Drawing for TENRAIN SCRUM

USPTO serial 79311488

TENRAIN SCRUM

Reviewed by CopyMark Law Group

Reg. 6681637Status 700Registered
Filing date
Status date
Registration date
Mar 29, 2022
Examiner
LEE, JANET H
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with TENRAIN SCRUM?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Rebeccah Gan

Rebeccah Gan Wenderoth LLP1025 Connecticut Avenue NW, Suite 500Washington, DC 20036UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
019Plastic building materials, namely, plastic conduit for drainage, multilayer panels of plastic for use in buildings, plastic floorboards, plastic tiles; rainwater inlets of plastics for building or construction, namely, plastic conduit for drainage and irrigation; rainwater inlets of plastics for building or construction, namely, plastic conduit for drainage and irrigation; rainwater infiltration facilities of plastics for building or construction, namely, drain pipes; paving blocks, not of metal nor of masonry; water-pipes, not of metal nor of masonry; drain pipes, not of metal nor of masonry; brackets, not of metal nor of masonry, for building; street gutters, not of metal nor of masonryACTIVE—
020Plastic parts and accessories specially adapted for plastic packaging containers; plastic sealing accessories for plastic packaging containers, namely, plastic rods for sealing bags, plastic clips for sealing bags; plastic boxes for delivery and storage; storage boxes of plastics; storage tanks of plastics; containers for transport, not of metal; metal-substitute plastic fasteners, namely, bolts, nails, rivets, screws; nails, nuts, screws, bolts, rivets and casters, not of metal; non-metal wedges and tacks for fastening plastic containers for medical waste and adhering plastics lids to plastic containers for medical waste; washers of plastic, not of metal, not of rubber or vulcanized fiber, for fastening plastic containers for medical waste and adhering plastic lids to plastic containers for medical waste; locks, non-electric, not of metal; non-metallic small items of hardware for sealing, namely, plastic rod-shaped tools for manually pushing plastic lids into plastic containers to ensure a tight seal; liquid storage tanks or reservoirs for temporary storage of liquid, not of metal or masonry; rainwater tanks, not of metal nor of masonry; industrial water storage tanks, not of metal or masonry; boxes of wood or plastics; plastic barrelsACTIVE—
037Construction services; construction consultancy; operation and maintenance of building equipment, namely, rainwater infiltration facilities of plastics for building or construction, namely plastic drain pipes and plastic conduit for drainage and irrigation; repair or maintenance of plastic processing machines and apparatus; rental of construction machines and apparatus; installation of rainwater filtration facilities, rainwater drainage facilities, rainwater collecting facilities or rainwater tanks; consultancy regarding installation of rainwater filtration facilities, rainwater drainage facilities, rainwater collecting facilities or rainwater tanks; maintenance of rainwater filtration facilities, rainwater drainage facilities, rainwater collecting facilities or rainwater tanks; maintenance or repair of plastic rainwater inlets or rainwater tanks; rental of rainwater filtration facilities, rainwater drainage facilities, rainwater collecting facilities or rainwater tanksACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Dec 30, 2023NREPNEW REPRESENTATIVE AT IB RECEIVED—
Sep 26, 2022FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Aug 23, 2022XXSSGENERIC MADRID TRANSACTION SENT TO IB—
Aug 23, 2022XXCRGENERIC MADRID TRANSACTION CREATED—
Jun 29, 2022FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Mar 29, 2022R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jan 11, 2022NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Jan 11, 2022PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jan 10, 2022GPNXNOTIFICATION PROCESSED BY IB—
Dec 22, 2021OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Dec 22, 2021OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Dec 22, 2021NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Dec 6, 2021CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Nov 19, 2021TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Nov 19, 2021CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Nov 19, 2021TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jul 1, 2021CRSNCORRECTION SENT TO IB—
Jun 30, 2021CRCRCORRECTION CREATED FOR IB—
Jun 13, 2021RFNTREFUSAL PROCESSED BY IB—
May 27, 2021RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
May 27, 2021RFRRREFUSAL PROCESSED BY MPU—
May 26, 2021MAFRAPPLICATION FILING RECEIPT MAILED—
May 25, 2021RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
May 24, 2021CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 22, 2021DOCKASSIGNED TO EXAMINER—
May 22, 2021NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
May 20, 2021REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance