities in the nature of electrical systems, traffic management systems being traffic lights; road construction; laying cables; installation of lighting apparatusACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jul 9, 2026NREPNEW REPRESENTATIVE AT IB RECEIVED—
Dec 11, 2022FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Nov 18, 2022FICSFINAL DISPOSITION NOTICE SENT TO IB—
Nov 18, 2022FIMPFINAL DISPOSITION PROCESSED—
Nov 9, 2022FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Aug 9, 2022NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Aug 9, 2022R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jul 4, 2022OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Jun 15, 2022OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Jun 15, 2022OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
May 30, 2022GPNXNOTIFICATION PROCESSED BY IB—
May 24, 2022NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
May 24, 2022PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
May 4, 2022OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
May 4, 2022OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
May 4, 2022NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Apr 19, 2022CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Apr 19, 2022XAECEXAMINER'S AMENDMENT ENTERED—
Apr 19, 2022GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Apr 19, 2022GNEAEXAMINERS AMENDMENT E-MAILED—
Apr 19, 2022CNEAEXAMINERS AMENDMENT -WRITTEN—
Mar 16, 2022TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Mar 15, 2022CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Mar 15, 2022ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
Oct 20, 2021GNFNNOTIFICATION OF FINAL REFUSAL EMAILED—
Oct 20, 2021GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Oct 20, 2021CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Aug 20, 2021TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Aug 19, 2021CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Aug 19, 2021TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Aug 19, 2021CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED—
Aug 19, 2021TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Aug 19, 2021ECDRTEAS CHANGE OF DOMESTIC REPRESENTATIVES ADDRESS—
Aug 19, 2021ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Aug 19, 2021REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Aug 19, 2021COARTEAS CHANGE OF OWNER ADDRESS RECEIVED—
Apr 30, 2021NREPNEW REPRESENTATIVE AT IB RECEIVED—
Mar 15, 2021RFNTREFUSAL PROCESSED BY IB—
Feb 23, 2021RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Feb 23, 2021RFRRREFUSAL PROCESSED BY MPU—
Feb 9, 2021RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Feb 8, 2021CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 2, 2021DOCKASSIGNED TO EXAMINER—
Jan 19, 2021MAFRAPPLICATION FILING RECEIPT MAILED—
Jan 15, 2021NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jan 14, 2021REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance