USPTO serial 79308592
Reviewed by CopyMark Law Group
This registration is in, or will soon enter, a USPTO maintenance window. Missing a Section 8 or Section 9 filing can cancel the registration.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Plus Government fees of $975
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Marie Anne Mastrovito
Marie Anne Mastrovito Womble Bond Dickinson (US) LLP950 3rd Avenue, Suite 2400New York, NY 10022UNITED STATES| Class | Description | Status | First use |
|---|---|---|---|
| 009 | Electric signaling, measuring, counting, recording, monitoring, controlling, regulating and switching devices for use in railway systems, namely, electronic sensors for use in track vacancy detection and axle counting, electrical relays for transmitting data relating to track vacancy, electrical signal attenuators; electric apparatus for the input, processing, transmission, storage and output of data, namely, computer hardware and downloadable computer software for processing, transmitting, storage and output of data relating to track vacancy, computer hardware and downloadable computer software for managing railway systems; electronic instruments and data logging apparatus and controller, namely, electronic location and speed sensors, electronic data logging apparatus for logging data relating to track vacancy in railway systems; electrical warning light systems, electrical warning horns and electronic warning flags; electrical signal centers in the nature of receivers of electronic signals; alarm and alert monitoring systems; emergency signal transmitters and receivers; remote controls for signal processors; downloadable data-processing computer programs; data processing equipment and computers and computer peripheral devices therefor; the aforesaid goods being for data communications via cable and wireless telecommunications networks, for remote data transmission and for data transmission on local networks | ACTIVE | — |
| 037 | Assembly, maintenance and repair of installations, devices and apparatus, in particular in the field of operating systems and traffic control systems | ACTIVE | — |
| 042 | Engineering services, namely, technical project planning, research and technical development of equipment, facilities and apparatus, in particular in the field of railway traffic operating systems and traffic control systems; technological consultancy and technical expertise relating to the development and design of computer hardware for operating railway control systems, technical consultancy relating to the design of electronic sensors and electronic railway signals for railway track vacancy detection systems and railway traffic control and monitoring systems; development and rental of computer programs for data processing and process technology; engineering services, namely, technical project management in the field of operating systems and traffic control systems; design and development of computer hardware and software; conducting engineering technical project studies; technical computer project management in the field of electronic data processing; electronic data processing computer programming; maintenance and installation of software | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Apr 9, 2026 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Nov 10, 2025 | ADCH | CHANGE OF NAME/ADDRESS REC'D FROM IB | — |
| Sep 12, 2022 | RNWL | INTERNATIONAL REGISTRATION RENEWED | — |
| Jul 22, 2022 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Jul 22, 2022 | ECDR | TEAS CHANGE OF DOMESTIC REPRESENTATIVES ADDRESS | — |
| Jul 22, 2022 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jul 22, 2022 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Jun 21, 2022 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| May 25, 2022 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| May 25, 2022 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Mar 7, 2022 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Dec 7, 2021 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Sep 21, 2021 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Sep 21, 2021 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Sep 1, 2021 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Aug 19, 2021 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Aug 17, 2021 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Aug 16, 2021 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Aug 16, 2021 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| May 16, 2021 | RFNT | REFUSAL PROCESSED BY IB | — |
| Apr 22, 2021 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Apr 22, 2021 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Apr 16, 2021 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Apr 15, 2021 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Apr 14, 2021 | DOCK | ASSIGNED TO EXAMINER | — |
| Apr 13, 2021 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Apr 9, 2021 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Apr 8, 2021 | SDRC | SN ASSIGNED FOR SECT 66A SUBSEQ DESIG FROM IB | — |