Drawing for B

USPTO serial 79314874

B

Reviewed by CopyMark Law Group

Reg. 7203748Status 700Registered
Filing date
Status date
Registration date
Oct 31, 2023
Examiner
SEVERSON, JUSTIN
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with B?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Rebecca Liebowitz

Rebecca Liebowitz Venable LLPPO Box 34385Washington, DC 20043UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
009Apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling electricity, namely, electrical switches, electronic circuits, electrical wiring, electrical connectors, electrical transformers, electrical sensors, namely, electric sensors, photoelectric sensors and piezoelectric sensors and electrical transmitters, all for use with solar panel power systems; solar panels for production of electricity; portable solar panels for production of electricity; batteries; sealed batteries; solar batteries; rechargeable batteries; chargers for batteries; boxes for batteries; junction boxes; mountings and casings for solar panels for electricity generations and batteries; control units for the distribution of electricity; electricity inverters; inverters for power supplies; televisions, satellite decoders, DVD players, radios and other electronic apparatus for use with solar panels, namely, televisions, subwoofers, TV antennas, wireless speakers, laptop chargers, USB chargers, grid chargers, rechargeable battery packs; parabolic antenna set; chargers for mobile phones and other electronic apparatus, namely, laptop chargers, USB chargers, grid chargers, rechargeable battery packs; battery chargers for laptop computers; downloadable and recorded management software to record sales, receive payments, view customer history, enable and disable devices, manage stock, generate reports, credit scores and create invoices in relation to the provision of solar energy; downloadable and recorded cloud computing software to record sales, receive payments, view customer history, enable and disable devices, manage stock, generate reports, credit scores and create invoices in relation to the provision of solar energy; downloadable and recorded cloud task management software to monitor business performance; downloadable and recorded remote monitoring software for remote monitoring, controlling and analysis of solar devices; communication hubs; communications equipment, namely, set top boxes, mobile phones; wireless communications equipment, namely, embedded SIM cards on printed circuit boards ("PCBs"), integrated antenna on printed circuit boards ("PCBs"), integrated GPS on printed circuit boards ("PCBs"); wireless routers; downloadable and recorded mobile application software to facilitate sales agents to sign up customers, and improve and monitor portfolio performance; downloadable computer software for use in remote meter monitoring and reading; downloadable computer software for use in sales and service management; downloadable computer software for facilitating payment transactions by electronic means; downloadable computer software for monitoring, controlling and running physical world operations; downloadable payment software; downloadable computer E-commerce software to allow users to perform electronic business transactions via a global computer network; magnetically encoded credit cards; magnetically encoded debit cards; magnetically encoded pre-payment cards; meter reading apparatus and instruments, namely, gas meters, water meters, electronic water meters; electricity meters; electricity storage apparatus, namely, electric storage batteries; smoke detectors; gas detectors for detecting the presence of gas; carbon monoxide detectorsACTIVE—
011Apparatus for lighting, heating, cooking, refrigerating, drying, ventilating, water supply and sanitary purposes namely, solar home systems comprised of solar heat collection panels as well as containment enclosures and internal wiring, electric stoves, LPG gas stoves and canisters, cylinder locking valves ("CLVs"), electric pressure cookers, food dryers, chiller units for chilling milk and water, walk-in fridge, solar powered electric water pumps, water filters, security lighting installations, LED light bulbs, lighting tubes, electric torches for lighting, electric fans; solar heat collection panels, solar heat collection panels used in heating and lighting; lamps powered by solar panels; electric lamps; LED lamps; LED lights namely, lighting LED lights; mountings and casings for solar collection panels for capturing solar energy; refrigerators; fridge-freezers; freezers; electric torches for lighting; rechargeable electric torches for lighting; electric pocket torches for lighting; gas stoves; LPG gas stoves; parts, fittings and accessories for all the aforesaid goods, namely, hoses, extension cables and junction boxesACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jan 29, 2026CHLDCHANGE OF OWNER RECEIVED FROM IB—
Feb 26, 2024FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Feb 2, 2024FICSFINAL DISPOSITION NOTICE SENT TO IB—
Feb 2, 2024FIMPFINAL DISPOSITION PROCESSED—
Jan 31, 2024FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Oct 31, 2023NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Oct 31, 2023R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Aug 15, 2023NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Aug 15, 2023PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Aug 14, 2023GPNXNOTIFICATION PROCESSED BY IB—
Jul 26, 2023OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Jul 26, 2023OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Jul 26, 2023NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Jul 7, 2023CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jul 7, 2023XAECEXAMINER'S AMENDMENT ENTERED—
Jul 7, 2023GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Jul 7, 2023GNEAEXAMINERS AMENDMENT E-MAILED—
Jul 7, 2023CNEAEXAMINERS AMENDMENT -WRITTEN—
Jul 6, 2023ZZZXPREVIOUS ALLOWANCE COUNT WITHDRAWN—
Jun 20, 2023PBCRWITHDRAWN FROM PUB - OG REVIEW QUERY—
Jun 2, 2023CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
May 5, 2023TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
May 5, 2023CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
May 5, 2023TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Dec 27, 2022OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Dec 7, 2022OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Dec 7, 2022OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Nov 6, 2022GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Nov 6, 2022GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Nov 6, 2022CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 30, 2022TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Sep 30, 2022CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Sep 30, 2022TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Apr 24, 2022RFNTREFUSAL PROCESSED BY IB—
Apr 1, 2022RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Apr 1, 2022RFRRREFUSAL PROCESSED BY MPU—
Mar 5, 2022RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Mar 4, 2022CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 24, 2022DOCKASSIGNED TO EXAMINER—
Oct 20, 2021ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB—
Jul 13, 2021MAFRAPPLICATION FILING RECEIPT MAILED—
Jul 8, 2021NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jul 1, 2021SDRCSN ASSIGNED FOR SECT 66A SUBSEQ DESIG FROM IB—

Frequently asked questions

Related guidance