Drawing for ASAS

USPTO serial 79313089

ASAS

Reviewed by CopyMark Law Group

Reg. 6805574Status 700Registered
Filing date
Status date
Registration date
Aug 2, 2022
Examiner
LEE, OLIVIA SUNMIN
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with ASAS?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

John S. Egbert

John S. Egbert Egbert, McDaniel & Swartz, PLLC1001 Texas Ave., Suite 1250Houston, TX 77002UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
006Ores of non-precious metal; common metals and their alloys and semi-finished products made of these materials in the form of metal, steel or aluminum foils, sheets, profiles, wire, rods, bars, pipes, tubes, powder form for further processing and billets; goods and materials of common metal used for storage, wrapping, packaging and sheltering purposes, namely, containers of metal for storage and transport of goods, transportable buildings of metal, frames of metal for building, poles of metal for building, metal boxes, packaging containers of metal, aluminum foil, fences made of metal, guard barriers of metal for building, metal tubes, storage containers of metal for goods, metal containers for the transportation of goods, ladders of metal; wire gauze; doors, windows, shutters, jalousies and their cases and fittings of metal; non-electric cables and wires of metal; ironmongery in the nature of small items of metal hardware, namely, screws of metal, bolts, nails, furniture casters, door fasteners, door handles, door knockers, door openers, door scrapers, door stops, window fasteners, windows openers being metal window cranks, metal screwjacks, window pulleys of metal; ventilation ducts of metal, steel or aluminum, metal roof vents for healing, cooling ventilation in residential and commercial buildings, metal, steel or aluminum vent covers for roof deck protrusions, drains and pitch pans, metal, steel or aluminum pipes, metal, steel or aluminum chimney caps, metal, steel or aluminum manhole covers, grilles of metal for ventilation, heating, sewage, telephone, underground electricity and air conditioning installations; metal panels and boards, non-luminous and non-mechanical, used for signaling, route showing, publicity purposes, signboards of metal, advertisement columns of metal, signaling panels of metal, non-luminous and non-mechanical traffic signs of metal; pipes of metal for transportation of liquids and gas, drilling pipes of metal and their metal fittings, valves of metal, other than parts of machines, couplings of metal for pipes, elbows of metal for pipes, clips of metal for pipes, connectors of metal for pipes; safes in the nature of metal strong boxes; metal railway materials, metal rails, metal railway ties, railway switches of metal or aluminum; bollards of metal, floating docks of metal, mooring buoys of metal, anchors; metal molds for casting, other than machine parts; works of art made of common metals or their alloys; metal closures for bottles, containers, bags, bottle caps of metal; metal poles; metal pallets and metal ropes for lifting, loading and transportation purposes; metal hangers, ties, straps, tapes and bands used for load-lifting and load-carryingACTIVE—
019Sand, gravel, crushed stone, asphalt, bitumen, cement, gypsum, plaster, concrete, marble blocks for construction, included in this class; building materials as finished products made of concrete, gypsum, clay, potters' clay, stone, marble, wood, plastics and synthetic materials for building, construction, road construction purposes, included in this class, namely, panels, boards, walls, divisions being dividers, wallboard, tiles, coatings, framework, moldings; non-metallic transportable or prefabricated buildings, non-metallic building materials in the nature of fiberglass panels, floor boards, ceiling boards, fascia, doors, windows, claddings, linings, tiles, shutters, blinds, jalousies, poles not of metal for power lines, crash barriers not of metal; natural and synthetic coatings in the form of panels and sheets, being building materials; bitumen cardboard coatings for roofing; bitumen coating for roofing; doors and windows of wood and synthetic materials; traffic signs not of metal, non-luminous and non-mechanical, for roads; monuments and statuettes of stone, concrete and marble; building glass; prefabricated swimming pools not of metal structures; aquarium sandACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Dec 21, 2022FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Nov 9, 2022XXSSGENERIC MADRID TRANSACTION SENT TO IB—
Nov 8, 2022XXCRGENERIC MADRID TRANSACTION CREATED—
Nov 2, 2022FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Aug 2, 2022NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Aug 2, 2022R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jul 16, 2022NREPNEW REPRESENTATIVE AT IB RECEIVED—
May 24, 2022GPNXNOTIFICATION PROCESSED BY IB—
May 17, 2022NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
May 17, 2022PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Apr 29, 2022OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Apr 27, 2022OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Apr 27, 2022NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Apr 13, 2022ALIEASSIGNED TO LIE—
Apr 12, 2022CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Feb 7, 2022XAECEXAMINER'S AMENDMENT ENTERED—
Feb 7, 2022GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Feb 7, 2022GNEAEXAMINERS AMENDMENT E-MAILED—
Feb 7, 2022CNEAEXAMINERS AMENDMENT -WRITTEN—
Jan 8, 2022TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jan 7, 2022CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jan 7, 2022ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
Dec 14, 2021GNFNNOTIFICATION OF FINAL REFUSAL EMAILED—
Dec 14, 2021GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Dec 14, 2021CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Oct 8, 2021TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Oct 7, 2021CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Oct 7, 2021TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Sep 11, 2021RFNTREFUSAL PROCESSED BY IB—
Aug 23, 2021RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Aug 23, 2021RFRRREFUSAL PROCESSED BY MPU—
Aug 11, 2021RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Aug 10, 2021CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 29, 2021MAFRAPPLICATION FILING RECEIPT MAILED—
Jun 25, 2021DOCKASSIGNED TO EXAMINER—
Jun 25, 2021NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jun 17, 2021REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance