USPTO serial 79329884
Reviewed by CopyMark Law Group
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Peter Sloane
Peter Sloane LEASON ELLIS LLPOne North Lexington Ave., Suite 1200WHITE PLAINS, NY 10601United States| Class | Description | Status | First use |
|---|---|---|---|
| 006 | Building and construction materials, namely, metal cable management systems comprised of cable trays, cable clamps, lids and casings; Building and construction materials, namely, metal flooring panels; downpoles of metal for the distribution of cables; cable trunking of metal for electric cables; pipes, tubes and hoses, and fittings therefor, including valves, all of metal; cable clamps of metal; binding screws of metal for cables; cable supports made of metal; small items of metal hardware, namely, namely screws, bolts and clamps for cable management systems | ACTIVE | — |
| 009 | Apparatus and instruments for accumulating and storing electricity; apparatus and instruments for controlling electricity; electrical and electronic components, namely, protection casings and housings for wireless-charging pads and cables; electrical connector housings; conduit for electric cables; electrical cabling; electronic load modules; charging stations for electric vehicles; junction boxes; junction boxes for electric wires; electrical distributors; none of the aforesaid goods being adapted or arranged as parts of or for use with welding apparatus or with fittings for welding apparatus | ACTIVE | — |
| 019 | Building and construction materials and elements, not of metal, namely underfloor cable management systems comprising of cable trays, cable ladders, support brackets, fastenings and floor ducts made from synthetics; building and construction materials and elements made of sand, stone, rock, clay, minerals and concrete, namely protection lids for heavy-duty underfloor systems made from concrete-synthetics mixtures; shutterings, not of metal, for concrete, namely, casting forms for concrete | ACTIVE | — |
| 020 | non-metal cable fasteners, connectors and holders, namely, bolts, rivets and nails | ACTIVE | — |
| 037 | Building construction and demolition; erection of prefabricated buildings and structures | ACTIVE | — |
| 040 | Contract moulding services | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Jul 14, 2025 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Jul 14, 2025 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jul 14, 2025 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Jan 13, 2024 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Dec 27, 2023 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Dec 26, 2023 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Dec 26, 2023 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Sep 26, 2023 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Sep 26, 2023 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jul 11, 2023 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Jul 11, 2023 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jul 10, 2023 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Jun 21, 2023 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Jun 21, 2023 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Jun 21, 2023 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Jun 19, 2023 | OPNX | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB | — |
| Jun 5, 2023 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| May 31, 2023 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| May 31, 2023 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| May 31, 2023 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| May 31, 2023 | ERFR | TEAS REQUEST FOR RECONSIDERATION RECEIVED | — |
| May 31, 2023 | OPNR | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | — |
| Dec 19, 2022 | ADCH | CHANGE OF NAME/ADDRESS REC'D FROM IB | — |
| Dec 8, 2022 | GNFN | NOTIFICATION OF FINAL REFUSAL EMAILED | — |
| Dec 8, 2022 | GNFR | FINAL REFUSAL E-MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Dec 8, 2022 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Nov 16, 2022 | LIME | LIMITATION FROM THE IB - REQUEST EXAM REVIEW | — |
| Nov 3, 2022 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Nov 3, 2022 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Nov 3, 2022 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Oct 25, 2022 | CHAN | APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED | — |
| Oct 25, 2022 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Oct 25, 2022 | ECDR | TEAS CHANGE OF DOMESTIC REPRESENTATIVES ADDRESS | — |
| Oct 25, 2022 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Oct 25, 2022 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Oct 25, 2022 | COAR | TEAS CHANGE OF OWNER ADDRESS RECEIVED | — |
| Oct 15, 2022 | CHLD | CHANGE OF OWNER RECEIVED FROM IB | — |
| Sep 18, 2022 | LIMG | LIMITATION OF GOODS RECEIVED FROM IB | — |
| May 25, 2022 | RFNT | REFUSAL PROCESSED BY IB | — |
| May 5, 2022 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| May 5, 2022 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Apr 30, 2022 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Apr 29, 2022 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Apr 27, 2022 | DOCK | ASSIGNED TO EXAMINER | — |
| Jan 8, 2022 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Jan 4, 2022 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Dec 30, 2021 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |