USPTO serial 79311653
Reviewed by CopyMark Law Group
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Jason L DeFrancesco
Jason L DeFrancesco DeFrancesco Lee LLC174 Nassau Street, No. 342Princeton, NJ 08542UNITED STATES| Class | Description | Status | First use |
|---|---|---|---|
| 007 | Uninterruptible power supplies machines for the generation of electrical energy obtained from alternative energy sources; emergency power generators; power installations in the nature of electric generators; current generators; solar power electricity generators; power generators for land vehicles; mobile electrical power generators; gas operated power generators; emergency power supply generators; electricity power generators for use with hydrogen production | ACTIVE | — |
| 009 | Scientific and research apparatus and instruments, namely, Turbine control systems comprising electronic sensors and related downloadable and recorded software for generation, storage and utilization of energy using hydrogen as the main energy vector; apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling the distribution or use of electricity; energy regulators in the nature of voltage regulators for electric power; energy control devices in the nature of electric control devices for heating and energy management; solar energy collectors for electricity generation; electric control devices for energy management; apparatus for monitoring electrical energy consumption; apparatus for converting electronic radiation to electrical energy, namely, photovoltaic solar hybrid modules; transformers, and electrical power distribution units; current convertors; electric power controllers; photovoltaic installations for generating electricity in the nature of photovoltaic-based power plants; photovoltaic apparatus for generating electricity, namely, hydrogen generation through renewables or other kind of energy and photons; apparatus and instruments for accumulating and storing electricity, namely, electrochemical batteries and hydrogen storage through power conversion system comprising electronic components in the nature of transformers and integrated circuits | ACTIVE | — |
| 040 | Energy production services; generation of electricity from solar energy; generation of electricity from wave energy; generation of electricity from wind energy; generation of electricity from geothermal energy; production of electrical power from renewable sources; generation of electrical power using carbon sequestration; consultancy services relating to the generation of electrical power; metal treating; mineral treating | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Mar 6, 2023 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Feb 14, 2023 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Feb 14, 2023 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Jan 25, 2023 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Oct 25, 2022 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Oct 25, 2022 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Aug 9, 2022 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Aug 9, 2022 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Aug 9, 2022 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jul 20, 2022 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Jul 20, 2022 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Jul 20, 2022 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Jul 6, 2022 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jul 6, 2022 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Jul 6, 2022 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Jul 6, 2022 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Jul 6, 2022 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Jun 15, 2022 | ZZZX | PREVIOUS ALLOWANCE COUNT WITHDRAWN | — |
| Jun 7, 2022 | PBCR | WITHDRAWN FROM PUB - OG REVIEW QUERY | — |
| May 25, 2022 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| May 25, 2022 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| May 25, 2022 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| May 25, 2022 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| May 25, 2022 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Apr 26, 2022 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Apr 25, 2022 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Apr 25, 2022 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Dec 6, 2021 | RFNT | REFUSAL PROCESSED BY IB | — |
| Nov 12, 2021 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Nov 12, 2021 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Oct 15, 2021 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Oct 14, 2021 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Sep 19, 2021 | DOCK | ASSIGNED TO EXAMINER | — |
| Jun 1, 2021 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| May 28, 2021 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| May 27, 2021 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |