USPTO serial 79323477
Reviewed by CopyMark Law Group
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Leesa N. Weiss
Leesa N. Weiss Edell, Shapiro & Finnan, LLC9801 Washingtonian Blvd.Suite 750Gaithersburg, MD 20878| Class | Description | Status | First use |
|---|---|---|---|
| 006 | Base common metals and their alloys; metal materials for building construction, namely, building boards and cladding of metal for building; transportable houses of metal; non electric metal cables and wires; small metal objects, namely, metal nuts and metal springs; metal containers for storage and transport; offshore drilling platforms of metal | ACTIVE | — |
| 007 | Offshore windmills of metal; windmills of metal | ACTIVE | — |
| 009 | Devices and instruments for science in the nature of computers, research in the nature of computers, navigation in the nature of GPS receivers, geodesy in the nature of directional compasses, rangefinders, theodolites, tachymeters, levels in the nature of bubble levels and level indicators and photogrammetrical surveying instruments and appliances, optics in the nature of fiber optics and optical lenses; devices and instruments for controlling, distributing, transforming, accumulating, regulating or controlling the distribution or use of electricity in the nature of voltage regulators and capacitors; recorded and downloadable computer programs for engineering, procurement and construction (EPC) services and managing offshore and onshore installations; computers and computer peripheral devices; fire extinguishers | ACTIVE | — |
| 037 | Mining extraction, oil and gas drilling; construction, installation, maintenance and repair of wind turbines and wind turbines; consultancy services relating to the construction, installation, maintenance and repair of windmills and wind turbines; construction, installation, maintenance and repair of windmills, wind power plants, wind turbines and other wind-powered machinery; construction, installation, maintenance and repair of wind power plants and uninterruptable power supply installations; construction, installation, maintenance and repair of electronic monitoring equipment of wind power plants and power supply installations | ACTIVE | — |
| 040 | Treatment of materials in the nature of common metals and their allows by means of material processing, namely, obtaining metals from native earth materials; processing of fuel materials; waste recycling; air purification and water treatment; electricity production; gas production; processing of oil; oil refinery services | ACTIVE | — |
| 042 | Design and development of computers and computer programs; engineering services for upstream and downstream oil and gas operators, industrial companies and other technology companies; engineering services relating to windmills and electricity; engineering services related to solar energy; engineering services relating to carbon capture and storage; engineering services related to batteries and battery technology; engineering services related to hydropower; engineering services related to oil and gas extraction; engineering services related to wave power extraction; engineering services related to fish farming | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Mar 7, 2025 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Jun 26, 2023 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Jun 1, 2023 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Jun 1, 2023 | FIMP | FINAL DISPOSITION PROCESSED | — |
| May 28, 2023 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Feb 28, 2023 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Feb 28, 2023 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Dec 13, 2022 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Dec 13, 2022 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Dec 12, 2022 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Nov 23, 2022 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Nov 23, 2022 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Nov 23, 2022 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Nov 9, 2022 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Nov 9, 2022 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Nov 9, 2022 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Nov 9, 2022 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Nov 9, 2022 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Nov 2, 2022 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Nov 2, 2022 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Nov 2, 2022 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| May 25, 2022 | RFNT | REFUSAL PROCESSED BY IB | — |
| May 3, 2022 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| May 3, 2022 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Mar 22, 2022 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Mar 21, 2022 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Mar 19, 2022 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Mar 15, 2022 | DOCK | ASSIGNED TO EXAMINER | — |
| Oct 29, 2021 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Oct 25, 2021 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Oct 22, 2021 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |