Drawing for VIBRACOUSTIC

USPTO serial 79325823

VIBRACOUSTIC

Reviewed by CopyMark Law Group

Reg. 7416081Status 700Registered
Filing date
Status date
Registration date
Jun 18, 2024
Examiner
FURDA, MICHAEL
Law office
FILE REPOSITORY (FRANCONIA)

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with VIBRACOUSTIC?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Richard M. LaBarge

Richard M. LaBarge Marshall, Gerstein & Borun LLP233 S. Wacker DriveSuite 6300Chicago, IL 60606

Goods and services

ClassDescriptionStatusFirst use
007Roller bearings for machines; bearing housings for machines; bearing brackets for machines; bushing for use as parts of machines; workpiece carrier being parts of anti-vibration mounts for machines; exhaust silencer for engines; exhaust systems for vehicles comprised of pipes, collector and muffler; mounting hangers adapted for exhaust systems for internal combustion engines; drive pulleys being parts of machines; bearing blocks for machines; bearing brackets for roller bearing; bearing bracket for ball bearings for use in machines; dampers being machines parts; machine parts, namely, actuators for dampers; machine parts, namely, bearing inserts; springs being parts of anti-vibration mountings for machines; drive shafts other than for land vehicles; engine rods for machines and engines; engine mounts other than for land vehiclesACTIVE—
009Steering apparatus, automatic, for vehicles, namely, computer hardware and downloadable operational software for steering vehicles; simulators for the steering and control of vehicle; signalling apparatus, namely, electric linear actuators for generating vibration signals; electrical signalling attenuators; electronic measurement sensors for measuring height and angle for levelling of vehicle suspension systems, for measuring acceleration and for measuring pressure, angle, temperature, force, and distance, namely, acceleration sensors, pressure sensors, angle measurement sensors, temperature measurement sensors, force measurement sensors, and distance measurement sensors; switching apparatus for the distribution or use of electric current; Electromagnetic solenoid switching valves for air springs; downloadable adaptive software for use in noise, vibration and harshness technology; downloadable software for vehicle control; downloadable software for noise cancellation; computer hardware; electronic control systems for machines; integrated electronic safety systems for land vehicles comprised of electronic proximity sensors and switches, cameras, integrated circuits for the purpose of imaging processing, and display monitorsACTIVE—
012Vehicle suspension springs; Air suspension springs for land vehicles; shock absorbing springs for motorized vehicles; combined spring and shock absorber units for vehicles; shock absorbers as parts of the vehicle parts suspension or the cab suspension; steering units for land vehicles; torsion dampers for vehicles; hydraulic rotary dampers for vehicles; coil springs for land vehicle suspension; wheel bearings for land vehicles, engines for land vehicles, transmissions for land vehicles, chassis for land vehicles, aggregate bearings for land vehicles, namely, spring bearings for land vehicles; drive shafts for land vehicles; torque converters for land vehicles; bumpers for vehicles; engine mounts for land vehicles; structural replacement parts and fittings for land vehicles; vehicle axle assemblies; axle bearing for land vehicle; axles for air suspension systems in vehicles; parts of land vehicles, namely, jounce bumpersACTIVE—
042Material testing and analysing; computer programming services for commercial analysis and reporting; technological engineering analysis, namely in the field of noise, vibration and harshness technology; technological advisory services relating to machine engineering analysis; analysis and evaluation of product design; analysis and evaluation of product development; computer hardware and software design services; analysis and testing services relating to electrical engineering apparatus; testing, analysis and evaluation of the goods and services of others to determine conformity with certification standards; design and development of computer software for vehicle simulations; Quality control certification services, namely, testing, analysis and evaluation of the goods and services of others to determine conformity with certification standards; Product quality testing services to determine conformity with certification standards; measurement services, namely, measurement evaluations in the field of automotive suspension and automotive noise, vibration, and harshness; software engineering services; mechanical engineering; engineering services in the field of noise, vibration and harshness technology; design and development of engineering products; research and development services in the field of engineering; software development in the field of noise, vibration and harshness technology; product development; product research and development services; computer-aided engineering design servicesACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Dec 14, 2024FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Nov 22, 2024FICSFINAL DISPOSITION NOTICE SENT TO IB—
Nov 22, 2024FIMPFINAL DISPOSITION PROCESSED—
Oct 11, 2024ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB—
Sep 18, 2024FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Jul 8, 2024GPNXNOTIFICATION PROCESSED BY IB—
Jun 18, 2024NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Jun 18, 2024R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Apr 2, 2024NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Apr 2, 2024PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Mar 20, 2024OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Mar 20, 2024OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Mar 13, 2024NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Feb 22, 2024CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Feb 20, 2024TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Feb 20, 2024CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Feb 20, 2024TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Feb 12, 2024GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 12, 2024GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 12, 2024CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 31, 2024ZZZXPREVIOUS ALLOWANCE COUNT WITHDRAWN—
Jan 23, 2024PBCRWITHDRAWN FROM PUB - OG REVIEW QUERY—
Aug 3, 2023CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Aug 3, 2023XAECEXAMINER'S AMENDMENT ENTERED—
Aug 3, 2023GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Aug 3, 2023GNEAEXAMINERS AMENDMENT E-MAILED—
Aug 3, 2023CNEAEXAMINERS AMENDMENT -WRITTEN—
Aug 1, 2023ZZZXPREVIOUS ALLOWANCE COUNT WITHDRAWN—
Jun 25, 2023GPNXNOTIFICATION PROCESSED BY IB—
Jun 7, 2023OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Jun 7, 2023PBCRWITHDRAWN FROM PUB - OG REVIEW QUERY—
Jun 7, 2023OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Jun 7, 2023NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
May 19, 2023CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
May 19, 2023XAECEXAMINER'S AMENDMENT ENTERED—
May 19, 2023GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
May 19, 2023GNEAEXAMINERS AMENDMENT E-MAILED—
May 19, 2023CNEAEXAMINERS AMENDMENT -WRITTEN—
May 9, 2023OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Apr 19, 2023OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Apr 19, 2023TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Apr 19, 2023CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Apr 19, 2023ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
Apr 19, 2023OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Mar 5, 2023GNFNNOTIFICATION OF FINAL REFUSAL EMAILED—
Mar 5, 2023GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Mar 5, 2023CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Nov 29, 2022TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Nov 28, 2022CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Nov 28, 2022TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jul 19, 2022CRMLCORRESPONDENCE MAILED—
Jul 8, 2022TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jul 8, 2022CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jul 8, 2022TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jun 2, 2022CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 30, 2022RFNTREFUSAL PROCESSED BY IB—
Jan 13, 2022RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Jan 13, 2022RFRRREFUSAL PROCESSED BY MPU—
Dec 22, 2021RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Dec 21, 2021CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 17, 2021DOCKASSIGNED TO EXAMINER—
Nov 23, 2021MAFRAPPLICATION FILING RECEIPT MAILED—
Nov 19, 2021NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Nov 18, 2021REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance