Drawing for RAUMASTER

USPTO serial 79316011

RAUMASTER

Reviewed by CopyMark Law Group

Reg. 7014508Status 700Registered
Filing date
Status date
Registration date
Apr 4, 2023
Examiner
SEVERSON, JUSTIN
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with RAUMASTER?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Mark E. Olds

Mark E. Olds Muncy, Geissler, Olds & Lowe, P.C.4000 Legato Road Suite 310Fairfax, VA 22033UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
006Metal shelter structures and transportable buildings of metal; Metal containers for storage or transport; Loading pallets of metal; Silos of metalACTIVE—
007Machine tools, namely, crushing machines for industrial purposes; Machine tools, namely, paper cutting machines, paper roll core cutting machines; Machine tools, namely, feeders for wood processing industry, feeders for energy industry; Machine tools, namely, feeding apparatus for engine boilers; Machine tools, namely, sieves being machines; Machine tools, namely, sieves being parts of machines; Machine tools, namely, sifting machines; Motors and engines, except for land vehicles; Machine coupling and transmission components, except for land vehicles; Moving and handling equipment, namely, machines for de-icing wood in wood processing industry, machines for debarking wood in wood processing industry; Machines for chipping wood in wood processing industry and in energy and power plants; Machines for shredding bark in wood processing industry and in energy and power plants; Machines for screening wood chips in wood processing industry, machines for screening and crushing fuels, namely wood-based biomasses, pellets, briquettes, peat, coal, recycled fuels, sludge, agricultural wastes, agricultural by-products and solid recovered fuels, in energy and power plants; Moving and handling equipment, namely, mechanical apparatus for moving, slitting, winding and storing paper rolls; Moving and handling equipment, namely, papermaking machines; Belt conveyors; Belts for conveyors; Capstans; Chain conveyors; Screw conveyors; Derricks; Lifting apparatus, namely, hydraulic extendable material conveyors, mechanical extendable material conveyors, and material lifting platforms; Elevator belts; Elevator chains being parts of machines; Elevators; Handling apparatus for loading and unloading, namely, screw reclaimers, chain reclaimers, stoker reclaimers, walking floor feeders; Hoists; Packing machines; Wrapping machines; Coil winding machines; Unwinding machines; Rack and pinion jacks, namely, power jacks; Platform truck lifts; Winches; Reeling apparatus, mechanical, namely, paper reeling machinesACTIVE—
009Computers and computer peripheral devices; Recorded computer software controlling and managing factory production operations, storage and internal logistics; Computer operating programs, recorded; Computer software applications, downloadable, for controlling and managing factory production operations; Recorded logistics software for handling paper rolls; Electric control panels; Electrical switch cabinets, namely, switch boxes, electrical connection boxes; Weighing apparatus and instruments, namely, scalesACTIVE—
012Handling carts; Roll containers in the nature of trolleys; Pallet transfer trucks; Aerial conveyors; Carts; Forklift trucks; Railway carriages; Side cars; Tilt trucks; Tilting-carts; TrolleysACTIVE—
020Containers, not of metal, for storage or transport; Storage racks; Crates and pallets, non-metallicACTIVE—
037Building construction services; Construction project management services; Building construction supervision; Construction consultancy; Electric appliance installation and repair; Elevator installation and repair; Factory construction; Warehouse construction and repair; Construction of power plants; Machinery installation, maintenance and repairACTIVE—
039Consultancy services relating to transportation; Consultancy relating to storage spaces and warehouses; Advisory services relating to the storage of goodsACTIVE—
042Scientific and technological services, namely, design relating to factory production operations, storage and internal logistics in wood processing industry and in energy and power plants; Industrial analysis, industrial research and industrial design services; Design and development of computer hardware and software; Architectural consultancy; Construction drafting; Engineering project management services; Consultancy in the field of energy-saving; Engineering; Engineering consultancy relating to factory production operations, storage and internal logistics in wood processing industry and in energy and power plants; Engineering design services; Computer system design; Computer programming; Planning of buildings for storage spaces and warehousesACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Sep 26, 2025NREPNEW REPRESENTATIVE AT IB RECEIVED—
Aug 14, 2023FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Jul 20, 2023FICSFINAL DISPOSITION NOTICE SENT TO IB—
Jul 20, 2023FIMPFINAL DISPOSITION PROCESSED—
Jul 4, 2023FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Apr 4, 2023NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Apr 4, 2023R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jan 24, 2023GPNXNOTIFICATION PROCESSED BY IB—
Jan 17, 2023NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Jan 17, 2023PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jan 15, 2023OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Jan 4, 2023OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Jan 4, 2023OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Dec 28, 2022OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Dec 28, 2022OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Dec 28, 2022NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Dec 14, 2022CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Dec 7, 2022TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Dec 6, 2022CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Dec 6, 2022TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Nov 6, 2022GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Nov 6, 2022GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Nov 6, 2022CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 7, 2022TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Oct 6, 2022CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Oct 6, 2022TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Apr 24, 2022RFNTREFUSAL PROCESSED BY IB—
Apr 7, 2022RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Apr 7, 2022RFRRREFUSAL PROCESSED BY MPU—
Mar 9, 2022RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Mar 8, 2022CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 24, 2022DOCKASSIGNED TO EXAMINER—
Jul 31, 2021MAFRAPPLICATION FILING RECEIPT MAILED—
Jul 27, 2021NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jul 22, 2021REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance