Drawing for STATERON

USPTO serial 79329864

STATERON

Reviewed by CopyMark Law Group

Reg. 7147369Status 700Registered
Filing date
Status date
Registration date
Aug 29, 2023
Examiner
HISER, CHARLES
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with STATERON?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Jeffrey C. Joyce

Jeffrey C. Joyce Eaton Peabody204 Main St.Ellsworth, ME 04605United States

Goods and services

ClassDescriptionStatusFirst use
037Installation, maintenance and repair of biogas installations, conveyor installations and conveyor machines; construction of biogas plants; construction of wind power plants; conversion of biogas installations to improve overall efficiency being construction and installation services; construction consultancy; building construction supervision; construction of biogas fermentation reactors; building construction supervision services for building projects; site preparation being building construction services; building, construction and demolitionACTIVE—
040Gas production services; electricity generating; electricity generation, gas generation and heat generation through operation of biogas installationsACTIVE—
042Engineering services; engineering in the field of generating electricity, biogas and natural gas; construction drafting; technical construction and engineering drafting and planning of biogas plants and plants for power generation; conducting technical project studies being scientific research; civil engineering planning services; building design services; preparation of architectural plans being construction drafting; engineering design and consultancy; technological consultancy; control technology consulting services; architectural consultancy; advisory services relating to architectural planning applications; scientific laboratory services; biological laboratory services, namely testing of substrate samples of biogas fermentation reactors; bacteriological analysis of substrate samples of biogas fermentation reactors; technological engineering analysis being engineering consulting; rental of laboratory apparatus and instruments; services of a chemical and/or biological laboratory, namely testing of substrate samples of biogas fermentation reactors; mechanical engineeringACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jan 31, 2025TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Jan 31, 2025ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jan 31, 2025REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Oct 11, 2024NREPNEW REPRESENTATIVE AT IB RECEIVED—
Dec 26, 2023FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Nov 30, 2023FICSFINAL DISPOSITION NOTICE SENT TO IB—
Nov 30, 2023FIMPFINAL DISPOSITION PROCESSED—
Nov 29, 2023FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Oct 1, 2023NREPNEW REPRESENTATIVE AT IB RECEIVED—
Aug 29, 2023NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Aug 29, 2023R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jun 19, 2023OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Jun 13, 2023GPNXNOTIFICATION PROCESSED BY IB—
Jun 13, 2023NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Jun 13, 2023PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
May 31, 2023OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
May 31, 2023OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
May 24, 2023OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
May 24, 2023OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
May 24, 2023NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
May 10, 2023CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Apr 20, 2023TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Apr 19, 2023CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Apr 19, 2023TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Nov 8, 2022RFNTREFUSAL PROCESSED BY IB—
Oct 20, 2022RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Oct 20, 2022RFRRREFUSAL PROCESSED BY MPU—
Sep 24, 2022ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB—
Aug 30, 2022RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Aug 29, 2022CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 23, 2022DOCKASSIGNED TO EXAMINER—
Jan 8, 2022MAFRAPPLICATION FILING RECEIPT MAILED—
Jan 4, 2022NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Dec 30, 2021REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance