Drawing for CORE ENERGY RECOVERY SOLUTIONS

USPTO serial 79304045

CORE ENERGY RECOVERY SOLUTIONS

Reviewed by CopyMark Law Group

Filing date
Status date
Registration date
—
Examiner
PARKS, KIMBERLY L
Law office
TTAB

What this means

These status codes mean the trademark application is abandoned and no longer pending. Common reasons include missing an Office Action response (600), filing without a valid basis (602), express abandonment by the applicant (604), or failure to respond to an examiner's inquiry (618). Revival may be possible in limited circumstances. If abandonment was unintentional, consult counsel about a petition to revive. Otherwise file a new application if protection is still needed.

Status 604: These status codes mean the trademark application is abandoned and no longer pending. Common reasons include missing an Office Action response (600), filing without a valid basis (602), express abandonment by the applicant (604), or failure to respond to an examiner's inquiry (618). Revival may be possible in limited circumstances.

Need help with CORE ENERGY RECOVERY SOLUTIONS?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

MAXWELL MINCH

MAXWELL MINCH MAXWELL L MINCH ESQ. PA11925 SW 1ST LANEGAINESVILLE, FL 32607UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
011Equipment and installations for heating, ventilating and steam generating, namely, control units for heating, cooling, ventilating, filters, silencers for heating, cooling, ventilating, tubes for heating, cooling, ventilating, grilles, air supply valves; air-conditioning installations and apparatus; heat accumulators; air filtering installations; air filters for ventilation, air conditioning and air treatment apparatus; filters for air conditioning apparatus; air humidifying apparatus; dehumidifiers; electric air driers; air-conditioning apparatus and installations; air-conditioning apparatus, air purifying apparatus, and heat recovery apparatus for heating, cooling, ventilating; heating and cooling radiators; convectors, namely, electric radiant heaters, electrical convector heating units; convectors for heating and cooling; flat radiators; heating panels used for indoor heating purposes, namely, ceiling heating panels; electric towel driers; heat generating installations consisting of solar collectors; heat exchangers other than parts of machines; exhaust gas, air, hot water and systems exchangers, namely, air exchangers for cleaning and purifying air; heat exchangers for chemical processing; heat regenerators; enthalpy exchangers, namely, heat and moisture exchangers; heat accumulators, in particular, domestic hot water cylinders; hot water boilers for heating, cooling, ventilating; electric heating equipment and installations, namely, electric radiators for heating building fans, in particular, gas-powered ventilating exhaust fans; sound dampers sold as integral components of air conditioning and heating systems and ventilation ducts; structural parts and components of the aforesaid goodsABANDONED—
037Repair of home automation apparatus and installations; installation of home automation apparatus and installations; installation, assembly, maintenance, remote maintenance, cleaning and repair of electric apparatus, heaters, air conditioning installations, ventilation installations, refrigeration apparatus, heat pumps, electricity generating installations and equipment for producing hot water and parts, components and accessories thereofABANDONED—
042Consultancy and technical planning in the field of industrial analysis and industrial research services for heating, ventilation and air conditioning equipment; drafting of construction plans; technical research, in particular relating to heating, ventilation and air conditioning apparatus; engineering services; design and maintenance of computer programs; industrial analysis and industrial research services in connection with heating, ventilation and air conditioningABANDONED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Aug 31, 2024FINTFINAL DECISION TRANSACTION PROCESSED BY IB—
Aug 12, 2024FICSFINAL DISPOSITION NOTICE SENT TO IB—
Aug 10, 2024FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Aug 9, 2023MAB4ABANDONMENT NOTICE E-MAILED - INTER PARTES DECISION—
Aug 9, 2023ABN4ABANDONMENT - AFTER INTER PARTES DECISION—
Aug 9, 2023OP.TOPPOSITION TERMINATED NO. 999999—
Aug 9, 2023OP.SOPPOSITION SUSTAINED NO. 999999—
Jun 6, 2023RFNTREFUSAL PROCESSED BY IB—
May 11, 2023OP.IOPPOSITION INSTITUTED NO. 999999—
May 8, 2023OPNSOPPOSITION NOTICE (IB REFUSAL) SENT TO IB—
May 6, 2023OPNCOPPOSITION NOTICE (IB REFUSAL) CREATED—
Dec 6, 2022ETOFEXTENSION OF TIME TO OPPOSE RECEIVED—
Nov 8, 2022NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Nov 8, 2022PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Nov 7, 2022GPNXNOTIFICATION PROCESSED BY IB—
Oct 19, 2022OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Oct 19, 2022OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Oct 19, 2022NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Oct 1, 2022CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Oct 1, 2022XAECEXAMINER'S AMENDMENT ENTERED—
Oct 1, 2022GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Oct 1, 2022GNEAEXAMINERS AMENDMENT E-MAILED—
Oct 1, 2022CNEAEXAMINERS AMENDMENT -WRITTEN—
Aug 1, 2022OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Jul 13, 2022OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Jul 13, 2022OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Mar 14, 2022GNS1NOTIFICATION OF SUBSEQUENT FINAL EMAILED—
Mar 14, 2022GNCFCONTINUATION OF FINAL REFUSAL E-MAILED—
Mar 14, 2022CNCFACTION CONTINUING A FINAL - COMPLETED—
Mar 2, 2022TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Mar 2, 2022CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Mar 2, 2022ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
Sep 22, 2021GNFNNOTIFICATION OF FINAL REFUSAL EMAILED—
Sep 22, 2021GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Sep 22, 2021CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Aug 17, 2021TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Aug 17, 2021CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Aug 17, 2021TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
May 3, 2021RFNTREFUSAL PROCESSED BY IB—
Apr 12, 2021RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Apr 12, 2021RFRRREFUSAL PROCESSED BY MPU—
Apr 7, 2021RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Apr 6, 2021CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 21, 2021DOCKASSIGNED TO EXAMINER—
Feb 17, 2021MAFRAPPLICATION FILING RECEIPT MAILED—
Feb 13, 2021NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Feb 11, 2021REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance