Drawing for HYDRON

USPTO serial 79322427

HYDRON

Reviewed by CopyMark Law Group

Reg. 6945230Status 700Registered
Filing date
Status date
Registration date
Jan 10, 2023
Examiner
AVENT, TEAGUE A
Law office
TMO LAW OFFICE 126

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with HYDRON?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Pamela N. Hirschman

Pamela N. Hirschman Davis Graham & Stubbs LLP3400 Walnut Street, Suite 700Denver, CO 80205United States

Goods and services

ClassDescriptionStatusFirst use
019Lime building materials, not of metal; parquet flooring of wood and laminated wood and plastic elements; building panels, not of metal; wood panelling; parquet flooring; parquet floor boards; panels, not of metal, in particular flexible panels for walls, floors and ceilings; wall linings, not of metal, for building, namely, wall boards; screens of wood, namely, window screens; girders, not of metal; building glass; building timber; building stone; buildings, transportable, not of metal; transportable buildings, not of metal; wood boards; Vinyl tiles and tile floorings, not of metal; floors, not of metal, in particular flexible floors; geotextiles; framework for building, not of metal; wood boards, wood, semi-worked, wood rafters, wood veneers, wooden flooring, timber flooring, wood paving, wood paneling; jalousies, not of metal; tiles, not of metal, for building; ceramic paving and surfacing being ceramic tiles; artificial wood in the nature of plastic tiles, laths, not of metal; arbours as structures being arbours not of metal; porches being structures, not of metal, for building; wall claddings, not of metal, for building; piles being non-metallic, namely, concrete piles; palings, not of metal; paving blocks, posts, not of metal; paving slabs, not of metal; paving tiles, not of metal, in particular flexible paving tiles; frames being framework, not of metal, for building, mouldings, not of metal, for cornices, building stone, works of stonemasonry being building stone, natural stone slabs; stair-treads being steps, not of metal; wood panelling, not of metal; semi-worked wood, beams, not of metal; partitions, not of metal for building; doors, not of metal, namely, doors of wood clad in aluminumACTIVE—
027Floor coverings, in particular flexible floor coverings; floor coverings being laminated coverings for existing floors; wall hangings, not of textileACTIVE—
035Retail and wholesale store services, online retail and wholesale store services, and mail order services, all featuring building materials of metal, metal constructions, screens of metal, ironmongery, scaffolding of metal, latticework of metal, shutters of metal, tiles of metal for building, duckboards of metal, fittings of metal for furniture, nameplates of metal, palings of metal, paving blocks of metal, metal paving slabs, outdoor blinds of metal, roller blinds of steel, pilings of metal, stair treads being of metal, window lintels of metal, door lintels of metal, props of metal, panelling of metal, construction materials not of metal, parquet flooring of wood and laminate and plastic elements, building panels, not of metal, wood panelling, parquets, parquet floor boards, wall covering parts, not of metal, screens of wood, joists, not of metal, building glass, building timber, building stone, transportable nonmetallic buildings, buildings, not of metal, planks and beams of wood, tiles, tile floorings, not of metal, nonmetal floors, geotextiles, scaffolding, not of metal, being frameworks for buildings, timber, partly processed timber, wooden beams, wood veneers, wooden flooring, timber flooring, wood paving, wood panelling, jalousies, not of metal, tiles, not of metal, for building, ceramic floor panels and floor coverings, artificial wood, laths, not of metal, bed frames, not of metal, arbours being structures, porches, not of metal, for building, wall claddings, not of metal, panels for walls, floors and ceilings, piles, not of metal, palings, not of metal, paving blocks, posts, not of metal, tile floorings, not of metal, tile coverings, not of metal, frames, mouldings, not of metal, for cornices, stone, works of stonemasonry, stone slabs, stair-treads being steps, not of metal, panelling, not of metal, semi-worked wood, beams, not of metal, partition walls, not of metal, non-metal doors, floor coverings, in particular elastic floor coverings and elastic floor covering elements, floor coverings being underlays for laminate floors, wall coverings for existing walls made of non-textile materialsACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jun 4, 2026NREPNEW REPRESENTATIVE AT IB RECEIVED—
Mar 13, 2025TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Mar 13, 2025ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Mar 13, 2025REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
May 16, 2023FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Apr 21, 2023FICSFINAL DISPOSITION NOTICE SENT TO IB—
Apr 21, 2023FIMPFINAL DISPOSITION PROCESSED—
Apr 10, 2023FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Jan 10, 2023NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Jan 10, 2023R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Oct 25, 2022GPNXNOTIFICATION PROCESSED BY IB—
Oct 25, 2022NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Oct 25, 2022PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Oct 5, 2022OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Oct 5, 2022OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Oct 5, 2022NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Sep 22, 2022CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Aug 30, 2022TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Aug 30, 2022CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Aug 30, 2022TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Aug 22, 2022RFNTREFUSAL PROCESSED BY IB—
Jul 29, 2022RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Jul 29, 2022RFRRREFUSAL PROCESSED BY MPU—
Jul 7, 2022RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Jul 6, 2022CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 13, 2022DOCKASSIGNED TO EXAMINER—
Oct 19, 2021MAFRAPPLICATION FILING RECEIPT MAILED—
Oct 13, 2021NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Oct 8, 2021SDRCSN ASSIGNED FOR SECT 66A SUBSEQ DESIG FROM IB—

Frequently asked questions

Related guidance