Drawing for PREMAS

USPTO serial 79324155

PREMAS

Reviewed by CopyMark Law Group

Reg. 7301319Status 700Registered
Filing date
Status date
Registration date
Feb 13, 2024
Examiner
TWOHIG, SHANNON MARIE
Law office
TMO LAW OFFICE 121

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with PREMAS?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Ann Lamport Hammitte

Ann Lamport Hammitte Lando & Anastasi, LLP60 State Street, 23rd FloorBoston, MA 02109UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
009downloadable software for scheduling and planning the maintenance of industrial machinery; downloadable artificial intelligence software and automatic learning software for scheduling and planning the maintenance of industrial machinery; downloadable software for digitizing industrial production; downloadable application software for scheduling and planning the maintenance of industrial machinery; downloadable software for digital networking of industrial production; apparatus and instruments and structural parts therefor for recording, transmission, storage, reproduction or processing of images or data; computer hardware and structural parts therefor for electronic data processing; industrial controls and control systems with embedded software; surveying, optical, weighing, measuring, signaling, detecting and monitoring devices and instruments, namely, electronic devices and instruments in the nature of speed, electrical, mechanical, temperature and performance detectors for detecting and monitoring the function and status of industrial machinery componentsACTIVE—
037Installation, cleaning, repair and maintenance work, upgrading and conversion of machines; providing advice and information in the field of repair of equipment used for scheduling and planning the maintenance of industrial machineryACTIVE—
041Educational services, namely, providing classes in the field of scheduling and planning the maintenance of industrial machinery; training services in the field of scheduling and planning the maintenance of industrial machinery; conducting of training for the industrial sector in the field of scheduling and planning the maintenance of industrial machineryACTIVE—
042technical advice with respect to data processing related to future projects on the complete digitization of industrial production, namely, scientific advice on the digitization of industrial production and scientific advice on the digital networking of industrial production; drafting of technical reports, namely, drafting of plans and engineering drawings for others in the field of maintenance of industrial machinery; scientific research and development services in the field of engineering; technological consulting services in the field of digitization of documents for future projects regarding scheduling and planning the maintenance of industrial machinery; checking of materials, namely, detection of unauthorized access and monitoring the function and status of industrial machinery components to ensure proper functioning; performance of chemical and physical analyses, namely, monitoring the function and status of industrial machinery components; conducting technological analyses, namely technological advisory services relating to machine engineering analysis; providing scientific information on technological aspects of scheduling and planning the maintenance of industrial machinery; scientific and industrial research in the field of scheduling and planning the maintenance of industrial machinery; development, programming and implementation of software; programming of electronic control systems; design, development and programming of software, in particular process management software; hosting services in the nature of hosting software for scheduling and planning the maintenance of industrial machinery, Software as a Service (SaaS) featuring software for scheduling and planning the maintenance of industrial machinery and rental of software for scheduling and planning the maintenance of industrial machinery; design and development of computer hardware architectureACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
May 16, 2025ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB—
Jun 3, 2024IRFIIRREGULARITY ON FINAL DECISION RECEIVED FROM IB—
May 14, 2024XXSSGENERIC MADRID TRANSACTION SENT TO IB—
May 14, 2024XXCRGENERIC MADRID TRANSACTION CREATED—
May 13, 2024FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Feb 13, 2024NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Feb 13, 2024R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Nov 28, 2023NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Nov 28, 2023PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Nov 27, 2023GPNXNOTIFICATION PROCESSED BY IB—
Nov 8, 2023OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Nov 8, 2023OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Nov 8, 2023NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Oct 26, 2023CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Oct 24, 2023XAECEXAMINER'S AMENDMENT ENTERED—
Oct 24, 2023GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Oct 24, 2023GNEAEXAMINERS AMENDMENT E-MAILED—
Oct 24, 2023CNEAEXAMINERS AMENDMENT -WRITTEN—
Oct 5, 2023RDX3NOTIFICATION FOR REQ FOR RECON DENIED NO APPEAL FILED—
Oct 5, 2023RDX1ACTION FOR REQ FOR RECON DENIED NO APPEAL FILED E-MAILED—
Oct 5, 2023RRDXACTION REQ FOR RECON DENIED NO APPEAL FILED COUNTED NOT MAILED—
Sep 2, 2023TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Sep 1, 2023CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Sep 1, 2023ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
May 23, 2023GNFNNOTIFICATION OF FINAL REFUSAL EMAILED—
May 23, 2023GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
May 23, 2023CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
May 3, 2023TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
May 2, 2023CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
May 2, 2023TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Apr 18, 2023OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Mar 29, 2023OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Mar 29, 2023OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Feb 7, 2023RFNPREFUSAL PROCESSED BY IB—
Jan 13, 2023GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 13, 2023GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 13, 2023CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 6, 2023LIMELIMITATION FROM THE IB - REQUEST EXAM REVIEW—
Sep 3, 2022LIMGLIMITATION OF GOODS RECEIVED FROM IB—
Jul 15, 2022DOCKASSIGNED TO EXAMINER—
Jun 22, 2022GNS3NOTIFICATION OF LETTER OF SUSPENSION E-MAILED—
Jun 22, 2022GNSLLETTER OF SUSPENSION E-MAILED—
Jun 22, 2022CNSLSUSPENSION LETTER WRITTEN—
Jun 10, 2022TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jun 10, 2022CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jun 10, 2022TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
May 4, 2022CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED—
May 4, 2022TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
May 4, 2022ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
May 4, 2022REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
May 4, 2022COARTEAS CHANGE OF OWNER ADDRESS RECEIVED—
Feb 14, 2022RFNTREFUSAL PROCESSED BY IB—
Jan 27, 2022RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Jan 27, 2022RFRRREFUSAL PROCESSED BY MPU—
Jan 27, 2022RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Jan 26, 2022CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 20, 2022DOCKASSIGNED TO EXAMINER—
Nov 5, 2021MAFRAPPLICATION FILING RECEIPT MAILED—
Nov 1, 2021NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Oct 28, 2021REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance