Drawing for ARFLOW

USPTO serial 79323920

ARFLOW

Reviewed by CopyMark Law Group

Reg. 7095300Status 700Registered
Filing date
Status date
Registration date
Jul 4, 2023
Examiner
MMEJE, OBIEZE GINIKANWA
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with ARFLOW?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Maureen R. Smith

Maureen R. Smith Fitch, Even, Tabin & Flannery120 South LaSalle StreetSuite 2100Chicago, IL 60603

Goods and services

ClassDescriptionStatusFirst use
009Weighing apparatus and instruments; measuring apparatus and instruments, namely, weight measuring apparatus and flow measuring instruments; inspecting apparatus and instruments, namely, optical inspection apparatus, Electro-optical instruments for use in inspection and measurement of industrial components; numerical control apparatus, namely, electronic interface equipment for machine tools to input or output CNC (computer numerical control) data; electric control apparatus, namely, electronic apparatus for the remote control of industrial operations; control and regulating apparatus, namely, apparatus for regulating or controlling industrial operations; electrical controllers; electronic weight and flow controllers; industrial automation controls incorporating software; smart manufacturing system controls, namely, electronic control systems for machines; industrial automation controls; programmable logic controllers; electronic control instruments, namely, electronic control circuits for weighing apparatus and instruments and flow measuring and control instruments; electronic control systems for machines; downloadable software for controlling machinesACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Oct 24, 2023FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Oct 4, 2023FICSFINAL DISPOSITION NOTICE SENT TO IB—
Oct 4, 2023FIMPFINAL DISPOSITION PROCESSED—
Oct 4, 2023FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Aug 25, 2023EWAFTEAS WITHDRAWAL OF ATTORNEY RECEIVED-FIRM RETAINS—
Aug 25, 2023TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Aug 25, 2023ECDRTEAS CHANGE OF DOMESTIC REPRESENTATIVES ADDRESS—
Aug 25, 2023ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Aug 25, 2023REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Jul 4, 2023NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Jul 4, 2023R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Apr 19, 2023GPNXNOTIFICATION PROCESSED BY IB—
Apr 18, 2023NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Apr 18, 2023PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Apr 12, 2023OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Mar 29, 2023OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Mar 29, 2023OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Mar 29, 2023NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Mar 22, 2023OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Mar 22, 2023OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Mar 7, 2023PBCRWITHDRAWN FROM PUB - OG REVIEW QUERY—
Feb 19, 2023CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jan 18, 2023TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jan 17, 2023CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jan 17, 2023TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Aug 9, 2022RFNTREFUSAL PROCESSED BY IB—
Jul 21, 2022RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Jul 21, 2022RFRRREFUSAL PROCESSED BY MPU—
Jun 28, 2022RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Jun 27, 2022CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 13, 2022DOCKASSIGNED TO EXAMINER—
Oct 29, 2021MAFRAPPLICATION FILING RECEIPT MAILED—
Oct 25, 2021NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Oct 23, 2021REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance