USPTO serial 79311493
Reviewed by CopyMark Law Group
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Francesco Braga
Francesco Braga Perani & Partners S.p.A.Piazza Armando Diaz 7Milano, 20123ITALY| Class | Description | Status | First use |
|---|---|---|---|
| 006 | Common metals and their alloys; metal materials for construction, namely, floor panels; transportable buildings of metal; non-electric cables and wires of common metal; small items of metal hardware, namely, springs; containers of metal for storage or transport; metal or non-metal safes | ACTIVE | — |
| 019 | Non-metal building and construction materials and elements, namely, soffits and fascia; rigid pipes, not of metal, for building; asphalt; pitch; bitumen; tar; transportable buildings, not of metal: monuments, not of metal | ACTIVE | — |
| 033 | Wine | ACTIVE | — |
| 035 | Advertising; business management; business administration; clerical services * ; all the aforesaid services excluding any services pertaining to the advertising, management, or administration of fashion businesses or fashion retailing * | ACTIVE | — |
| 036 | Insurance services, namely, real estate title insurance underwriting services; financial services, namely, on-line financial planning services; monetary affairs, namely, financial information, management, and analysis services; real estate services, namely, appraisal of real estate | ACTIVE | — |
| 037 | Construction and repair of buildings, roads, bridges, dams and electrical transmission lines; installation and maintenance of road signs; construction, installation and maintenance of structural devices, expansion joints, support devices, antiseismic retensions for roads, bridges and building constructions; installation and maintenance of vehicle containment devices and road barriers; construction, installation and maintenance of prefabricated concrete buildings; construction and maintenance of waste disposal plants; construction, maintenance and installation of electrical systems for power generation and destruction plants; installation and maintenance of electrical control panels and computer systems; installation and maintenance of telephone lines and high-frequency telephone systems; construction of metal- framed buildings; construction, maintenance and installation of telecommunication and data processing networks and related equipment; soil consolidation namely, soil erosion control services; construction, restructuring, installation and maintenance of potabilization and water purification plants; construction, renovation and maintenance of industrial or civil buildings; restoration of real estate in the nature of building restoration services; construction and maintenance civil engineering structures, including roads, highways, bridges, aqueducts, gas pipelines, oil pipelines, agricultural irrigation systems and wastewater removal works; waterproofing of buildings; construction and maintenance of river works, namely, dams, weirs and levees; construction, renovation and repair of plants for the production and transformation of electricity; installation and maintenance of heating, ventilation and air conditioning systems; installation and maintenance of electrical systems, telephone systems, radio transmission facilities, and television broadcast towers; maintenance services for real estate property; construction of residential buildings; demolition services, namely, buildings, roads, highways, bridges, aqueducts, gas pipelines, oil pipelines, dams, leeves; construction, installation and maintenance of conveyor and lifting systems, elevators and escalators; installation and maintenance of pneumatic conveyor systems in factories; installation and maintenance of anti-intrusion systems; installation of coating and insulation materials to the buildings; masonry; painting services, namely, application of protective paint on walls; house painting; installation of building insulation; installation and maintenance of noise and fire barriers; construction and maintenance of railways and associated structures; construction, installation and maintenance of factories for manufacturing neon signs; construction and maintenance of ports and structures for maritime areas, specifically, lighthouses; installation of safety equipment | ACTIVE | — |
| 040 | Environmental remediation services, namely, treatment of soil, waste, and water; purification and treatment of water; environmental remediation services, namely, treatment of soil, waste, and water; Environmental remediation services, namely, adding waterproofing agents to soil for purposes of stabilization and inhibiting contaminant migration; energy productions | ACTIVE | — |
| 042 | Design of building constructions, roads, bridges, dams or transmission lines; land and road surveying; consultancy in the field of architecture and construction drafting; technological advice in the field of workplace safety | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Dec 11, 2025 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Aug 1, 2023 | INNA | INVALIDATION REVIEWED - NO ACTION REQUIRED BY OFFICE | — |
| Jul 3, 2023 | INPR | PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Jan 9, 2023 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Dec 21, 2022 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Dec 21, 2022 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Dec 20, 2022 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Dec 6, 2022 | NURC | NOTICE OF UPDATED REGISTRATION CONFIRMATION EMAILED | — |
| Nov 3, 2022 | LIME | LIMITATION FROM THE IB EXAMINED AND ENTERED | — |
| Nov 3, 2022 | COC. | CORRECTION UNDER SECTION 7 - PROCESSED | — |
| Sep 20, 2022 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Sep 20, 2022 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jul 25, 2022 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Jul 10, 2022 | LIMG | LIMITATION OF GOODS RECEIVED FROM IB | — |
| Jul 5, 2022 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Jul 5, 2022 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jun 29, 2022 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Jun 29, 2022 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Jun 15, 2022 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Jun 1, 2022 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| May 31, 2022 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| May 31, 2022 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| May 31, 2022 | ERFR | TEAS REQUEST FOR RECONSIDERATION RECEIVED | — |
| May 25, 2022 | GNFN | NOTIFICATION OF FINAL REFUSAL EMAILED | — |
| May 25, 2022 | GNFR | FINAL REFUSAL E-MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| May 25, 2022 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| May 12, 2022 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| May 12, 2022 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| May 12, 2022 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Dec 6, 2021 | RFNT | REFUSAL PROCESSED BY IB | — |
| Nov 16, 2021 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Nov 16, 2021 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Nov 12, 2021 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Nov 11, 2021 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Nov 9, 2021 | DOCK | ASSIGNED TO EXAMINER | — |
| Oct 15, 2021 | LOPR | LETTER OF PROTEST EVIDENCE REVIEWED-NO FURTHER ACTION TAKEN | — |
| Oct 10, 2021 | LOPT | LETTER OF PROTEST EVIDENCE FORWARDED | — |
| Sep 29, 2021 | DOCK | ASSIGNED TO EXAMINER | — |
| May 26, 2021 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| May 22, 2021 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| May 20, 2021 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |