Drawing for MOLDMIND

USPTO serial 79324390

MOLDMIND

Reviewed by CopyMark Law Group

Reg. 6891469Status 700Registered
Filing date
Status date
Registration date
Nov 8, 2022
Examiner
CASTRO, GIANCARLO
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with MOLDMIND?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Alison M. Caless

Alison M. Caless CANTOR COLBURN LLP20 Church StreetFloor 22Hartford, CT 06103

Goods and services

ClassDescriptionStatusFirst use
007Hot forming machines for plastic materials, parts and fittings therefor; spray nozzles being parts of machines; injection moulding machines and moulds (machine parts) for injection moulding; plastic and resin injection moulding machines, plastics moulding machines; plastic processing machines; injection moulding and hot runner tools for use in injection moulding machines; control mechanisms for machines, namely, for hot runner systems for plastic injection moulding machines; hot runner systems for injection moulding tools for injection moulding machines, mainly consisting of sealing needles, pistons, cylinders, nozzles, hot runner distributors, feed bushes; injector die halves for mechanical injection moulding tools for injection moulding machines; replacement parts [machine parts] for hot runner systems and nozzles for plastic injection moulding machines; nozzles (parts of machines) for plastic injection moulding machines; parts and fittings for plastic moulding machines and plastic injection moulding machines, namely, nozzles, control apparatus, regulators and distributors; valves [parts of machines]; clack valves [machine parts]; thermic lances [machine parts]; moulds for processing plastics; machine tools and power tools; motors and engines and propulsion mechanisms, other than for land vehicles; machine coupling and transmission components (except for land vehicles)ACTIVE—
009Parts of plastic injection moulding machines, namely, monitoring apparatus for counting cycles, recording and analyzing process data, triggering warning signals, stopping plastic injection moulding machines, providing of maintenance information, process optimisation and tracking the activity of plastic injection moulding machines and moulds; electronic monitoring apparatus for counting cycles, recording and analysing process data, triggering warning signals, stopping plastic injection moulding machines, providing of maintenance information, process optimisation and tracking the activity of injection moulding machines and moulds; electronic temperature-regulating apparatus for hot nozzle systems; electronic control apparatus for injection moulding machines; heat regulating apparatus consisting of thermostats and components for controlling and monitoring temperatures for use with injection molds and injection molding processes; temperature control apparatus for injection molds and injection molding processes; temperature sensors; computer hardware; recorded and downloadable computer software for use to counting cycles, recording and analyzing process data, triggering warning signals, stopping plastic injection moulding machines, providing of maintenance information, process optimisation and tracking the activity of plastic injection moulding machines and moulds; recorded and downloadable database management computer software; recorded and downloadable computer application software for mobile phones, namely, software for controlling and monitoring temperatures for use with injection molds and injection molding processes; data processing apparatus; recorded and downloadable data processing computer programsACTIVE—
037Installation, maintenance and repair of hot pressing machines, injection moulding machines, plastic and resin injection moulding machines, plastic moulding machines, plastic processing machines and parts and fittings therefor; Installation, maintenance and repair of injection moulding and hot runner tools for use in injection moulding machines, hot runner systems for injection moulding tools for injection moulding machines, motors and engines and parts and fittings therefor; Installation, maintenance and repair of couplings and machine transmission components, regulating units, electronic control units, electronic control systems, electronic temperature regulating apparatus for hot runner systems, electronic control apparatus for injection moulding machines, heat control apparatus and temperature control apparatus and parts and fittings thereforACTIVE—
042Technical consultancy, design, research and development in the field of hot pressing machines for plastics, injection moulding machines, plastic and resin injection moulding machines, plastic moulding machines, plastic processing machines and parts and fittings therefor; technical consultancy, design, research and development in the field of injection moulding and hot runner tools for use in injection moulding machines, hot runner systems for injection moulding tools for injection moulding machines, motors and engines and parts and fittings therefor; technical consultancy, design, research and development in the field of couplings and machine transmission components, regulating units, electronic control units, electronic control systems, electronic temperature regulating apparatus for hot runner systems, electronic control apparatus for injection moulding machines, heat control apparatus, temperature control apparatus and parts and fittings therefor; technical project studies; services in the field of engineering consultancy, testing and technical support in connection with the construction, operation and process optimisation of hot runner systems for plastic injection moulding machines, parts and fittings therefor and regulators for hot runner systems for plastic injection moulding machines; cloud computing; providing temporary use of non-downloadable software applications for using cloud computing networks, and for access thereto; rental of operating software for using cloud computing networks and for access theretoACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Dec 4, 2025NREPNEW REPRESENTATIVE AT IB RECEIVED—
Nov 30, 2023TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Nov 30, 2023ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Nov 30, 2023REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Nov 30, 2023CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED—
Nov 30, 2023COARTEAS CHANGE OF OWNER ADDRESS RECEIVED—
Mar 29, 2023FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Mar 3, 2023FICSFINAL DISPOSITION NOTICE SENT TO IB—
Mar 3, 2023FIMPFINAL DISPOSITION PROCESSED—
Feb 8, 2023FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Dec 18, 2022NREPNEW REPRESENTATIVE AT IB RECEIVED—
Nov 8, 2022NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Nov 8, 2022R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Aug 23, 2022GPNXNOTIFICATION PROCESSED BY IB—
Aug 23, 2022NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Aug 23, 2022PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Aug 3, 2022OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Aug 3, 2022OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Aug 3, 2022NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Jul 12, 2022PBCRWITHDRAWN FROM PUB - OG REVIEW QUERY—
Jun 23, 2022CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jun 23, 2022TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jun 23, 2022CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jun 23, 2022TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jun 22, 2022RFNTREFUSAL PROCESSED BY IB—
Jun 10, 2022NREPNEW REPRESENTATIVE AT IB RECEIVED—
May 25, 2022RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
May 24, 2022RFRRREFUSAL PROCESSED BY MPU—
Apr 20, 2022RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Apr 19, 2022CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 11, 2022DOCKASSIGNED TO EXAMINER—
Feb 12, 2022NREPNEW REPRESENTATIVE AT IB RECEIVED—
Nov 9, 2021MAFRAPPLICATION FILING RECEIPT MAILED—
Nov 5, 2021NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Oct 28, 2021REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance