USPTO serial 79319000
TRACKTEC
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- —
- Examiner
- COHEN, ROBERT ANDREW
- Law office
- TMEG LAW OFFICE 103 - EXAMINING ATTORNEY ASSIGNED
What this means
These status codes mean the trademark application is abandoned and no longer pending. Common reasons include missing an Office Action response (600), filing without a valid basis (602), express abandonment by the applicant (604), or failure to respond to an examiner's inquiry (618). Revival may be possible in limited circumstances. If abandonment was unintentional, consult counsel about a petition to revive. Otherwise file a new application if protection is still needed.
Need help with TRACKTEC?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Owner
Goods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 006 | Railway sleepers of metal, railway material of metal, materials of steel for railway permanent ways, including railway points and components therefor, railway flat crossings, gauge interchanges, railway switch points, metal building materials; transportable buildings of metal; materials of metal for railway tracks, railway subgrades, railway tracks, points, crossings and parts therefor; non-electric cables and wires of common metal; ironmongery, small separate items of metal hardware; pipes and tubes of metal; goods of common metal not included in other classes; fishplates of metal for railway tracks, point levers or switching devices, winches (rods), devices for locking the final position of railway switch points, device block switches | ACTIVE | — |
| 009 | Railway traffic control apparatus, teletechnical equipment, railway signalling apparatus, street signalling apparatus; railway traffic safety appliances; measuring, signalling, checking (supervision) apparatus and instruments, apparatus for the monitoring of railway switch point positions, wheel sensor switches, remote control apparatus for railway switches, apparatus for regulating or controlling electricity used in railway transport, electrodynamic apparatus for the remote control of railway points, electrodynamic apparatus for the remote control of signals, telerupters, circuit breakers, electrodynamic apparatus for the remote control of railway points, electrodynamic apparatus for remote control, railway traffic safety apparatus, automatic apparatus for the remote control of railway points, distance measuring apparatus, apparatus for railway traffic control and protection; diagnostic apparatus for railway switch points; apparatus for the testing of railway switch point apparatus | ACTIVE | — |
| 019 | Building materials (non-metallic), non-metallic rigid pipes for building, building panels, not of metal, cement slabs, joists, not of metal, framework, not of metal, for building, railway sleepers, not of metal, concrete sleepers, in particular concrete switch sleepers, railway sleepers, not of metal, concrete building elements, paving blocks, not of metal, paving slabs, not of metal, crash barriers, not of metal, for roads, support rails, retaining walls, concrete and cement tiles | ACTIVE | — |
| 037 | Building construction, repair of railway tracks, maintenance and repair of locomotives and carriages (railway) of all kinds, railway tracks, switch points, railway installation apparatus, equipment and systems and management of railway networks and structures related thereto consisting of providing information relating to the repair or maintenance of railway networks and structures, servicing, maintenance and repair of electrical and electronic apparatus and vehicle parts | ACTIVE | — |
| 042 | Scientific and technological research and design relating thereto, architectural consultation, industrial analysis and research services, engineering, research in the field of technology and mechanical engineering, technical planning and the development of railways, macadam road surfaces and road surfaces other than macadam; development of railway parts, in particular railway switch points, railway points, connectors and parts and drives therefor, carrying out of technical tests for the aforesaid goods; technical design planning in the field of, or for dimensioning and development of railway systems, technical project studies, equipment design and development, engineering, technological consultancy, industrial design | ACTIVE | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Aug 28, 2023 | FINT | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Aug 8, 2023 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Aug 8, 2023 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Feb 27, 2023 | OPNX | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB | — |
| Feb 8, 2023 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Feb 8, 2023 | OPNR | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | — |
| Sep 13, 2022 | UNDN | UNDELIVERABLE MAIL - NO ACTION TAKEN | — |
| Aug 9, 2022 | MAB2 | ABANDONMENT NOTICE MAILED - FAILURE TO RESPOND | The trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time. |
| Aug 8, 2022 | ABN2 | ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE | The trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time. |
| Feb 14, 2022 | RFNT | REFUSAL PROCESSED BY IB | — |
| Jan 25, 2022 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Jan 25, 2022 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Jan 4, 2022 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Jan 3, 2022 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Dec 20, 2021 | DOCK | ASSIGNED TO EXAMINER | — |
| Sep 7, 2021 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Sep 3, 2021 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Sep 2, 2021 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |