USPTO serial 79324893
Reviewed by CopyMark Law Group
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
William C. Wright
William C. Wright Epstein Drangel LLP60 East 42nd Street, Suite 1250New York, NY 10165UNITED STATES| Class | Description | Status | First use |
|---|---|---|---|
| 009 | Recorded or downloadable media, namely, downloadable electronic publications in the nature of magazines and written articles featuring construction managing and planning; downloadable electronic publications in the nature of books, reviews being written articles and downloadable videos, written articles, abstracts being written articles and data files in the field of hydraulic engineering, maritime engineering, rock engineering and geomechanical engineering; downloadable electronic data files featuring construction design, construction planning, geomechanical or hydraulic modeling; electronic data files recorded on computer media featuring construction design and planning; electronic data files recorded on computer media featuring geomechanical or hydraulic modeling; computers and computer peripherals; recorded or downloadable software for planning construction projects, for managing hydraulic projects and geomechanical engineering projects; downloadable or recorded application software for planning construction projects, for managing hydraulic projects and geomechanical engineering projects; downloadable or recorded two or three-dimensional simulation software for the design and the development of industrial products; downloadable or recorded industrial process control software for controlling construction projects; downloadable or recorded software for diagnostics and troubleshooting for troubleshooting hydraulic and rock mechanics construction projects, for diagnosing issues with computer networks, for diagnosing issues with hydraulics and rock mechanics; downloadable or recorded computer operating software; downloadable or recorded interactive software for construction management; downloadable or recorded interactive software for managing hydraulic projects and geomechanical engineering projects; downloadable or recorded software for use in automating and managing business processes in the nature of automating manufacturing machines and automating process control systems in the field of hydraulic and geomechanics engineering | ACTIVE | — |
| 042 | Scientific and technological services, namely, engineering services, hydraulic and geomechanical engineering services, technical computer modeling services, as well as research and design services relating thereto, namely, scientific research, technical research in the field of hydraulic and geo-mechanics, geo-mechanical research, research in the fields of fluid mechanics, scientific computer software design, hydraulic and geomechanic modeling design; civil engineering; civil engineering in the nature of hydraulic engineering, of rock mechanics and geomechanical engineering and maritime engineering; technical project studies in the field of construction, namely, construction drafting, construction material testing; computer modeling hydraulic and geomechanical construction environment; providing hydraulic and rock mechanics calculations and simulations; construction work planning, namely, construction drafting; monitoring of erosion and sedimentation; surveying being engineering work; industrial analysis and industrial research services, namely, industrial research in the field of computer software, analyzing computer software; design and development of computers and software; design and development of computer hardware and software for industrial applications; design, development, maintenance and updating of process control software; design, development, maintenance and updating of data processing software; design and development of energy management software; design and development of software for evaluation and calculation of data; design and development of computer software and hardware for producing, recording and processing digital and analog signals; development and testing of computing methods, algorithms and software; rental and updating of data processing software; rental of computer programs and software | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Nov 25, 2023 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| May 23, 2023 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| May 2, 2023 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| May 2, 2023 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Apr 24, 2023 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Jan 24, 2023 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Jan 24, 2023 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Nov 8, 2022 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Nov 8, 2022 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Oct 19, 2022 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Oct 5, 2022 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Oct 5, 2022 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Oct 5, 2022 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Oct 5, 2022 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Oct 5, 2022 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Sep 14, 2022 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Sep 14, 2022 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Sep 14, 2022 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| May 30, 2022 | RFNT | REFUSAL PROCESSED BY IB | — |
| May 10, 2022 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| May 10, 2022 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Mar 29, 2022 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Mar 28, 2022 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Mar 25, 2022 | DOCK | ASSIGNED TO EXAMINER | — |
| Mar 3, 2022 | CORR | CORRECTION FROM IB ENTERED - NO REVIEW REQUIRED | — |
| Dec 25, 2021 | CRCV | CORRECTION TRANSACTION RECEIVED FROM IB | — |
| Nov 12, 2021 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Nov 8, 2021 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Nov 4, 2021 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |