Drawing for SUREWAVE SFC

USPTO serial 79329726

SUREWAVE SFC

Reviewed by CopyMark Law Group

Reg. 7198016Status 700Registered
Filing date
Status date
Registration date
Oct 24, 2023
Examiner
CAPSHAW, DANIEL
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with SUREWAVE SFC?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

JAMES R MENKER

JAMES R MENKER HOLLEY & MENKER PAPO BOX 331937ATLANTIC BEACH, FL 32233UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
007Machines and machine tools, namely, AC generators and electric current generators; direct current generators; high-voltage generators; all the foregoing used to allow large ships and industrial machinery to operate in different locations where the power supply from the grid differs and for industrial and marine applications where stabilization with an electrical grid is required or where compatibility of grid load is required.ACTIVE—
009Apparatus and instruments for managing, distributing, converting, storing, regulating or controlling electricity, including spare parts for such apparatus, namely, frequency converters, electronic frequency converters for high velocity electro motors, electric converters and current converters; Downloadable and recorded computer software for connecting powered equipment to power supplies, for stabilizing frequency and voltage to allow the correct operation of sensitive equipment, and for regulating electric frequencies; Apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling electricity, namely, distribution systems for electric current being uninterruptible power supply installations; all the foregoing used to allow large ships and industrial machinery to operate in different locations where the power supply from the grid differs and for industrial and marine applications where stabilization with an electrical grid is required or where compatibility of grid load is required.ACTIVE—
037Repair, installation and maintenance services in the field of electric power sources for machines, drive systems, vehicles and industrial equipment; providing advisory services on repair, installation and maintenance in the field of electronic power sources for machines, drive systems, vehicles and industrial equipment; maintenance, installation and repair of computer hardware and computer network hardware installations; Installation, maintenance and repair of machinery, apparatus and equipment all for conducting, switching, transforming, accumulating, regulating or controlling electricity; Installation, maintenance and repair, for purposes of noise suppression, of machinery, apparatus and equipment all for conducting, switching, transforming, accumulating, regulating or controlling electricity; installing and servicing power generators and energy supply installations; advisory services with respect to the aforesaid repair and installation servicesACTIVE—
042Scientific research; scientific testing and analysis services in the field of electricity; engineering consultant services; engineering research services; technological research in the fields of energy production and supply, electricity and power control systems, electricity and power generating machines and machine tools, computer hardware and software; scientific and technological research and development; technological advice in the fields of electricity production and supply, electricity and power control systems, electricity and power generating machines and machine tools, computer hardware and softwareACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Feb 14, 2024FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Jan 24, 2024FICSFINAL DISPOSITION NOTICE SENT TO IB—
Jan 24, 2024FIMPFINAL DISPOSITION PROCESSED—
Jan 24, 2024FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Oct 24, 2023NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Oct 24, 2023R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Aug 14, 2023GPNXNOTIFICATION PROCESSED BY IB—
Aug 8, 2023NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Aug 8, 2023PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jul 26, 2023OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Jul 26, 2023OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Jul 19, 2023NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Jul 5, 2023CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jun 27, 2023ALIEASSIGNED TO LIE—
Jun 23, 2023GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Jun 23, 2023GNEAEXAMINERS AMENDMENT E-MAILED—
Jun 23, 2023CNEAEXAMINERS AMENDMENT -WRITTEN—
Jun 18, 2023OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Jun 5, 2023JURTJURISDICTION RESTORED TO EXAMINING ATTORNEY—
Jun 3, 2023ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
May 31, 2023OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
May 31, 2023OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Apr 15, 2023GEA1NOTIFICATION OF ACTION DENYING REQ FOR RECON E-MAILED—
Apr 15, 2023GECDACTION DENYING REQ FOR RECON E-MAILED—
Apr 15, 2023CNCFACTION CONTINUING FINAL - COMPLETED—
Mar 26, 2023ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
Mar 26, 2023EXPIEX PARTE APPEAL-INSTITUTED—
Mar 26, 2023JURTJURISDICTION RESTORED TO EXAMINING ATTORNEY—
Mar 26, 2023EXAFEXPARTE APPEAL RECEIVED AT TTAB—
Jan 8, 2023GNFNNOTIFICATION OF FINAL REFUSAL EMAILED—
Jan 8, 2023GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Jan 8, 2023CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Nov 24, 2022TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Nov 23, 2022CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Nov 23, 2022TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Sep 20, 2022RFNTREFUSAL PROCESSED BY IB—
Aug 26, 2022RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Aug 26, 2022RFRRREFUSAL PROCESSED BY MPU—
Aug 3, 2022RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Aug 2, 2022CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 1, 2022DOCKASSIGNED TO EXAMINER—
Jan 8, 2022MAFRAPPLICATION FILING RECEIPT MAILED—
Jan 4, 2022NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Dec 30, 2021REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance