Drawing for KRAFTWERK LIVING TECHNOLOGIES

USPTO serial 79325219

KRAFTWERK LIVING TECHNOLOGIES

Reviewed by CopyMark Law Group

Reg. 7039066Status 700Registered
Filing date
Status date
Registration date
May 2, 2023
Examiner
EINSTEIN, MATTHEW T
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with KRAFTWERK LIVING TECHNOLOGIES?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

SARA M. DORCHAK

SARA M. DORCHAK COLLARD & ROE, PC1077 NORTHERN BOULEVARDROSLYN, NY 11576UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
0093D spectacles; display screen filters adapted for use with televisions; backlit signs; picture projectors; flat panel display screens; recorded computer programmes for image processing; recorded computer programs for editing images, sound and video; recorded computer software for controlling the operation of audio and video devices; recorded computer software for organizing and viewing digital images and photographs; digital video players; remote control apparatus, namely, remote controls for AV Systems; projection screens; flight simulators; apparatus for the reproduction of images; loudspeakers; loudspeakers with built in amplifiers; loudspeaker systems; cabinets for loudspeakers; light emitting diode (LED) monitors; light emitting diode displays; multimedia apparatus and instruments, namely, multimedia projectors; remote controls for multimedia systems; multimedia projectors; projection apparatus for large scale video projection, namely, panorama projection, blended multiple projector projection, edge blended projection, warped and blended projection; multimedia projectors for the entertainment industry; stage lighting regulators; instrumentation simulators, namely, amusement simulators for the steering and control of vehicles, planes, spacecrafts, ships and submarines; simulators for the steering and control of vehicles; electronic controllers for vehicles, planes, spacecrafts, ships and submarines; programmable logic controllers; programmable control apparatus, namely, programmable electronic controls for amusement simulators; electric control apparatus, namely, electronic controllers; electronic integrated control systems for use in the field of amusement attractions; recorded software for the control of stage lighting apparatus and instruments; seat controls, namely, electronic controllers for controlling seats and chairs; video imaging systems comprised of AV multimedia projectors, large format LED displays; virtual reality (VR) motion simulators; virtual reality hardware, namely, headsets for virtual reality games, virtual reality glasses; virtual reality (VR) cinemas, namely, Virtual reality headsets adapted for use in playing video games or for amusement purposes; recorded virtual reality software for simulation; multimedia and special effect apparatus comprised primarily of computer hardware and also including audio playback devices, air sprayer devices, and water sprayer devices for visual, acoustic, tactile and olfactory special effects in the nature of scent, smell, taste, feel; virtual reality hardware in the nature of motion simulating seats for 2D, 3D, 4D and 5D cinematographic films with integrated visual, acoustic, tactile and olfactory special effect apparatusACTIVE—
037Installation, repair, maintenance, and assembly services relating to the installation of technical equipment for cinemas, motion simulation cinemas, theatre, events and event facilities, exhibitions and museums, entertainment centres, leisure and theme parks, shopping centres, water parks, training centres, seminars, concerts, stages and showrooms; film projector repair and maintenance; installation, assembly and maintenance of event technology, namely, light, sound, audio, video and laser technology and multimedia installations; installation, repair, maintenance, and assembly services relating to the installation of control systems for lighting, audio and video installations, laser technology, water effect installations, multimedia installations, 2D, 3D, 4D and 5D seats; installation, repair, maintenance, and assembly services relating to the installation of lighting systems, namely, light technology, laser technology, strobe lighting, fibreoptic lighting, black light lighting for architectural lighting, cinemas, motion simulation cinemas, theatre, events and event facilities, exhibitions and museums, entertainment centres, leisure and theme parks, shopping centres, water parks, training centres, seminars, concerts, stages and showrooms; installation, repair, maintenance, and assembly services relating to the installation of apparatus, devices, equipment and installations for multimedia special effects, namely, visual, acoustic, tactile and olfactory special effects; construction and assembly services relating to the installation of stage and event scenery and apparatus, and equipment, motors and engines and transmissions for event, stage, hall and studio technology, in particular, namely, chain hoists, curtain installations, lighting apparatus and installationsACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Aug 28, 2023FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Aug 8, 2023FICSFINAL DISPOSITION NOTICE SENT TO IB—
Aug 7, 2023FIMPFINAL DISPOSITION PROCESSED—
Aug 2, 2023FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
May 2, 2023NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
May 2, 2023R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
May 1, 2023OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Apr 12, 2023OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Apr 12, 2023OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Feb 14, 2023NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Feb 14, 2023GPNXNOTIFICATION PROCESSED BY IB—
Feb 14, 2023PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jan 25, 2023OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Jan 25, 2023OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Jan 25, 2023NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Jan 11, 2023PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Jan 4, 2023ALIEASSIGNED TO LIE—
Dec 12, 2022CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Dec 9, 2022XAECEXAMINER'S AMENDMENT ENTERED—
Dec 9, 2022GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Dec 9, 2022GNEAEXAMINERS AMENDMENT E-MAILED—
Dec 9, 2022CNEAEXAMINERS AMENDMENT -WRITTEN—
Dec 5, 2022ZZZXPREVIOUS ALLOWANCE COUNT WITHDRAWN—
Nov 22, 2022PBCRWITHDRAWN FROM PUB - OG REVIEW QUERY—
Nov 7, 2022CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Nov 7, 2022XAECEXAMINER'S AMENDMENT ENTERED—
Nov 7, 2022GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Nov 7, 2022GNEAEXAMINERS AMENDMENT E-MAILED—
Nov 7, 2022CNEAEXAMINERS AMENDMENT -WRITTEN—
Oct 31, 2022RDX3NOTIFICATION FOR REQ FOR RECON DENIED NO APPEAL FILED—
Oct 31, 2022RDX1ACTION FOR REQ FOR RECON DENIED NO APPEAL FILED E-MAILED—
Oct 31, 2022RRDXACTION REQ FOR RECON DENIED NO APPEAL FILED COUNTED NOT MAILED—
Oct 17, 2022TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Oct 17, 2022CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Oct 17, 2022ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
Sep 27, 2022GNFNNOTIFICATION OF FINAL REFUSAL EMAILED—
Sep 27, 2022GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Sep 27, 2022CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Aug 30, 2022TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Aug 29, 2022CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Aug 29, 2022TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jul 5, 2022RFNTREFUSAL PROCESSED BY IB—
Jun 13, 2022RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Jun 13, 2022RFRRREFUSAL PROCESSED BY MPU—
Jun 11, 2022RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Jun 10, 2022CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 6, 2022DOCKASSIGNED TO EXAMINER—
Nov 16, 2021MAFRAPPLICATION FILING RECEIPT MAILED—
Nov 12, 2021NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Nov 11, 2021REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance