USPTO serial 79329437
Reviewed by CopyMark Law Group
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Alice Denenberg
Alice Denenberg Gottlieb, Rackman & Reisman, P.C.270 Madison Ave, Floor 8New York, NY 10016UNITED STATES| Class | Description | Status | First use |
|---|---|---|---|
| 006 | Common metals and their alloys; Metal building materials, namely, stainless steel, and liquid metal elastomer; metal supports for use in the construction of barriers that prevent the penetration of water and any other liquid; flood barriers of metal | ACTIVE | — |
| 009 | Instruments for measuring water levels; Electric measuring apparatus, namely, apparatus for measuring water levels, water mass, retention basins and any industrial and chemical liquids; sensors, detectors and monitoring instruments, namely, pressure sensor, laser sensors for water, motion sensor, turbidity control sensor and sensor for calculating the flow velocity of a liquid; Electronic-based instruments for measuring environmental parameters including humidity, water level, movements, shocks and debris impacts, and liquid current; level indicators for water and any other liquid; Luminous and mechanical warning signs; pressure measuring apparatus; observation instruments, namely a downloadable computer software to alert users on protection from flooding; electric and electronic alarms for detecting the presence and level of water and any other liquid; Remote control for remote controlled valves | ACTIVE | — |
| 017 | Packing and insulating materials of rubber or plastic; caulking materials to prevent and resist water, mud and or other liquid; Sealing and insulating materials | ACTIVE | — |
| 019 | Prefabricated building assemblies, not of metal; transportable buildings not of metal; Construction materials, namely, thermoformed plastic, injection molded plastic, and composite plastic; flood protection apparatus and systems, being non-metallic building elements, namely, thermoformed plastic, injection molded plastic, and composite plastic; non-metallic building elements, namely, devices for preventing water and all liquids from entering into buildings, namely free-standing barriers; non-metallic building elements, namely temporary devices for protection against infiltrations and floods namely ready-to-assemble protection barriers; non-metallic semi-permanent barriers for flood prevention and portable flood barriers; non-metallic transportable buildings, namely, mobile protective barriers made of plastic against infiltration and floods; non-metallic transportable buildings, namely, flexible modular protection barriers for fast installation against floods; Portable non-metal free-standing barriers to absorb flood water; replacement parts therefor | ACTIVE | — |
| 037 | Construction, installation, repair and maintenance of flood protection systems; installation, repair and maintenance of flood warning systems; civil engineering in connection with the prevention of flooding of land and buildings; advisory services with respect to the installation of flood prevention equipment; Consultation and advice in the field of installation of flood prevention equipment; Flood protection system construction, installation, repair, and maintenance information and consultation services | ACTIVE | — |
| 042 | Design and development of flood protection systems; design and development of engineering works for flood prevention; Engineering advisory services with respect to flood prevention; technical advisory services with respect to civil engineering; Scientific and industrial research of methods for detecting and preventing flooding; design and development of computers and software; design and development of computer hardware and software for flood warning systems; providing temporary use of non-downloadable software for flood prevention; software as a service services featuring software for flood monitoring and flood warning services; Consultation and advice in the field of design and development of flood prevention systems, and flood prevention computer software | ACTIVE | — |
| 045 | Safety services for the civil protection of property and persons; Security services for buildings, namely security services for the physical protection of tangible property; Security threat analysis for protecting personal safety and tangible property; legal advice for responding to calls for tenders with respect to environmental risks | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Sep 17, 2023 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Aug 24, 2023 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Aug 24, 2023 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Aug 23, 2023 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| May 23, 2023 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| May 23, 2023 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Mar 7, 2023 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Mar 7, 2023 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Mar 6, 2023 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Feb 15, 2023 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Feb 15, 2023 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Feb 15, 2023 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Feb 1, 2023 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jan 31, 2023 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Jan 31, 2023 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Jan 31, 2023 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Jan 31, 2023 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Jan 4, 2023 | LIME | LIMITATION FROM THE IB - REQUEST EXAM REVIEW | — |
| Oct 31, 2022 | CHAN | APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED | — |
| Oct 31, 2022 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Oct 31, 2022 | ECDR | TEAS CHANGE OF DOMESTIC REPRESENTATIVES ADDRESS | — |
| Oct 31, 2022 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Oct 31, 2022 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Oct 31, 2022 | COAR | TEAS CHANGE OF OWNER ADDRESS RECEIVED | — |
| Sep 20, 2022 | RFNT | REFUSAL PROCESSED BY IB | — |
| Sep 18, 2022 | LIMG | LIMITATION OF GOODS RECEIVED FROM IB | — |
| Aug 26, 2022 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Aug 26, 2022 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Aug 3, 2022 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Aug 2, 2022 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jul 27, 2022 | DOCK | ASSIGNED TO EXAMINER | — |
| Jan 7, 2022 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Jan 3, 2022 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Dec 23, 2021 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |