USPTO serial 79329511
Reviewed by CopyMark Law Group
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Peter J. Philips
Peter J. Philips Lucas & Mercanti, LLP30 Broad Street21st FloorNew York, NY 10004| Class | Description | Status | First use |
|---|---|---|---|
| 006 | Pipes and piping of non-ferrous metals, metal alloys, steel, particularly finned tubes, capillary tubes, spring tubes, pipes for gas, steam, liquids, water and pipes and piping for gasoline, lubricating and cooling materials; flexible pipes, particularly flexible pipes of metal; containers of metal for storage or transport, storage tanks made of non-ferrous metals, metal alloys and steel; wires made of non-ferrous metals, metal alloys and steel, particularly welding and soldering wires; sheets, strips, semi-wrought foils, semi-wrought plates, ingots, bars for further manufacture and profiles of non-ferrous metals, metal alloys and steel; construction parts in the nature of sheets of non-ferrous metals, metal alloys and steel, being rolled, pressed, stamped, cast, extruded and forged; mechanically shaped metal pipe fittings, particularly drilled, turned, milled, pressed, forged and stamped metal pipe fittings; Metal valves not being parts of machines, particularly metal valves for compressed and liquefied gases and for fire extinguishers; springs made of non-ferrous metals, metal alloys and steel | ACTIVE | — |
| 007 | Pipes and piping, particularly tubes being parts of heat exchangers and for condensers where the heat exchanges are condensers are parts of machines; steam engine boilers made of non-ferrous metals, metal alloys, steel and of plastic materials; construction parts, namely, parts for power-operated lifting equipment for construction use where the parts are made of non-ferrous metals, metal alloys, steel and plastic materials, being rolled, pressed, stamped, cast, extruded and forged; washing and spin-drying machines for laundries and structural parts thereof; valves, particularly valves for pumps for use with compressed and liquefied gases | ACTIVE | — |
| 009 | Containers specially adapted for holding fire extinguishers, made of non-ferrous metals, metal alloys, steel and of plastic materials; Metal alloy wires for electrical fuses; electrical resistance heating wires and resistance wires; construction parts of non-ferrous metals, metal alloys, steel and plastic materials being rolled, pressed, stamped, cast, extruded and forged, namely, metal and plastic safety valves for flow shutoff in well construction | ACTIVE | — |
| 011 | Pipes and piping, particularly tubes being structural parts of heat exchangers where the heat exchangers are not parts of machines; tubes being structural parts for electric coolers, piping for cooling materials, namely, heat pipes to cool heat producing components; Industrial boilers made of non-ferrous metals, metal alloys, steel and of plastic materials; cooling installations for water; air cooling apparatus; domestic Refrigerators; commercial refrigerators; coils as parts of distilling, heating or cooling installations; pipes being parts of refrigerators and evaporators for refrigerating equipment; coolers being component parts of refrigerators and evaporators for refrigerating equipment; low-temperature refrigerators; Air evaporators for refrigerating equipment, Dryers for commercial and domestic refrigerating equipment and refrigerators; flushing basins being parts of sanitary installations; plumbing fittings, namely, steam valves; gas, air and water pipes being parts of sanitary installations | ACTIVE | — |
| 017 | Flexible plumbing pipes of plastic, namely finned tubes, capillary tubes, spring tubes; Flexible plastic pipes for conveying natural gas, steam, liquids and water; flexible pipes being for plumbing purposes; Extruded plastic in the form of sheets, strips, foils, plates, ingots, bars and profiles for use in manufacturing; Extruded semi-finished goods made of synthetic materials in the forms of plates, bars, pipes and flexible hoses for construction use | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Jul 2, 2026 | RNWL | INTERNATIONAL REGISTRATION RENEWED | — |
| Nov 12, 2023 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Oct 25, 2023 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Oct 25, 2023 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Oct 25, 2023 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Jul 25, 2023 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Jul 25, 2023 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jun 12, 2023 | OPNX | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB | — |
| May 24, 2023 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| May 24, 2023 | OPNR | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | — |
| May 16, 2023 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| May 9, 2023 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| May 9, 2023 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Apr 19, 2023 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Apr 19, 2023 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Apr 19, 2023 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Mar 31, 2023 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Mar 30, 2023 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Mar 30, 2023 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Mar 30, 2023 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Mar 30, 2023 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Oct 4, 2022 | AMPX | PRELIMINARY/VOLUNTARY AMENDMENT - ENTERED | — |
| Oct 4, 2022 | PARI | TEAS VOLUNTARY AMENDMENT RECEIVED | — |
| Sep 29, 2022 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Sep 29, 2022 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Sep 29, 2022 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Apr 24, 2022 | RFNT | REFUSAL PROCESSED BY IB | — |
| Mar 29, 2022 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Mar 29, 2022 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Feb 26, 2022 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Feb 25, 2022 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Feb 15, 2022 | DOCK | ASSIGNED TO EXAMINER | — |
| Jan 7, 2022 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Jan 3, 2022 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Dec 23, 2021 | SDRC | SN ASSIGNED FOR SECT 66A SUBSEQ DESIG FROM IB | — |