USPTO serial 79326235
Reviewed by CopyMark Law Group
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
James R. Robinson
James R. Robinson Robinson Law Office, PLLC13 Loyola DriveHot Springs Village, AR 71909United States| Class | Description | Status | First use |
|---|---|---|---|
| 004 | Electrical energy; electrical energy produced from solar energy; electrical energy produced from renewable sources | ACTIVE | — |
| 009 | Photovoltaic energy accumulators; electricity storage apparatus, namely, electrical storage batteries, accumulators, electrical cells and batteries; photovoltaic apparatus and installations, namely, photovoltaic cells and modules, photovoltaic solar panels and photovoltaic inverters for solar electricity production; scientific apparatus and instruments, namely, electronic sensors for measuring solar radiation, prisms for scientific purposes, spectrometers, UV radiometers; apparatus and instruments for conducting electricity, namely, electric conductors, electricity conduits; photovoltaic apparatus, namely, photovoltaic cells and modules, photovoltaic solar panels and photovoltaic inverters for electricity production; photovoltaic apparatus, namely, photovoltaic cells and modules, photovoltaic solar panels and photovoltaic inverters for converting solar radiation to electrical energy; apparatus for measuring, monitoring and analyzing electricity consumption, namely, electricity meters, electrical energy utilization metering devices; downloadable computer application software for mobile phones, namely, software for use in database management and in electronic storage of data in the field of energetic consumption monitoring; batteries; electric cables; solar energy collectors, namely, solar cells, solar batteries and solar panels, all for electricity generation; calibrated photovoltaic reference cells; photovoltaic cells; solar cells; solar cells for the production of electricity; counters, namely, scintillation counters, Geiger counters; electric control devices for heating management; sets of solar panels for electricity generation; data processing equipment; photovoltaic installations, namely, photovoltaic cells and modules, photovoltaic solar panels and photovoltaic inverters; photovoltaic inverters; downloadable computer software for database management in the field of energetic consumption monitoring; downloadable computer software for authorizing access to databases in the field of energetic consumption monitoring; photovoltaic modules; photovoltaic solar modules for production of electricity; apparatus for converting electronic radiation to electrical energy, namely, photovoltaic solar modules; solar panels for the production of electricity; portable solar panels for generating electricity; solar panels for electricity production; electric control panels | ACTIVE | — |
| 037 | Maintenance of apparatus and installations for electric energy production; installation of electric energy production apparatus; installation of photovoltaic cells and modules; installation of solar energy systems; installation and maintenance of photovoltaic installations; maintenance and repair of energy generating installations; maintenance, repair and reconditioning of photovoltaic installations and apparatus; repair of apparatus and installations for electric energy production; repair of energy supply installations; servicing of apparatus and installations for electric energy production | ACTIVE | — |
| 039 | Distribution of energy; distribution of renewable energy; public utility services in the nature of electricity storage; electricity distribution | ACTIVE | — |
| 040 | Generation of electricity; Generation of electricity from solar energy; production of energy; production of electrical energy from renewable sources | ACTIVE | — |
| 042 | Energy auditing; design and development of photovoltaic systems; design and development of software for adjusting and controlling solar energy systems; design and development of systems for regenerative energy production; design and development of energy management software; advice related to energy saving, namely, consulting services in the fields of energy measurement to improve energy efficiency; product development, namely, development of energy and power management systems; provision of information regarding scientific feasibility studies and scientific research on the use of natural energy; technical consultancy in connection with energy-saving measures, namely, technical consulting services in the fields of energy measurement to improve energy efficiency; programming of energy management software for others; conducting scientific feasibility studies and scientific research related to the use of natural energy; technological consultancy services in the field of alternative energy production | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| May 28, 2026 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| May 11, 2026 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| May 11, 2026 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Feb 4, 2026 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Nov 4, 2025 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Nov 4, 2025 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Oct 8, 2025 | ETOP | EXTENSION OF TIME TO OPPOSE PROCESS - TERMINATED | — |
| Aug 27, 2025 | ETOF | EXTENSION OF TIME TO OPPOSE RECEIVED | — |
| Jul 29, 2025 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Jul 29, 2025 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jul 23, 2025 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Jun 24, 2025 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jun 19, 2025 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jun 19, 2025 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jun 19, 2025 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Dec 19, 2024 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Dec 19, 2024 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Dec 19, 2024 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Nov 4, 2024 | RCSC | REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED | — |
| Oct 8, 2024 | RCCK | SUSPENSION CHECKED - TO ATTORNEY FOR ACTION | — |
| Nov 21, 2023 | RCSC | REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED | — |
| May 9, 2023 | OPNX | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB | — |
| Apr 19, 2023 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Apr 19, 2023 | OPNR | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | — |
| Apr 18, 2023 | GNS3 | NOTIFICATION OF LETTER OF SUSPENSION E-MAILED | — |
| Apr 18, 2023 | GNSL | LETTER OF SUSPENSION E-MAILED | — |
| Apr 18, 2023 | CNSL | SUSPENSION LETTER WRITTEN | — |
| Mar 18, 2023 | RCCK | SUSPENSION CHECKED - TO ATTORNEY FOR ACTION | — |
| Jul 26, 2022 | GNS3 | NOTIFICATION OF LETTER OF SUSPENSION E-MAILED | — |
| Jul 26, 2022 | GNSL | LETTER OF SUSPENSION E-MAILED | — |
| Jul 26, 2022 | CNSL | SUSPENSION LETTER WRITTEN | — |
| Jun 28, 2022 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jun 28, 2022 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jun 28, 2022 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Apr 18, 2022 | RFNT | REFUSAL PROCESSED BY IB | — |
| Mar 31, 2022 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Mar 31, 2022 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Mar 4, 2022 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Mar 3, 2022 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Feb 25, 2022 | DOCK | ASSIGNED TO EXAMINER | — |
| Nov 26, 2021 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Nov 22, 2021 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Nov 18, 2021 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |