Drawing for ZEG CLIMATE+

USPTO serial 79313376

ZEG CLIMATE+

Reviewed by CopyMark Law Group

Reg. 6920108Status 700Registered
Filing date
Status date
Registration date
Dec 13, 2022
Examiner
SAUNDERS, ANDREA DAWN
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with ZEG CLIMATE+?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Sheldon H. Klein

Sheldon H. Klein Lathrop GPM LLP600 New Hampshire Ave., NW, Suite 700Washington, DC 20037UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
001Hydrogen; gas in solid form and dissolved form for fuelACTIVE—
004Electrical energyACTIVE—
007Hydrogen generators for generating electricityACTIVE—
037Construction of power plants; installation, maintenance and repair activities relating to hydropower, wind power, gas power plants; installation of electrical appliances; installation and repair of heaters and central heating appliances; operation of vehicle service stations; power plant construction; maintenance services of hydrogen vehicles; construction of incineration plants; operation and maintenance services of power plants; construction of gas power plants; construction activities relating to industrial complexes; general building contractor services in connection with dam, reservoir and hydraulic power stations; general building contractor services; installation, repair and maintenance of thermal, hydroelectric and nuclear installationsACTIVE—
040Processing of fuel materials and substances, namely, processing of dry gas, natural gas and natural gas condensates; processing of petrochemical products; production of electric power and electricity from renewable sources; Production of electrical power from renewable sources for production of heat; waste incineration; production of electricity from renewable sources; production of heated water and energy; energy production services; gas purification; air purification; water treatment; destruction of trash and waste; incineration of waste and trash; hydrogen gas production; generation of gas and electricity; gas processing; refining of gasACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Apr 24, 2023FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Mar 30, 2023FICSFINAL DISPOSITION NOTICE SENT TO IB—
Mar 30, 2023FIMPFINAL DISPOSITION PROCESSED—
Mar 13, 2023FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Dec 13, 2022NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Dec 13, 2022R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Dec 11, 2022OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Nov 23, 2022OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Nov 23, 2022OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Oct 10, 2022GPNXNOTIFICATION PROCESSED BY IB—
Sep 27, 2022NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Sep 27, 2022PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Sep 7, 2022OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Sep 7, 2022OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Sep 7, 2022NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Aug 22, 2022CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Aug 22, 2022XAECEXAMINER'S AMENDMENT ENTERED—
Aug 22, 2022GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Aug 22, 2022GNEAEXAMINERS AMENDMENT E-MAILED—
Aug 22, 2022CNEAEXAMINERS AMENDMENT -WRITTEN—
Aug 11, 2022CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED—
Aug 11, 2022TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Aug 11, 2022ECDRTEAS CHANGE OF DOMESTIC REPRESENTATIVES ADDRESS—
Aug 11, 2022ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Aug 11, 2022REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Aug 11, 2022COARTEAS CHANGE OF OWNER ADDRESS RECEIVED—
Aug 3, 2022DMCCDATA MODIFICATION COMPLETED—
Aug 3, 2022ALIEASSIGNED TO LIE—
Aug 2, 2022TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Aug 2, 2022CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Aug 2, 2022TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Feb 20, 2022RFNTREFUSAL PROCESSED BY IB—
Feb 2, 2022RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Feb 2, 2022RFRRREFUSAL PROCESSED BY MPU—
Jan 12, 2022RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Jan 11, 2022CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 11, 2022DOCKASSIGNED TO EXAMINER—
Jun 26, 2021MAFRAPPLICATION FILING RECEIPT MAILED—
Jun 22, 2021NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jun 17, 2021REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance