Drawing for TEPE BETOPAN

USPTO serial 79303691

TEPE BETOPAN

Reviewed by CopyMark Law Group

Reg. 6641529Status 700Registered
Filing date
Status date
Registration date
Feb 15, 2022
Examiner
CIANCI, RYAN MICHAEL
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with TEPE BETOPAN?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Dwana S. Dixon

Dwana S. Dixon Epstein Drangel LLP60 E. 42nd St., Suite 2520New York, NY 10165UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
019Sand, gravel, crushed stone for building, asphalt, bitumen, cement, gypsum as a building material for use in construction, road construction, repair and covering work; building materials as finished products, namely, concrete, gypsum, clay slabs, potters' clay, natural and artificial stone, wood boards, and plastics boards for building, construction, road construction purposes; transportable non-metallic buildings for use on the moon; poles not of metal for power lines; barriers not of metal for pedestrian traffic control on space stations; doors and windows of wood and non-metal synthetic materials for use in lunar colonies; traffic signs not of metal, non-luminous and non-mechanical, for road; monuments and statuettes of stone, concrete and marble; natural and synthetic surface coatings in the form of concrete panels and sheets, being building materials; bitumen-based cardboard sealants for roofing; bitumen-based sealants for roofing; building glass; prefabricated swimming pools not of metal; aquarium sandACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jun 19, 2025RNWLINTERNATIONAL REGISTRATION RENEWED—
May 15, 2022FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Feb 15, 2022R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Dec 12, 2021GPNXNOTIFICATION PROCESSED BY IB—
Nov 30, 2021NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Nov 30, 2021PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Nov 22, 2021OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Nov 17, 2021OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Nov 10, 2021NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Oct 22, 2021CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Oct 22, 2021XAECEXAMINER'S AMENDMENT ENTERED—
Oct 22, 2021GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Oct 22, 2021GNEAEXAMINERS AMENDMENT E-MAILED—
Oct 22, 2021CNEAEXAMINERS AMENDMENT -WRITTEN—
Aug 30, 2021DMCCDATA MODIFICATION COMPLETED—
Aug 30, 2021ALIEASSIGNED TO LIE—
Aug 27, 2021TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Aug 27, 2021CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Aug 27, 2021TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Aug 14, 2021RFNTREFUSAL PROCESSED BY IB—
Jul 23, 2021RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Jul 23, 2021RFRRREFUSAL PROCESSED BY MPU—
Jul 13, 2021RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Jul 12, 2021CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 9, 2021DOCKASSIGNED TO EXAMINER—
Feb 18, 2021MAFRAPPLICATION FILING RECEIPT MAILED—
Feb 14, 2021NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Feb 11, 2021LIMILIMITATION FROM ORIGINAL APPLICATION ENTERED—
Feb 4, 2021SDRCSN ASSIGNED FOR SECT 66A SUBSEQ DESIG FROM IB—

Frequently asked questions

Related guidance