USPTO serial 79310878
Reviewed by CopyMark Law Group
This registration is in, or will soon enter, a USPTO maintenance window. Missing a Section 8 or Section 9 filing can cancel the registration.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Plus Government fees of $2,275
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
David W. Staple
David W. Staple Casimir Jones, S.C.2275 Deming Way, Suite 310Middleton, WI 53562UNITED STATES| Class | Description | Status | First use |
|---|---|---|---|
| 006 | Common metals and their alloys; prefabricated house sections, non-electric cables and wires of common metal, ironmongery in the nature of metal screws, nails, hinges, washers, springs and nuts, small items of metal hardware in the nature of metal screws, nails, hinges, washers, springs and nuts, safes; windows and doors, roof coverings, gutters, all the aforesaid goods of metal | ACTIVE | — |
| 011 | Apparatus and installations for heating, ventilating, air conditioning, water supply and sanitary purposes, all the aforesaid goods exclusively being components or accessories for prefabricated houses sold separately, namely water heaters, air conditioners, toilets, sink and shower; apparatus for lighting, heating, steam generating, cooking, refrigerating, drying, ventilating and water supply purposes, namely heating installations, lamps, steam valves, ventilation hoods for stoves, refrigerators, electric cooking stoves, laundry drying machines | ACTIVE | — |
| 019 | Natural and artificial stone, non-metal transportable homes being manufactured housing and prefabricated house sections, windows and doors, wooden flooring and floor tiles of natural stone, boards of wood and wood-like materials, impregnated sawn timber, glued laminated sawn timber, wood-composite boards and joinery in the nature of wood posts, wood rafters; asphalt, pitch and bitumen; building materials, namely cement, hydrated building lime, mortar, plaster, gravel, rigid tubes of sandstone or cement, prefabricated non-metal chimneys, non-metal roof coverings, non-metal rain gutters | ACTIVE | — |
| 027 | Floor coverings, non-textile wall hangings | ACTIVE | — |
| 037 | Building construction; repair of buildings, apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling electricity, and apparatus for lighting, heating, steam generating, cooking, refrigerating, drying, ventilating, and water supply in buildings and sanitary purposes; tile, plasterboard and elevator installation services; demolition of buildings, building sealing, asphalting, installation and repair of lifts, rental of excavators, construction information, building construction supervision, rental of construction machines, installation and repair of house and garden watering systems, boring of water shafts and wells, maintenance and repair of burners, roofing services, building insulating in the nature of installation of building insulation, cleaning and repair of boilers, installation and repair of burglar alarm systems, installation and repair of electric apparatus in the nature of residential electric systems and consumer electric appliances, interference elimination in electric installations, furniture maintenance, installation and repair of ovens, maintenance and repair of safes, repair of pumps, building cleaning services in the nature of exterior cleaning and interior cleaning of buildings, lock repair; [ sandblasting, ] bricklaying, wallpapering, installation and repair of telephones, cabinet repair; construction and completion of prefabricated houses in the nature of interior and exterior painting, installation of apparatus and installations for heating, ventilating, air-conditioning, water supply and sanitary purposes, all the aforesaid services exclusively for or in connection with prefabricated houses | ACTIVE | — |
| 040 | * Sandblasting * | ACTIVE | — |
| 042 | Interior, architectural, and feng shui design planning and consultancy; architectural services; structural and civil engineering | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Sep 17, 2026 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Nov 9, 2022 | INNA | INVALIDATION REVIEWED - NO ACTION REQUIRED BY OFFICE | — |
| Oct 17, 2022 | INPR | PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Jun 22, 2022 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| May 25, 2022 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| May 24, 2022 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Mar 7, 2022 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Feb 22, 2022 | CORR | CORRECTION FROM IB ENTERED - NO REVIEW REQUIRED | — |
| Feb 17, 2022 | COC. | CORRECTION UNDER SECTION 7 - PROCESSED | — |
| Feb 17, 2022 | PLGL | ASSIGNED TO PARALEGAL | — |
| Dec 18, 2021 | RINX | USPTO CORRECTION PROCESSED BY IB | — |
| Dec 18, 2021 | CRCV | CORRECTION TRANSACTION RECEIVED FROM IB | — |
| Dec 7, 2021 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Sep 21, 2021 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Sep 21, 2021 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Sep 15, 2021 | CRSN | CORRECTION SENT TO IB | — |
| Sep 14, 2021 | CRCR | CORRECTION CREATED FOR IB | — |
| Sep 1, 2021 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Aug 16, 2021 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Aug 16, 2021 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Aug 16, 2021 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Aug 16, 2021 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Aug 16, 2021 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Aug 15, 2021 | RFNT | REFUSAL PROCESSED BY IB | — |
| Jul 28, 2021 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jul 27, 2021 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jul 27, 2021 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jul 21, 2021 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jul 21, 2021 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jul 21, 2021 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jul 7, 2021 | CHAN | APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED | — |
| Jul 7, 2021 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Jul 7, 2021 | ECDR | TEAS CHANGE OF DOMESTIC REPRESENTATIVES ADDRESS | — |
| Jul 7, 2021 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jul 7, 2021 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Jul 7, 2021 | COAR | TEAS CHANGE OF OWNER ADDRESS RECEIVED | — |
| Jun 21, 2021 | RFNT | REFUSAL PROCESSED BY IB | — |
| Jun 3, 2021 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Jun 3, 2021 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Jun 2, 2021 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Jun 1, 2021 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| May 28, 2021 | DOCK | ASSIGNED TO EXAMINER | — |
| May 22, 2021 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| May 18, 2021 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| May 13, 2021 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |