Drawing for CONNECT

USPTO serial 79327708

CONNECT

Reviewed by CopyMark Law Group

Reg. 6932767Status 700Registered
Filing date
Status date
Registration date
Dec 27, 2022
Examiner
LEE, JEANIE H
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with CONNECT?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Shoko Naruo

Shoko Naruo Thompson Coburn LLPOne US Bank PlazaSt. Louis, MO 63101UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
006Transport containers of metal for the construction industry; shuttering of metal for concrete, namely, metal casting forms for concrete; transport silos of metal; stationary silos of metal; containers, tanks and silos of metal for storing liquids, storing building materials, storing fine-grained bulk materials, storing dry bulk and mixed materials, transport of building materials; metal storage containers for high-density solids and concrete; pipes, tubes and industrial hoses, and valves therefor not being parts of machines, all of metalACTIVE—
007Pumps being machines, namely, concrete pumps, mortar pumps, mixing pumps ; conveyors being machines and pneumatic transporters; mixers and mixing installations, namely, mixing machines for the construction and building material industry; machines and mechanical apparatus and installations consisting thereof and parts therefor for manufacturing, processing, transport and use of raw materials, building materials and building and construction materials, namely, mixing machines in the nature of continuous mixers, pumps for mortar and concrete and conveyors; stationary and mobile concrete, mortar and sludge pumps; feed pumps; conveyor belts; silo mixing installations, namely, mixing machines; silo mixing pumps, namely, concrete pumps, mortar pumps, building material mixing pumps; silo conveying system comprised of conveyor lines and belts; feeder machines, namely, feed mixers; feeding machines, namely, feed mixers; high-density solid pumps, namely, concrete pumps, mortar pumps, building material mixing pumps; mixing installations, namely, mixing machines; mixing machines; mechanical mixing machines; mixing machines and concrete pumps, mortar pumps, building material mixing pumps, namely, mobile mixing and pumps installations for liquid and semi-solid materials, in particular screed, mortar, plaster, and vehicle chassis therefor; mechanical spreaders for spreading liquid, paste-like or loose building materialsACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
May 9, 2023FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Apr 13, 2023FICSFINAL DISPOSITION NOTICE SENT TO IB—
Apr 13, 2023FIMPFINAL DISPOSITION PROCESSED—
Mar 27, 2023FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Dec 27, 2022NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Dec 27, 2022R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Oct 11, 2022NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Oct 11, 2022PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Oct 10, 2022GPNXNOTIFICATION PROCESSED BY IB—
Sep 21, 2022OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Sep 21, 2022OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Sep 21, 2022NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Sep 8, 2022CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Aug 2, 2022TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Aug 2, 2022ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Aug 2, 2022REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Jul 27, 2022TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jul 27, 2022CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jul 27, 2022TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Feb 14, 2022RFNTREFUSAL PROCESSED BY IB—
Jan 27, 2022RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Jan 27, 2022RFRRREFUSAL PROCESSED BY MPU—
Jan 6, 2022RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Jan 5, 2022CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 14, 2021MAFRAPPLICATION FILING RECEIPT MAILED—
Dec 10, 2021DOCKASSIGNED TO EXAMINER—
Dec 10, 2021NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Dec 9, 2021REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance