USPTO serial 79326539
Reviewed by CopyMark Law Group
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Mark E. Olds
Mark E. Olds Muncy, Geissler, Olds & Lowe, P.C.125 S Royal StreetAlexandria, VA 22314UNITED STATES| Class | Description | Status | First use |
|---|---|---|---|
| 017 | Insulation and barrier articles and materials, namely, insulating materials, laminated vapor barrier; Seals, sealants and fillers, namely, sealing and insulating materials, caulking materials; sealing and insulating materials; Fire resistant and fire preventive insulating materials; insulating refractory materials; insulating materials made of plastics; insulating materials made of polyurethane foam; insulating materials made of polyethylene foam; thermal insulation articles and materials; insulating materials; insulating materials for building; pipe jackets, not of metal; pipe muffs, not of metal; insulation jackets for industrial pipes; expansion joint fillers; thermal insulating materials; soundproofing materials; pipe gaskets; pipe joint sealants; caulking compounds; substances for insulating buildings against moisture; insulators for railway tracks; waterproof sealants; floating anti-pollution barriers; semi-worked plastic substances; plastics in extruded form for use in manufacture; extruded plastics in the form of sheets for use in manufacture; Adhesive tapes, strips, bands and films, for industrial and commercial use; Electrical insulation materials; insulating materials for snow storage | ACTIVE | — |
| 019 | Building and construction materials and elements, not of metal, namely, composite insulated panels composed primarily of extruded polystyrene for floors, roofs, walls, footings, groundworks, ventilated foundations, plumbing channels, yards, roads, railway tracks, and underground utilities for building and construction purposes; Building and construction materials and elements, not of metal, namely, composite insulated panels composed primarily of expanded polystyrene for floors, roofs, walls, footings, groundworks, ventilated foundations, plumbing channels, yards, roads, railway tracks, and underground utilities for building and construction purposes; Building and construction materials and elements, not of metal, namely, composite insulated panels composed primarily of polyurethane for floors, roofs, walls, footings, groundworks, ventilated foundations, plumbing channels, yards, roads, railway tracks, and underground utilities for building and construction purposes; Non-metal shelter structures and transportable buildings; building panels, not of metal; fired refractory materials, not of metal; Materials for making and coating roads, namely, construction materials composed primarily of extruded polystyrene for preventing the effects of ground frost; Materials for making and coating roads, namely, construction materials composed primarily of expanded polystyrene for preventing the effects of ground frost; geotextiles | ACTIVE | — |
| 037 | Building construction, road construction, railway tracks construction, and underground utilities construction; advisory services relating to building construction; basement waterproofing; Construction services, namely, construction of facilities, areas and fields for winter sports; building construction and repair; building maintenance and repair; consultancy and information services relating to construction; Damp-proofing services; excavation services; installation of thermal insulation for buildings; installation of insulating materials in buildings, roofs and structures; Insulating of buildings in the nature of installation of building insulation; artificial snow-making services; Insulation services, namely, installation of insulation materials for winter sports facilities, areas and fields | ACTIVE | — |
| 039 | Snow storage services for improving the circumstances that enable practicing of winter sports; Consultancy services relating to storage of snow for improving the circumstances that enable practicing and participating in winter sports | ACTIVE | — |
| 040 | Recycling and waste treatment; recycling of plastic insulating materials | ACTIVE | — |
| 041 | Education and training services, namely, providing classes in the field of engineering; Vocational education and training services, both in the field of insulation; Arranging and conducting of workshops in the field of installation of insulation | ACTIVE | — |
| 042 | Engineering services; Product quality testing, namely, quality checking and testing; Technical testing for testing technical qualities of construction materials to improve their performance and efficiency in terms of building safety and environmental sustainability; product safety testing; materials testing and evaluation; advisory services relating to material testing; Scientific research and industrial research in the field of environmentally sustainable construction; Engineering design services; engineering services in the field of building technology; engineering services in the field of environmental technology; research in the field of materials science; design and development of engineering products; civil engineering | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Sep 26, 2025 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Aug 20, 2023 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Aug 1, 2023 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Aug 1, 2023 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Jul 18, 2023 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Apr 18, 2023 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Apr 18, 2023 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Feb 1, 2023 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Jan 31, 2023 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Jan 31, 2023 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jan 11, 2023 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Jan 11, 2023 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Jan 11, 2023 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Dec 28, 2022 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Dec 28, 2022 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Dec 28, 2022 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Dec 28, 2022 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Dec 28, 2022 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Dec 1, 2022 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Dec 1, 2022 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Dec 1, 2022 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jul 19, 2022 | RFNT | REFUSAL PROCESSED BY IB | — |
| Jun 28, 2022 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Jun 28, 2022 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Jun 11, 2022 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Jun 10, 2022 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jun 3, 2022 | DOCK | ASSIGNED TO EXAMINER | — |
| Dec 3, 2021 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Nov 29, 2021 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Nov 25, 2021 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |